PAST PERFORMANCE.doc

DOC document 46 KB Posted

Attached to
B3341 Building Renovations
Solicitation number
FA6675-12-R-0011
Issued by

About this file

COMPLETE PAST PERFORMANCE WORKSHEET AS PART OF YOUR PROPOSAL PACKAGE

View the file

Other files

File Type Posted
amended solicitation 3.doc DOC document
B3341-renovation-layout.pdf PDF
AMX B 3341 RFI-with Comments.doc DOC document
B3341-SOW revised 9-4-12.doc DOC document
amended solicitation 2.doc DOC document
amended solicitation.doc DOC document
SITE VISIT.doc DOC document
FINANCIAL RESPONSIBILITY.doc DOC document
SOW .doc DOC document
Schedule of Material Submittals.xls XLS spreadsheet
SF1442.doc DOC document
WAGE DETERMINATION.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PAST PERFORMANCE QUESTIONNAIRE – CONSTRUCTION CONTRACTS

SECTION A: CONTRACTOR INFORMATION: (To be completed by the contractor prior to mailing to reference)

a. Contractor’s name and address: ____________________________

b. Point of Contact: ____________________________

c. Phone #: _______________________

d. Contract #: _____________________

Contract Type: _______________________

e. Project Title: ____________________________________________________________

f. Performance Period: ______________________

g. Authorization is hereby given to provide the information in SECTION B of this questionnaire.

(Signature of authorized contractor representative.)

(Date)

(Printed name and title of authorized contractor representative.)

SECTION B: PERFORMANCE INFORMATION: (To be completed by the Present/Past Evaluation Respondents)

a. Respondent’s name and address: ____________________________

b. Respondent’s Point of Contact: ________________________

c. Phone #: ___________________________

d. Contract #: _____________________

Contract Type: _______________________

e. Award Amount: _________________

Final Amount: _________________

f. Performance Period: ______________________ Date of Completion (If applicable): ____________

g. Authorization is hereby given to provide the information in SECTION B of this questionnaire.

Please mail, fax, or email the completed questionnaire to:

301CONF/LGC

Attn: Thomas Peterson

1710 Burke Ave

NAS JRB Ft Worth, TX 76127-1054

Phone: 817-782-7655

FAX: 817-782-5371

Email: gene.peterson.3@us.af.mil PERFORMANCE INFORMATION: Choose the appropriate letter on the scale (E, G, S, M, U, and N) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF M or U.

E
G
S
M
U
N
Exceptional
Good
Satisfactory
Marginal
Unsatisfactory
Neutral

Performance meets contractual requirements with many exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.

Performance meets contractual requirements with some exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than some minor problems for which corrective actions taken by the contractor were effective.

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Performance was not observed or not applicable to the current effort being reported against.

Please provide explanatory comments for any area/factor/subfactor rated less than satisfactory.

1. QUALITY CONTROL: RATING

a. Quality of Workmanship

b. Proper provision, use and storage of materials

c. Adequacy of submittals

d. Adequacy of as-built drawings

e. Identification/correction of deficient work in a timely manner

f. Initiative to suggest and implement solutions

2. TIMELY PERFORMANCE

a. Provided submittals in a timely manner

b. Submittals were well researched and clearly identified the proposed item

c. Submittals accurately matched contract requirements

d. Developed realistic progress schedules

e. Complied with established/approved progress schedules

f. Submission of updated and revised progress schedules

g. Resolution of performance delays

h. Completion of work, including punchlist items within performance period

3. MANAGEMENT EFFECTIVENESS

1. Provided experienced project managers/supervisors with the technical and administrative abilities needed to ensure compliance with contract requirements and safety regulations.

2. Site Manager/Superintendent had sufficient authority to make decisions or take action during project performance. Superintendent was consistently present on site while work was being performed and acted promptly to resolve probems and ensure work quality.

3. Subcontracted with experienced, knowledgable subcontractors

4. Paid subcontractors/supliers in a timely manner.

5. Effectively managed subcontractors.

6. Provided accurate, complete, reasonable, well-substantiated pricing data for modifications (not over inflated or under estimated).

7. Received timely and satisfactory responses to warranty issues after project completion.

8. Cooperated to resolve problems, attended meetings as scheduled and maintained communication to assure satsifactory resolution.

9. Provided proposals that accurately represented the work required.

10. Completed all contract work prior to requesting final inspection. Left no major discrepancies.

11. Completed all contract requirements, including final site cleanup, submittal of O&M

Manuals and warranties, and punchlist items by the required completion date.

12. Promptly submitted closeout documentation and final invoice after completion and acceptance of the project/contract.

4. COMPLIANCE WITH LABOR STANDARDS

a. Submitted complete and correct prime contractor payroll reports in a timely manner.

b. Ensured subcontractor payrolls were complete, correct and submitted in a timely manner.

c. Complied with labor laws and regulations, with specific attention to the Davis-Bacon Act.

5. COMPLIANCE WITH SAFETY AND OTHER STANDARDS

a. Timely prepared, submitted and implemented/enforced an adequate Safety & Health Plan

b. Timely prepared, submitted and implemented/enforced an adequate Environment Protection Plan/Sediment & Erosion Control Plan.

c. Timely prepared, submitted and implemented/enforced an adequate Waste/Recyling Plan.

d. Timely prepared, submitted and implemented/adhered to an adequate Work Plan, including work schedule.

Other Past Performance Considerations:

1. Were liquidated damages assessed? (If so, describe the frequency, circumstances, severity of problem etc.)

(Yes No)

2. Based on the contractor's overall performance, would this contractor (Yes No) be re-hired?

3. Were there any indications of financial/bonding difficulties of this (Yes No)

Contractor?

4. Did the Contractor display any unique skills or accomplishments?

(Yes No)

5. Was this Contractor issued any provessional/industry awards, letters of (Yes No)

Appreciation/commendation, etc., by your agency?

6. Did this Contractor successfully submit any value engineering change

(Yes No) proposals? If yes, what was the impact on reducing cost or schedule, increasing efficiency or improving quality?

EXPLANATION OF RATINGS AND ADDITIONAL REMARKS/COMMENTS:

(utilize additonal pages, if needed) When Filled In This Document Is Source Selection Sensitive IAW FAR 2.101 and FAR 3.104