Schedule of Material Submittals.xls
XLS spreadsheet 44 KB Posted
- Attached to
- B3341 Building Renovations
- Solicitation number
- FA6675-12-R-0011
About this file
SCHEDULE OF MATERIAL SUBMITTALS TO BE USED IN CONJUCTION WITH SF3000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amended solicitation 3.doc | DOC document | |
| B3341-renovation-layout.pdf | ||
| AMX B 3341 RFI-with Comments.doc | DOC document | |
| amended solicitation 2.doc | DOC document | |
| B3341-SOW revised 9-4-12.doc | DOC document | |
| amended solicitation.doc | DOC document | |
| SITE VISIT.doc | DOC document | |
| SF1442.doc | DOC document | |
| WAGE DETERMINATION.doc | DOC document | |
| PAST PERFORMANCE.doc | DOC document | |
| FINANCIAL RESPONSIBILITY.doc | DOC document | |
| SOW .doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||||||||||
| PROJECT ENGINEER | PROJECT NUMBER | PROJECT TITLE | SOLICTATION/CONTRACT NO. | ||||||||||||||||||||
| JOSEPH GREENAWALT | DDPM 11-0026 | Renovate/Alter 301 Services Building 3341 | |||||||||||||||||||||
| To be completed by Project Engineer | To be completed by Contract Administrator | ||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NUMBER OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENINERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | ||||||||||||
| APPROVED | DISAPPROVED | ||||||||||||||||||||||
| 1 | AS-BUILT SCHEDULE | 1 | 10d/NTP | ||||||||||||||||||||
| 2 | CERTIFICATES OF INSURANCE | 1 | 10d/NTP | ||||||||||||||||||||
| 3 | CONCRETE DESIGN | 1 | 2 | 2 | 10d/NTP | ||||||||||||||||||
| 4 | EE LIGHT FIXTURES | 3 | 1 | 2 | 2 | 2 | 2 | 10d/NTP | |||||||||||||||
| 5 | ELECTRICAL HARDWARE DEVICES | 3 | 1 | 2 | 2 | 2 | 2 | 10d/NTP | |||||||||||||||
| 6 | INSULATION | 1 | 2 | 2 | 10d/NTP | ||||||||||||||||||
| 7 | LIST OF CONTACT PERSONNEL | 1 | 10d/NTP | ||||||||||||||||||||
| 8 | MECHANICAL HARDWARE DEVICES | 3 | 1 | 2 | 2 | 2 | 2 | 10d/NTP | |||||||||||||||
| 9 | MECHANICAL VENTILATION ANALYSIS | 1 | 1 | 10d/NTP | |||||||||||||||||||
| 10 | PAINTS & STAINS | 1 | 2 | 2 | 10d/NTP | ||||||||||||||||||
| 11 | ROOFING PENETRATIONS | 3 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 10d/NTP | |||||||||||||
| 12 | SANITARY WATER AND WASTE ANALYSIS | 1 | 1 | 10d/NTP | |||||||||||||||||||
| 13 | SLAB PATCH AND REPAIR | 3 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 10d/NTP | |||||||||||||
| 14 | SUBMITTLAL REGISTER | 1 | 10d/NTP | ||||||||||||||||||||
| 15 | SURETY BOND | 1 | 10d/NTP | ||||||||||||||||||||
| 16 | DOOR PULLEY & CHAIN | 3 | 3 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 30d/NTP | ||||||||||||
| 17 | DOORS AND FRAMES | 3 | 3 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 1 | 30d/NTP | |||||||||||
| 18 | DRAWINGS 35% (CD, Autocad and PDF) | 1 | 30d/NTP | ||||||||||||||||||||
| 19 | EMERGENCY LIGHTS | 3 | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 1 | 30d/NTP | ||||||||||||
| 20 | ENGINEERING DESIGN ANALYSIS (CD, *.doc and PDF) | 1 | 1 | 1 | 30d/NTP | ||||||||||||||||||
| 21 | ENVIRONMENTAL PROTECTION PLAN | 1 | 30d/NTP | ||||||||||||||||||||
| 22 | HEALTH AND SAFETY PLAN | 1 | 30d/NTP | ||||||||||||||||||||
| 23 | LIGHT FIXTURES | 1 | 1 | 2 | 2 | 2 | 2 | 2 | 1 | 30d/NTP | |||||||||||||
| 24 | OFFICE BALLASTS | 1 | 2 | 2 | 2 | 2 | 1 | 30d/NTP | |||||||||||||||
| 25 | PAINT | 3 | 1 | 1 | 2 | 2 | 2 | 30d/NTP | |||||||||||||||
| 26 | QUALITY ASSURANCE PLAN | 1 | 30d/NTP | ||||||||||||||||||||
| 27 | VCT FLOORING | 3 | 1 | 1 | 1 | 2 | 2 | 2 | 30d/NTP | ||||||||||||||
| 28 | WORK PLAN | 3 | 1 | 30d/NTP | |||||||||||||||||||
| 29 | CONSTRUCTION SCHEDULE | 3 | 1 | 60d/NTP | |||||||||||||||||||
| 30 | DRAWINGS (CD, Autocad and PDF) AND SPECIFICATIONS 95% (CD, *.doc and PDF) | 1 | 60d/NTP | ||||||||||||||||||||
| 31 | MAINTENANCE AND PROTECTION OF TRAFFIC (MPT) PLANS | 3 | 1 | 60d/NTP | |||||||||||||||||||
| 32 | ACTIVITY HAZARD ANALYSIS | 1 | 70d/NTP | ||||||||||||||||||||
| 33 | CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT | 1 | 70d/NTP | ||||||||||||||||||||
| 34 | CONSTRUCTION DRAWINGS (CD,Autocad and PDF) AND SPECIFICATIONS (CD, *.doc and PDF) | 1 | 1 | 70d/NTP | |||||||||||||||||||
| 35 | CONTRACTOR SAFETY SELF-EVALUATION CHECKLIST | 1 | 70d/NTP | ||||||||||||||||||||
| 36 | TEMPORARY ENVIRONMENTAL CONTROLS | 1 | 70d/NTP | ||||||||||||||||||||
| 37 | AS BUILT/RECORD DRAWINGS (Full D size prints and CD,Autocad and PDF) | 1 | 1 | 250d/NTP | |||||||||||||||||||
| 38 | |||||||||||||||||||||||
| 39 | |||||||||||||||||||||||
| 40 |