This Request for Information (RFI) is for the 910th CONF/PK, an Air Force unit, seeking clarification on multiple technical aspects of a potential project. The document provides answers to specific questions about infrastructure and cabling requirements, including confirmation that new sleeves will be required to enter rooms, only red-colored fire notification lines will remain active, and no new drops are needed for building automation systems. Technical details include that CAT6 cable runs are under 300 feet, a 3/4" EMT conduit will only accommodate six CAT6 plenum-rated cables, and life safety drawings are not currently available. The RFI must be submitted by 10:00 AM Eastern on Friday, 5 September 2025, with inquiries directed to Joseph Perry at the 910th CONF/PK located in Vienna, Ohio.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA665625Q0010 Attachment 5 Page 1
Request for Information
INSTRUCTIONS: Please complete this form if your firm has questions concerning any aspect of the solicitation. All questions must be submitted to 910th CONF/PK by 10:00 AM Eastern on Friday, 5 September 2025. Late inquiries/questions will not be entertained.
Inquiries may be submitted to the following addresses.
Address: 910th CONF/PK Attn: Joseph Perry 3976 King Graves Rd Vienna OH 44473
E-Mail: joseph.perry.14@us.af.mil
Name & Address of Firm: _ _______
Point of Contact: _ ___________________________________________________________
E-Mail Address: ___________________________________________________________
Phone No. _____________________ Fax No._________________________
Page Question
Are life safety drawings available?
Answer: CS is not aware of life safety drawings
Are new sleeves required to get into every room? There was no evidence of existing sleeves Answer: Yes, proper sleeves into rooms will be required.
Is toning and tagging of existing voice lines feeding the demarc in room 131 required? As it was stated on the site walk that some of the voice lines need to remain active. If so, which lines (room number) are to remain?
Answer: Not required. The lines that will remain are the red colored fire notification lines, that are install throughout the building.
Are there any new drops required for building automation systems?
Answer: No
Is all work to be performed during normal hours (first shift)?
Answer: CS does not establish working hours.
Is ¾” EMT suitable for stub ups in rooms with poured concrete, unfinished walls?
Answer: A ¾” EMT will only accommodate six CAT6 plenum- rated cables.
Are there contingencies if there are over distance locations on the second floor due to everything being fed from the MDF on the first floor?
Answer: CAT6 runs are under 300 feet, over distance should not apply.