SOW 24 Feb 09.pdf

PDF 23 KB Posted

Attached to
Replace 15KV Cutout Switches, Basewide Federal contract opportunity
Solicitation number
FA6670-10-B-0001
Issued by
Department of the Air Force Reserve Command

About this file

Specifications RVKQ 09-0324 Scope of Work

View the file

Other files for this federal contract opportunity

Other files attached to Replace 15KV Cutout Switches, Basewide, newest first.
File Type Posted
Davis Bacon Decision NY100012 dated 9 April 2010.pdf PDF
FA6670-10-B-0001 Amendment 0001.pdf PDF
Site Visit Questions and Answers.pdf PDF
Submittal List.pdf PDF
Base Electric Map.pdf PDF
OVERHEAD TRANSMISSION AND DISTRIBUTION.pdf PDF
NY100012 dated 12 Mar 2010.pdf PDF
AF3000.pdf PDF
15kc Switch.PDF PDF
BASIC ELECTRICAL METHODS.pdf PDF
Submittal Procedures.pdf PDF
Sources For Reference Publications.pdf PDF
Table of Contents.pdf PDF
FA6670-10-B-0001.pdf PDF
APPARATUS INSPECTION AND TESTING.pdf PDF
OPERATION AND MAINTENANCE.pdf PDF
Cover Page.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RVKQ 09-0324 Replace 15kv Cutout Switches

Section 01 11 00

24 February 2009

SUMMARY OF WORK

RVKQ 09-0324

REPLACE 15 KV CUTOUT SWITCHES

BASEWIDE

DESCRIPTION OF PROPOSED REPLACEMENT:

1.) Provide all material and labor to repair and upgrade the existing utility poles and overhead distribution systems as noted below.

a. Pole 13 Needs Insulator for High Voltage Wire,

b. Pole 16 - Needs Insulator for High Voltage Wire , Need pin connector installed for water in secondary,

c. Pole 19 - Needs Insulator for High Voltage Wire

d. Pole 30 - Needs Pin Terminal, Water in Secondary

e. Pole 40 - Needs Insulator for High Voltage Wire

f. Pole 42 – Replace load break cutout ( Sectionalizers)

g. Pole 43-3 - Tighten Triplex

h. Pole 45 – Replace load break cutout ( Sectionalizers)

i. Pole 60 - Needs Insulator for High Voltage Wire, Water in Secondary

j. Pole 64 - Tighten Triplex

k. Pole 65 - Needs Pin Terminal, Water in Secondary

l. Pole 66 – Replace load break cutout ( Sectionalizers)

m. Pole 67- Replace load break cutout ( Sectionalizers)

n. Pole 68-1 – Replace Pole

o. Pole 74-1 - Water in Secondary

p. Pole 78- Replace load break cutout ( Sectionalizers)

q. Pole 99- Replace load break cutout ( Sectionalizers)

r. Pole 105- Replace load break cutout ( Sectionalizers)

s. Pole 105-4 - Replace Pole

t. Pole 105-5 - Straighten Pole/ Install guy

u. Pole 105-6 - Replace Pole

v. Pole 110 - Needs Pin Terminal, Water in Secondary

w. Pole 112 - Needs Insulator for High Voltage Wire, Needs Pin Terminal, Water in Secondary

x. Pole 123 - Resag Triplex

y. Pole 123-1 - Replace Pole

z. Pole 123-2 - Resag Triplex

aa. Pole 129 - Needs Pin Terminal, Water in Secondary

bb. Pole 132-4 - Replace Pole

cc. Pole 132-6 - Straighten Pole/ Install guy

RVKQ 09-0324 Replace 15kv Cutout Switches

dd. Pole 132-7 - Straighten Pole/ Install guy

ee. Pole 132-8 - Straighten Pole/ Install guy

ff. Pole 135 - Needs Pin Terminal, Water in Secondary

gg. Pole 136 - Needs Pin Terminal, Water in Secondary

hh. Pole 138 - Needs Pin Terminal, Water in Secondary, Replace load break cutout ( Sectionalizers)

ii. Pole 139 - Replace load break cutout ( Sectionalizers)

jj. Pole 143 – Broken tie wire

kk. Pole 143-1 - Reposition Triplex / Rubbing on Guy, Replace broken tie wire on insulator

ll. Pole 156 - Needs Pin Terminal, Water in Secondary

mm. Pole 161- Replace load break cutout ( Sectionalizers)

2.) Provide all material and labor to upgrade the existing electrical 15 KV cutouts and lighting arrestors that has metal support hardware from utilities poles base wide.

Removal of all existing cutout and lighting arrestors and metal support brackets from poles base wide. Install new wood cross arms with existing 100 ampere, open style, 15

KV cutouts and 10 KV lightening arrestors. Install proper grounding on all poles that upgraded and provide ground resistance test results for each pole that is upgraded.

a. Pole 13

b. Pole 14

c. Pole 16

d. Pole 17

e. Pole 19

f. Pole 21

g. Pole 24

h. Pole 25

i. Pole 31

j. Pole 34

k. Pole 37

l. Pole 40

m. Pole 46

n. Pole 51

o. Pole 60

p. Pole 65

q. Pole 67

r. Pole 72

s. Pole 73

t. Pole 74-1

u. Pole 80

v. Pole 97

w. Pole 99

x. Pole 104

y. Pole 110

z. Pole 111

aa. Pole 112

bb. Pole 114

cc. Pole 117

dd. Pole 121

ee. Pole 126

ff. Pole 130

gg. Pole 132

hh. Pole 135

ii. Pole 136

jj. Pole 139

kk. Pole 144 (2)

ll. Pole 146

mm. Pole 156

3.) Provide all material and labor to upgrade the existing utilities pole electrical components.

Replace fiberglass high voltage support arms with wooden cross arms, pins and insulators.

a. Pole 6

b. Pole 7

c. Pole 9

d. Pole 10

e. Pole 11

f. Pole 12

g. Pole 13

h. Pole 14

i. Pole 43

j. Pole 46

k. Pole 53

l. Pole 64

m. Pole 68

n. Pole 69

o. Pole 70

p. Pole 72

q. Pole 120

r. Pole 121

s. Pole 122

t. Pole 125

u. Pole 126

v. Pole 128

w. Pole 130

x. Pole 134

RVKQ 09-0324 Replace 15kv Cutout Switches

y. Pole 18

z. Pole 19

aa. Pole 22

bb. Pole 23

cc. Pole 26

dd. Pole 28

ee. Pole 30

ff. Pole 31

gg. Pole 33

hh. Pole 34

ii. Pole 37

jj. Pole 38

kk. Pole 39

ll. Pole 40

mm. Pole 41

nn. Pole 73

oo. Pole 74

pp. Pole 79

qq. Pole 95

rr. Pole 98

ss. Pole 101

tt. Pole 103

uu. Pole 106

vv. Pole 107

ww. Pole 108

xx. Pole 110

yy. Pole 112

zz. Pole 116 aaa. Pole 117 bbb. Pole 118 ccc. Pole 135 ddd. Pole 136 eee. Pole 137 fff. Pole 140 ggg. Pole 145 hhh. Pole 150

iii. Pole 151 jjj. Pole 154 kkk. Pole 155 lll. Pole 156 mmm. Pole 157 nnn. Pole 158 ooo. Pole 159 ppp. Pole 160

4.) Replace all 8 foot fiberglass insulator guide wire extensions with 12 foot fiberglass insulator guide wire extensions. All poles with guy wires shall have a 12 foot fiberglass insulator guide wire extensions installed.

5.) All work shall meet the National Electrical Code, current edition.

6.) All work shall be coordinated with base maintenance personnel, base civil engineering personnel and facilities personnel that will be affected.

7.) Provide four copies of any manufactures technical/support documentation to include all testing certifications and preventative maintenance for all electrical components.

8.) All electrical materials for this project will require submittals and acceptance by 914 th

Civil Engineer Section in accordance with Section 01330.

9.) On completion of the project vender shall provide as built/update of base drawing G-4

(Electrical Distribution System).