RFI_0003IES_20150822.pdf

PDF 152 KB Posted

Attached to
B1344 RENOVATIONS Solicitation # FA6675-15-R-0006
Solicitation number
FA6675-15-R-0001
Issued by

About this file

RFI 0003IES 20158022 response

View the file

Other files

File Type Posted
FA6675-15-R-0006_B1344_Solicitation_Amendment__4.pdf PDF
RFI_0006AIP_B1344_20150831.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_4_08312015.pdf PDF
1344_-_301_CATAM_-_HVAC_Installation_Plan.pdf PDF
FA6675-15-R-0006_0003_B1344_Amendment__3.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_3_08252015.pdf PDF
1344_-_301_CATAM_-_Electrical_Power_Plan.pdf PDF
RFI_0002IES_20150822.pdf PDF
RFI_0001IES_20150822.pdf PDF
RFI_0001MCI_20150817-signed.pdf PDF
RFI_0003AIP_20150812-signed.pdf PDF
RFI_0005DME_20150818.pdf PDF
RFI_0004AIP_20150812.pdf PDF
RFI_0002AIP_20150812-Signed.pdf PDF
FA6675-15-R-0006_B1344_Solicitation_Amendment_0002.pdf PDF
RFI_0003DME_20150804-signed.pdf PDF
RFI_0004DME_20150811-signed.pdf PDF
RFI_0002DME_20150804.pdf PDF
RFI_0001DME_20150804.pdf PDF
1344_-_301_CATAM_-_Plumbing_Work_Required.pdf PDF
1344_-_301_CATAM_-_Lighting_Installation_Plan.pdf PDF
1344_-_301_CATAM_-_Plumbing_DEMO_Plan.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_2-1_08032015.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev08032015.pdf PDF
B1344_Current_Exterior_Dimensions.pdf PDF
B1344_Interior_Dimensions_Post_Construction.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev06172015.pdf PDF
B1344_Existing_Concrete_Dimensions.pdf PDF
B1344_Electrical_Power_Plan.pdf PDF
B1344_Ceiling_Demo_Plan.pdf PDF
FA6675-15-R-0006_B1344_Solicitation_Amendment_0001.pdf PDF
B1344_Comm_Plan.pdf PDF
WD_TX150322_03062015_TX322.pdf PDF
B1344_HVAC_Demo_Plan_Model_2.pdf PDF
B1344_Concrete_Work_Required.pdf PDF
B1344_Flooring_Install.pdf PDF
B1344_Exterior_Dimensions_Post_Construction.pdf PDF
B1344_Ceiling_Install.pdf PDF
B1344_Lighting_Demo_Plan.pdf PDF
B1344_Rm_102_Millwork.pdf PDF
B1344_Electrical_Demo_Plan.pdf PDF
B1344_HVAC_Installation_Plan.pdf PDF
B1344_Current_Interior_Dimensions.pdf PDF
B1344_Fire_Suppression_Install.pdf PDF
B1344_Current_Fire_Suppression.pdf PDF
FA6675-15-R-0006_B1344_CATM_Solicitation.pdf PDF
RFI_-RFC_FORM_20150420.doc DOC document
B1344_HVAC_Demo_Plan_Model_1.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION / CLARIFICATION FORM

FOR CONTRACTOR USE ONLY

CONTRACT NO:

DDPM 160001

RFI NO: IES-03 DATE (YYYYMMDD)

2015/08/22

SUBJECT:

Secondary Feeders

DRAWING REFERENCE/ DETAIL:

SOW 3.8

ATTACHMENT SENT UNDER SEPARATE

COVER(__)

RESPONSE NEEDED BY:ASAP

REQUEST:

SOW section 3.8 does not address existing underground or aerial secondary feeders.

PROPOSED SOLUTION (If applicable):

Provide clarification as to whether the existing secondary feeders are to remain for reuse.

TO(Contracting Officer): 301 CONF/LGC

FROM (Contractor):

Izoro Electrical Systems inc.

DATE (YYYYMMDD)

2015/08/22

TYPE OR PRINT NAME AND TITLE

Samuel Blakley/General Manager

SIGNATURE:

FOR GOVERNMENT USE ONLY

FROM CONTRACTING TO:

BCE: Charles Tehan (__); Robert Dudley(__; OR OTHER(__)

For Evaluation and Action

DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:

RFI RESPONSE / CLARIFICATION (refer to page 2)

RFI RESPONSE / CLARIFICATION:-

Government to complete following sections:

1191522202C Typewritten Text X

1191522202C Typewritten Text

1191522202C Typewritten Text 20150824

1191522202C

Ron Pyles, Contract Admin

REQUEST FOR INFORMATION / CLARIFICATION FORM

TO: AF Contractiing Office From Responding Agency

TO:(Contractor from Contracting Officer

CONTRACTOR REVIEW

After reviewing the Government response, does the contractor anticipate A change order will be required? YES NO There will be an increase in the cost of the project? YES NO

Reviewer:

*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proporsal), they will be notified by the contracting office.

1101986434C

1101986434C Typewritten Text The disconnect on the outside of Building 1344 is wired for 200A, 3-phase, 120/208V. The secondary service feeding the facility shall be adequate for the 200 Amp service, but not the 400 Amp service described in paragraph 3.8.12. Therefore, the Statement of Work shall be modified to read new 200A disconnect rather than a 400A disconnect. The secondary feed coming in cannot handle a 400A service.

1101986434C Typewritten Text 20150825

1101986434C Typewritten Text Charles D. Tehan, GS-11, USAFR Engineering Technician, 301 MSG/BCE

1101986434C Typewritten Text

1376454971C Typewritten Text 20150825

1376454971C

Yvette Todtenhoefer, Contracting Officer

2015-08-24T07:20:43-0500
PYLES.RONALD.GENE.1191522202
2015-08-25T16:08:13-0500
TEHAN.CHARLES.D.1101986434
2015-08-25T17:30:09-0500
TODTENHOEFER.YVETTE.1376454971

File details come from the government source that posted it. Updated .