RFI_0001MCI_20150817-signed.pdf

PDF 155 KB Posted

Attached to
B1344 RENOVATIONS Solicitation # FA6675-15-R-0006
Solicitation number
FA6675-15-R-0001
Issued by

About this file

RFI 0001MCI 20150817 response

View the file

Other files

File Type Posted
FA6675-15-R-0006_B1344_Solicitation_Amendment__4.pdf PDF
RFI_0006AIP_B1344_20150831.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_4_08312015.pdf PDF
1344_-_301_CATAM_-_HVAC_Installation_Plan.pdf PDF
FA6675-15-R-0006_0003_B1344_Amendment__3.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_3_08252015.pdf PDF
1344_-_301_CATAM_-_Electrical_Power_Plan.pdf PDF
RFI_0002IES_20150822.pdf PDF
RFI_0003IES_20150822.pdf PDF
RFI_0001IES_20150822.pdf PDF
RFI_0003AIP_20150812-signed.pdf PDF
RFI_0005DME_20150818.pdf PDF
RFI_0004AIP_20150812.pdf PDF
RFI_0002AIP_20150812-Signed.pdf PDF
FA6675-15-R-0006_B1344_Solicitation_Amendment_0002.pdf PDF
RFI_0003DME_20150804-signed.pdf PDF
RFI_0004DME_20150811-signed.pdf PDF
RFI_0002DME_20150804.pdf PDF
RFI_0001DME_20150804.pdf PDF
1344_-_301_CATAM_-_Plumbing_Work_Required.pdf PDF
1344_-_301_CATAM_-_Lighting_Installation_Plan.pdf PDF
1344_-_301_CATAM_-_Plumbing_DEMO_Plan.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev_2-1_08032015.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev08032015.pdf PDF
B1344_Current_Exterior_Dimensions.pdf PDF
B1344_Interior_Dimensions_Post_Construction.pdf PDF
FA6675-15-R-0006_B1344_CATM_Renovations_SOW_03302015_Rev06172015.pdf PDF
B1344_Existing_Concrete_Dimensions.pdf PDF
B1344_Electrical_Power_Plan.pdf PDF
B1344_Ceiling_Demo_Plan.pdf PDF
FA6675-15-R-0006_B1344_Solicitation_Amendment_0001.pdf PDF
B1344_Comm_Plan.pdf PDF
WD_TX150322_03062015_TX322.pdf PDF
B1344_HVAC_Demo_Plan_Model_2.pdf PDF
B1344_Concrete_Work_Required.pdf PDF
B1344_Flooring_Install.pdf PDF
B1344_Exterior_Dimensions_Post_Construction.pdf PDF
B1344_Ceiling_Install.pdf PDF
B1344_Lighting_Demo_Plan.pdf PDF
B1344_Rm_102_Millwork.pdf PDF
B1344_Electrical_Demo_Plan.pdf PDF
B1344_HVAC_Installation_Plan.pdf PDF
B1344_Current_Interior_Dimensions.pdf PDF
B1344_Fire_Suppression_Install.pdf PDF
B1344_Current_Fire_Suppression.pdf PDF
FA6675-15-R-0006_B1344_CATM_Solicitation.pdf PDF
RFI_-RFC_FORM_20150420.doc DOC document
B1344_HVAC_Demo_Plan_Model_1.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION / CLARIFICATION FORM

FOR CONTRACTOR USE ONLY

CONTRACT NO: RFI NO:

MCI.001

DATE (YYYYMMDD)

20150817

SUBJECT:

SOLICITAION FA6675-15-R-0006

DRAWING REFERENCE/ DETAIL:

SOW 3.10.5

ATTACHMENT SENT UNDER SEPARATE

COVER(__)

RESPONSE NEEDED BY:

REQUEST:

PLEASE SPECIFY THE TYPE OF FIBER THAT IS TO BE USED PER 3.10.5 OF THE SOW.

ALSO, PLEASE SPECIFY THE LINEAR FOOTAGE OF NEW CONDUIT NECESSARY TO RUN FIBER IF

AND WHEN THE EXISTING CONDUIT WERE TO GET FULL.

PROPOSED SOLUTION (If applicable:

TO(Contracting Officer): 301 CONF/LGC FROM (Contractor): MCI

DATE (YYYYMMDD)

20150817

TYPE OR PRINT NAME AND TITLE

FRANK SAENZ, PRESIDENT

SIGNATURE:

FOR GOVERNMENT USE ONLY

FROM CONTRACTING

TO:(Base Civil Engineering): Charles Tehan (_X_) Robert Dudley(__)

For Evaluation and Action

DATE (YYYYMMDD)

20150819

TYPE OR PRINT NAME AND TITLE

Ron Pyles, Contract Admin

SIGNATURE:

RFI RESPONSE / CLARIFICATION (refer to page 2)

PYLES.RONALD.GE

NE.1191522202

Digitally signed by

PYLES.RONALD.GENE.1191522202

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=PYLES.RONALD.GENE.1191522202 Date: 2015.08.19 07:23:57 -05'00'

REQUEST FOR INFORMATION / CLARIFICATION FORM

RFI RESPONSE / CLARIFICATION:-

Government to complete following sections:

TO:(AF Contracting Office)

DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:

TO:(Contractor)

DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:

CONTRACTOR REVIEW

After reviewing the Government response, does the contractor anticipate A change order will be required? YES NO There will be an increase in the cost of the project? YES NO

Reviewer:

DATE (YYYYMMDD) TYPE OR PRINT NAME AND TITLE SIGNATURE:

*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proporsal), they will be notified by the contracting office.

1. The fiber shall be 12 strands of single mode OSP fiber.

2. The linear footage (LF) of fiber will be approximately 1,800 LF and the conduit run will be approximately 750 LF of 4" schedule 40 PVC conduit with 3 cell MaxCell innerduct and possibly one new hand hole to match the existing hand holes on the installation (30"W x 48"L x 36"D).

20150821 Charles D. Tehan, GS-11, Engineering Tech TEHAN.CHARLES.D.

1101986434

Digitally signed by

TEHAN.CHARLES.D.1101986434

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=TEHAN.CHARLES.D.1101986434 Date: 2015.08.21 10:32:08 -05'00'

20150821 Yvette Todtenhoefer, Contracting Officer Yvette Todtenhoefer