FA667021R0002, Giant Voice system Upgrade Q&A

1. Will the Offeror be allowed to print double-sided?

a. You may print single or double sided however, each page with any print on it will be considered as part of the overall page count.

2. Will the Offeror be allowed to use 10 pt for tables and graphics?

a. No

3. Can the Government exclude the resumes from the 15-page limit?

a. No

4. In a two-company joint effort, should the Offeror submit a total of 6 contracts?

a. Yes

5. We cannot find FAR Clause 52.228-1.

a. Included via amendment 2 dated 20 April 2021

6. For Cost Proposal, please confirm that the Offeror is to submit two separate items: Bid Bond and Bonding Company Letter

a. Yes

7. Can Volume I – Technical be expanded to 30 pages

a. No

8. Due to COVID 19 current pandemic restrictions, will electronic submissions be accepted due to safety reasons

a. No

9. Is the Payment Protection separate from the bid bond indicated in Section L.F.4?

a. A bid guarantee along with payment and performance bonds are required

10. Can the Government confirm what positions are the key personnel?

a. Key personnel are identified in Section L-001 Proposal Preparation

11. Which proposal and layout and content should the Offeror follow: the one in Section L or the one in Section M?

a. Section L is identified in the solicitation as Instruction, Conditions, & Notices to Offerors or Quoters; whereas Section M is identified as Evaluation Factors for Award

12. Per requested breakdown of Volumes, this information is cost related, can this information be included in Volume III Price Proposal.

a. See amendment 3 for clarification where Subfactor 4 has been revised

13. Please confirm that the Government wants the Offeror to include cost information in the Technical Proposal.

a. See amendment 3 for clarification where Subfactor 4 has been revised

14. Per SOO 1.2 The contractor shall utilize the existing central controllers’ consoles. Will the base consider other manufacturers and replace the existing control units for system compatibility?

a. No