REQUEST FOR INFORMATION / CLARIFICATION FORM
FOR CONTRACTOR USE ONLY
CONTRACT NO:
DDPM 160001
RFI NO: IES-02 DATE (YYYYMMDD)
2015/08/22
SUBJECT:
Vent Hood
DRAWING REFERENCE/ DETAIL:
SOW 3.8.14
ATTACHMENT SENT UNDER SEPARATE
COVER(__)
RESPONSE NEEDED BY:ASAP
REQUEST:
As per SOW section 3.8.14 contractor is to provide/install (1) new industrial wall mounted vent/exhaust hood.
This requirement is vague and does not provide enough information for a design basis.
PROPOSED SOLUTION (If applicable):
Provide a part/model number of a commercially available vent hood to use as a design basis.
OR
Provide adequate information as to the intended use of the vent hood to use as a design basis.
OR
Provide specifications for the dimensions, air flow rating, and equipment finish to use as a design basis.
TO(Contracting Officer): 301 CONF/LGC
FROM (Contractor):
Izoro Electrical Systems inc.
DATE (YYYYMMDD)
2015/08/22
TYPE OR PRINT NAME AND TITLE
Samuel Blakley/General Manager
SIGNATURE:
FOR GOVERNMENT USE ONLY
FROM CONTRACTING TO:
BCE: Charles Tehan (__); Robert Dudley(__; OR OTHER(__)
For Evaluation and Action
DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:
RFI RESPONSE / CLARIFICATION (refer to page 2)
RFI RESPONSE / CLARIFICATION:-
1101986434C Stamp
REQUEST FOR INFORMATION / CLARIFICATION FORM
Government to complete following sections:
TO: AF Contractiing Office From Responding Agency
TO:(Contractor from Contracting Officer
CONTRACTOR REVIEW
After reviewing the Government response, does the contractor anticipate A change order will be required? YES NO There will be an increase in the cost of the project? YES NO
Reviewer:
*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proporsal), they will be notified by the contracting office.
1101986434C Typewritten Text In section 3.8.14., it stated that a new electric industrial wall mounted vent/exhaust hood shall be mounted on the west interior interior wall of Room 106. The vent hood itself shall run on 120/208V power and measure 48 Inches in width. The CFM rating shall be 1200, the construction shall be stainless steel, and the duct size shall be 10" in diameter. Use the Zephyr model ZSP-E48A for an example. The reason for installing a vent hood is to extract the fumes from a solvent tank used to clean military small arms.
1101986434C Typewritten Text
1101986434C Typewritten Text 20150825
1101986434C Typewritten Text Charles D. Tehan, GS-11, USAFR Engineering Technician, 301 MSG/BCE
1101986434C Typewritten Text
1376454971C Typewritten Text 20150825
1376454971C Typewritten Text Yvette Todtenhoefer, Contracting Officer
| 2015-08-25T17:15:46-0500 | |
| TEHAN.CHARLES.D.1101986434 |
| 2015-08-25T17:32:01-0500 | |
| TODTENHOEFER.YVETTE.1376454971 |