REQUEST FOR INFORMATION / CLARIFICATION FORM
FOR CONTRACTOR USE ONLY
CONTRACT NO: RFI NO:
MCI.001
DATE (YYYYMMDD)
20150817
SUBJECT:
SOLICITAION FA6675-15-R-0006
DRAWING REFERENCE/ DETAIL:
SOW 3.10.5
ATTACHMENT SENT UNDER SEPARATE
COVER(__)
RESPONSE NEEDED BY:
REQUEST:
PLEASE SPECIFY THE TYPE OF FIBER THAT IS TO BE USED PER 3.10.5 OF THE SOW.
ALSO, PLEASE SPECIFY THE LINEAR FOOTAGE OF NEW CONDUIT NECESSARY TO RUN FIBER IF
AND WHEN THE EXISTING CONDUIT WERE TO GET FULL.
PROPOSED SOLUTION (If applicable:
TO(Contracting Officer): 301 CONF/LGC FROM (Contractor): MCI
DATE (YYYYMMDD)
20150817
TYPE OR PRINT NAME AND TITLE
FRANK SAENZ, PRESIDENT
SIGNATURE:
FOR GOVERNMENT USE ONLY
FROM CONTRACTING
TO:(Base Civil Engineering): Charles Tehan (_X_) Robert Dudley(__)
For Evaluation and Action
DATE (YYYYMMDD)
20150819
TYPE OR PRINT NAME AND TITLE
Ron Pyles, Contract Admin
SIGNATURE:
RFI RESPONSE / CLARIFICATION (refer to page 2)
PYLES.RONALD.GE
NE.1191522202
Digitally signed by
PYLES.RONALD.GENE.1191522202
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=PYLES.RONALD.GENE.1191522202 Date: 2015.08.19 07:23:57 -05'00'
REQUEST FOR INFORMATION / CLARIFICATION FORM
RFI RESPONSE / CLARIFICATION:-
Government to complete following sections:
TO:(AF Contracting Office)
DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:
TO:(Contractor)
DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:
CONTRACTOR REVIEW
After reviewing the Government response, does the contractor anticipate A change order will be required? YES NO There will be an increase in the cost of the project? YES NO
Reviewer:
DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:
*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proporsal), they will be notified by the contracting office.
1. The fiber shall be 12 strands of single mode OSP fiber.
2. The linear footage (LF) of fiber will be approximately 1,800 LF and the conduit run will be approximately 750 LF of 4" schedule 40 PVC conduit with 3 cell MaxCell innerduct and possibly one new hand hole to match the existing hand holes on the installation (30"W x 48"L x 36"D).
20150821 Charles D. Tehan, GS-11, Engineering Tech TEHAN.CHARLES.D.
1101986434
Digitally signed by
TEHAN.CHARLES.D.1101986434
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=TEHAN.CHARLES.D.1101986434 Date: 2015.08.21 10:32:08 -05'00'
20150821 Yvette Todtenhoefer, Contracting Officer Yvette Todtenhoefer