Site Visit Questions and Answers.pdf
PDF 12 KB Posted
- Attached to
- Replace 15KV Cutout Switches, Basewide Federal contract opportunity
- Solicitation number
- FA6670-10-B-0001
About this file
Site Visit Conducted 8 13 April 2010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Davis Bacon Decision NY100012 dated 9 April 2010.pdf | ||
| FA6670-10-B-0001 Amendment 0001.pdf | ||
| Submittal List.pdf | ||
| Base Electric Map.pdf | ||
| Sources For Reference Publications.pdf | ||
| Table of Contents.pdf | ||
| FA6670-10-B-0001.pdf | ||
| OVERHEAD TRANSMISSION AND DISTRIBUTION.pdf | ||
| NY100012 dated 12 Mar 2010.pdf | ||
| AF3000.pdf | ||
| 15kc Switch.PDF | ||
| BASIC ELECTRICAL METHODS.pdf | ||
| Submittal Procedures.pdf | ||
| SOW 24 Feb 09.pdf | ||
| Cover Page.pdf | ||
| APPARATUS INSPECTION AND TESTING.pdf | ||
| OPERATION AND MAINTENANCE.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace 15KV Cutout Switches Base wide, FA6670-10-B-0001
Site Visit Questions & Answers from Site Visit on 8 & 13 April 2010
19 April 2010
Q. Is the U.F.P.O. underground utility markings to be by air base personnel or by the contractor?
A. It has always been the base policy to mark communications lines on base, as part of the dig permit. The dig permit also states that it is the contractor’s responsibility to call the 1-800 You
Dig number.
Q. Is all work to be performed (including shutdowns) during normal business hours, 7:00 am –
3:30 pm?
A. It is the intention to have all work done during normal business hour. If there becomes a special need to do something after hours, we can address this for safety of the project. If agreeable to all parties an addendum would be done to make that change possible.
Q. RE: SOW item #3 – can the existing glass insulators be re-used?
A. Yes the existing glass insulators may be reused once they are inspected to be sure that they are still serviceable.
Q. RE: SOW item #2 – are the cutouts to be mounted on 1 cross arm and the arrestors to be mounted on another cross arm, so as to match the existing upgraded installations?
A. It is the base’s preference to have double cross arms as current practice has been on the base.
Q. Is all the grounding on the poles to be upgraded?
A. The base would like to have all grounding upgraded during the project.
Q. Will the new sectionalizers require arc shields like the existing ones?
A. Yes
Q. RE: SOW item #4 – are 12’ guy insulators required on all guys – primary, secondary, telcom, etc.?
A. Yes the base would like 12’ insulators required on all guys on primary and secondary poles.
Poles with other functions do not have to have guys installed.