FA6675-15-R-0006_B1344_Solicitation_Amendment_0002.pdf

PDF 57 KB Posted

Attached to
B1344 RENOVATIONS Solicitation # FA6675-15-R-0006
Solicitation number
FA6675-15-R-0001
Issued by

About this file

B1344 Solicitation Amendment 0002

View the file

Other files

File Type Posted
FA6675-15-R-0006_B1344_Solicitation_Amendment__4.pdf PDF
RFI_0006AIP_B1344_20150831.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_4_08312015.pdf PDF
1344_-_301_CATAM_-_HVAC_Installation_Plan.pdf PDF
FA6675-15-R-0006_0003_B1344_Amendment__3.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_3_08252015.pdf PDF
1344_-_301_CATAM_-_Electrical_Power_Plan.pdf PDF
RFI_0002IES_20150822.pdf PDF
RFI_0003IES_20150822.pdf PDF
RFI_0001IES_20150822.pdf PDF
RFI_0001MCI_20150817-signed.pdf PDF
RFI_0003AIP_20150812-signed.pdf PDF
RFI_0005DME_20150818.pdf PDF
RFI_0004AIP_20150812.pdf PDF
RFI_0002AIP_20150812-Signed.pdf PDF
RFI_0003DME_20150804-signed.pdf PDF
RFI_0004DME_20150811-signed.pdf PDF
RFI_0002DME_20150804.pdf PDF
RFI_0001DME_20150804.pdf PDF
1344_-_301_CATAM_-_Plumbing_Work_Required.pdf PDF
1344_-_301_CATAM_-_Lighting_Installation_Plan.pdf PDF
1344_-_301_CATAM_-_Plumbing_DEMO_Plan.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_2-1_08032015.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev08032015.pdf PDF
B1344_Current_Exterior_Dimensions.pdf PDF
B1344_Interior_Dimensions_Post_Construction.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev06172015.pdf PDF
B1344_Existing_Concrete_Dimensions.pdf PDF
B1344_Electrical_Power_Plan.pdf PDF
B1344_Ceiling_Demo_Plan.pdf PDF
FA6675-15-R-0006_B1344_Solicitation_Amendment_0001.pdf PDF
B1344_Comm_Plan.pdf PDF
WD_TX150322_03062015_TX322.pdf PDF
B1344_HVAC_Demo_Plan_Model_2.pdf PDF
B1344_Concrete_Work_Required.pdf PDF
B1344_Flooring_Install.pdf PDF
B1344_Exterior_Dimensions_Post_Construction.pdf PDF
B1344_Ceiling_Install.pdf PDF
B1344_Lighting_Demo_Plan.pdf PDF
B1344_Rm_102_Millwork.pdf PDF
B1344_Electrical_Demo_Plan.pdf PDF
B1344_HVAC_Installation_Plan.pdf PDF
B1344_Current_Interior_Dimensions.pdf PDF
B1344_Fire_Suppression_Install.pdf PDF
B1344_Current_Fire_Suppression.pdf PDF
FA6675-15-R-0006_B1344_CATM_Solicitation.pdf PDF
RFI_-RFC_FORM_20150420.doc DOC document
B1344_HVAC_Demo_Plan_Model_1.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

301ST CONF/LGC - RONALD PYLES

1776 CARSWELL AVE

NAS JRB

FORT WORTH TX 76127

DDPM 16-0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to correct the Proposal Organization instructions in Section L and experience criteria for Project Manager and Superintendent positions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Aug-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA6675-15-R-0006

X 9B. DATED (SEE ITEM 11)

24-Jun-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Aug-2015

CODE

301ST CONF/LGC

1776 CARSWELL AVE

NAS JRB

FT. WORTH TX 76127-6200

FA6675 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE FA6675

FACILITY CODECODE

EMAIL:TEL:

FA6675-15-R-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

PROPOSAL PREPARATION

L-01. PROPOSAL PREPARATION INSTRUCTIONS

Proposal Organization Table of Contents Title Copies Page Limit (per copy)

Cover Page Two (2) Part I Price Proposal Two (2) paper; One (1) electronic Twenty (20)

SF 1442

Reps & Certifications Bid Bond Information

Part II Technical Proposal Two (2) paper; One (1) electronic Twenty (20)

Subfactor (a) – Project Management Subfactor (b) – Key Personnel

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors.

Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of two (2) separate parts; Part I - Price Proposal and Part II - Technical Proposal.

B. Point of Contact - The Contracting Officer (CO) is the sole point of contact for this acquisition. Address any questions or concerns you may have to the CO. Written requests for clarification may be sent to the CO at the address located in Section A of the model contract/solicitation.

C. Debriefings - The CO will promtly notify offerors of any decision to exclude them from the competitive range;

whereupon, they may request and receive a debriefing in accordance with FAR 15.505. Offerors excluded from the competitive range may request a pre-award debriefing or they may choose to wait until after the source selection decision to request a post-award debriefing. However, offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal. The CO will notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsucessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.

D. Specific Instructions:

1. PART I – PRICE PROPOSAL - Submit original plus two (2) paper copies and one (1) electronic file (PDF, email). Copies shall be titled: FA6675-15-R-0006 – COMPANY NAME – “PRICE”

(a) Complete blocks 14, 15, 16, 17 and 18 of the RFP Section A, SF1442. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.

(b) Insert proposed unit price in Section B for each Contract Line Item Number (CLIN).

(c) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.

(d) The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional data will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists; offerors may be required to submit http://www.gsa.gov/Portal/gsa/ep/formslibrary.do?viewType=DETAIL&formId=4E179AB32AF6652285256A260054D101

FA6675-15-R-0006

cost data to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.

2. PART II – TECHNICAL PROPOSAL - Limited to no more than 20 pages. Submit original plus two

(2) paper copies and one (1) electronic file (PDF, email).

(a) Subfactor – Project Management: Provide an organizational chart that delineates by position and function all personnel directly involved in this project, from the project management to the subcontractors. The chart should clearly identify the management staff positions anticipated to be utilized (i.e. quality assurance, project manager, superintendent). A Management Plan should also be submitted for the following: describe the anticipated phases of construction from site preparation to closeout; describe how communications with the government shall be addressed, focusing in particular on problem avoidance/resolution.

(b) Subfactor - Key Personnel Qualifications: Identify the key project personnel that will be employed on this project (i.e. Project Manager, Construction Quality Control Manager, and Superintendent) and provide documentation that they have the qualifications and experience to perform under the contract. Experience standards for Project Manager, Superintendent and QA Manager are defined on the following table:

Table 1 – Personnel Qualifications Position Experience Standard Documentation Req’d

Project Manager Managing or supervising at least two (2) recent projects of similar scope and size, from award through project completion within the past five years.

References/Resume

Superintendent Experience as a superintendent on at least two (2) recent projects of similar scope and size, from award through project completion within the past five years.

References/Resume

Construction Quality Control Manager

Documentation of quality assurance training ≥ three (3) years experience. References/Resume

D. Documents submitted in response to this RFP must be fully responsive to and consistent with the following:

1. Requirements of the RFP (CLIN & SOW) and government standards and regulations pertaining to the SOW.

2. Evaluation Factors for Award in Section M of this RFP.

3. Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this

Section L will not be read or evaluated, and will be removed from the proposal.

4. Format for proposal Part II shall be as follows:

(a) The proposals will be 8 1/2” x 11” paper except for fold-outs used for charts, tables, or diagrams, which may not exceed 11” x 17”.

(b) A page is defined as one face of a sheet of paper containing information.

(c) Typing shall not be less than 12 pitch.

(d) Elaborate formats, bindings or color presentations are not desired or required.

(End of Summary of Changes)