RFI_0001IES_20150822.pdf

PDF 118 KB Posted

Attached to
B1344 RENOVATIONS Solicitation # FA6675-15-R-0006
Solicitation number
FA6675-15-R-0001
Issued by

About this file

RFI 0001IES 20150822 response

View the file

Other files

File Type Posted
FA6675-15-R-0006_B1344_Solicitation_Amendment__4.pdf PDF
RFI_0006AIP_B1344_20150831.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_4_08312015.pdf PDF
1344_-_301_CATAM_-_HVAC_Installation_Plan.pdf PDF
FA6675-15-R-0006_0003_B1344_Amendment__3.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_3_08252015.pdf PDF
1344_-_301_CATAM_-_Electrical_Power_Plan.pdf PDF
RFI_0002IES_20150822.pdf PDF
RFI_0003IES_20150822.pdf PDF
RFI_0001MCI_20150817-signed.pdf PDF
RFI_0003AIP_20150812-signed.pdf PDF
RFI_0005DME_20150818.pdf PDF
RFI_0004AIP_20150812.pdf PDF
RFI_0002AIP_20150812-Signed.pdf PDF
FA6675-15-R-0006_B1344_Solicitation_Amendment_0002.pdf PDF
RFI_0003DME_20150804-signed.pdf PDF
RFI_0004DME_20150811-signed.pdf PDF
RFI_0002DME_20150804.pdf PDF
RFI_0001DME_20150804.pdf PDF
1344_-_301_CATAM_-_Plumbing_Work_Required.pdf PDF
1344_-_301_CATAM_-_Lighting_Installation_Plan.pdf PDF
1344_-_301_CATAM_-_Plumbing_DEMO_Plan.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_2-1_08032015.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev08032015.pdf PDF
B1344_Current_Exterior_Dimensions.pdf PDF
B1344_Interior_Dimensions_Post_Construction.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev06172015.pdf PDF
B1344_Existing_Concrete_Dimensions.pdf PDF
B1344_Electrical_Power_Plan.pdf PDF
B1344_Ceiling_Demo_Plan.pdf PDF
FA6675-15-R-0006_B1344_Solicitation_Amendment_0001.pdf PDF
B1344_Comm_Plan.pdf PDF
WD_TX150322_03062015_TX322.pdf PDF
B1344_HVAC_Demo_Plan_Model_2.pdf PDF
B1344_Concrete_Work_Required.pdf PDF
B1344_Flooring_Install.pdf PDF
B1344_Exterior_Dimensions_Post_Construction.pdf PDF
B1344_Ceiling_Install.pdf PDF
B1344_Lighting_Demo_Plan.pdf PDF
B1344_Rm_102_Millwork.pdf PDF
B1344_Electrical_Demo_Plan.pdf PDF
B1344_HVAC_Installation_Plan.pdf PDF
B1344_Current_Interior_Dimensions.pdf PDF
B1344_Fire_Suppression_Install.pdf PDF
B1344_Current_Fire_Suppression.pdf PDF
FA6675-15-R-0006_B1344_CATM_Solicitation.pdf PDF
RFI_-RFC_FORM_20150420.doc DOC document
B1344_HVAC_Demo_Plan_Model_1.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION / CLARIFICATION FORM

FOR CONTRACTOR USE ONLY

CONTRACT NO:

DDPM 160001

RFI NO: IES-01 DATE (YYYYMMDD)

2015/08/22

SUBJECT:

Electrical Conduit

DRAWING REFERENCE/ DETAIL:

SOW 2.6.12

ATTACHMENT SENT UNDER SEPARATE

COVER(__)

RESPONSE NEEDED BY:ASAP

REQUEST:

As per SOW section 2.6.12 all electrical wiring and Rigid Conduit is to be demolished.

This statement does not address the majority of the existing conduit which has an industry classification of non-rigid.

PROPOSED SOLUTION (If applicable):

Provide clarification of SOW 2.6.12 to make clear whether the interior electrical metallic tubing (EMT) or other non-rigid conduit remains for reuse.

TO(Contracting Officer): 301 CONF/LGC

FROM (Contractor):

Izoro Electrical Systems inc.

DATE (YYYYMMDD)

2015/08/22

TYPE OR PRINT NAME AND TITLE

Samuel Blakley/General Manager

SIGNATURE:

FOR GOVERNMENT USE ONLY

FROM CONTRACTING TO:

BCE: Charles Tehan (__); Robert Dudley(__; OR OTHER(__)

For Evaluation and Action

DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:

RFI RESPONSE / CLARIFICATION (refer to page 2)

RFI RESPONSE / CLARIFICATION:-

1101986434C Stamp

REQUEST FOR INFORMATION / CLARIFICATION FORM

Government to complete following sections:

TO: AF Contracting Office From Responding Agency

TO:(Contractor from Contracting Officer

CONTRACTOR REVIEW

After reviewing the Government response, does the contractor anticipate A change order will be required? YES NO There will be an increase in the cost of the project? YES NO

Reviewer:

*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proposal), they will be notified by the contracting office.

1101986434C Typewritten Text

1101986434C Typewritten Text

1. Paragraph 2.6., Line Item 2.6.12. refers to all electrical wiring, rigid conduit, and EMT non-rigid conduit. In other words, all electrical will be removed from the facility during the demolition phase.

1101986434C Typewritten Text 20150824

1101986434C Typewritten Text Charles D. Tehan, GS-11, USAFR Engineering Technician, 301 MSG/BCE

1101986434C Typewritten Text

1101986434C Typewritten Text

1101986434C Typewritten Text

1101986434C Typewritten Text

1101986434C Typewritten Text

1376454971C Typewritten Text 20150824

1376454971C Typewritten Text Yvette Todtenhoefer, Contracting Officer

2015-08-24T08:08:19-0500
TEHAN.CHARLES.D.1101986434
2015-08-24T08:42:48-0500
TODTENHOEFER.YVETTE.1376454971

File details come from the government source that posted it. Updated .