Attachment 5 - Instant Acquisition - Project Nbr ZQEL 12-0015 Repair Exterior of Building 207 Dated 11 April 2012.

Text of this file

SOW Project ZQEL 12-0015

910 SPTG/CE

Youngstown Air Reserve Station

3976 King Graves Road

Vienna OH 44473-5937

STATEMENT OF WORK

PROJECT ZQEL 12-0015

Repair Exterior of Building 207 11 April 2012

1.0. Location of Work: The site of the work is at the Youngstown Air Reserve Station, 3976 King Graves Road, Vienna Ohio (Trumbull County), Building 207.

2.0. Summary of Work: Provide a brick veneer exterior for building 207 including a layer of insulation between new brick veneer and concrete wall. Install beneath existing asphalt new drain lines into existing storm drain pipe. Tie existing downspouts from existing canopy attached to building 208 and existing downspouts on building 207 into existing storm drain with new 6”PVC drainage pipe. Modify existing roof eve flashing, fascia, and drip edge to accommodate new brick veneer capping to prevent water from going behind brick veneer.

3.0. Scope of Work: The Contractor shall furnish and install/perform all material, equipment, components, parts, tools, labor, transportation, hauling, disposal/recycling, cleaning, inspection, testing, commissioning, training, reporting, etc., necessary to perform this project as described in the contract-delivery order, including this Statement of Work and any/all applicable federal, state and local law, regulation, standards, and codes. Unless otherwise stated, any/all work items includes requirement for contractor to remove and properly dispose of/recycle off base, and to furnish and install/incorporate any/all new materials/equipment/components needed to properly complete the work item; any Government furnished property and/or reinstallation of existing materials/equipment/components shall be as stated/specified herein. Contractor shall submit materials/methods for approval prior to ordering and/or incorporation into the work; as a minimum, submittals shall include product literature, MSDS, standard color, texture and style samples/swatches/boards, and place of origin/manufacture. Demolished materials, waste/debris is property of the contractor, unless otherwise stated herein; contractor is responsible for proper disposal/recycling of such materials off base; such material shall be promptly removed from the installation and shall not be stored/stockpiled unless submitted and approved for such. Contractor is responsible for verification of all details, measurements, etc. prior to ordering materials and execution of work. The work includes, but is not limited to, the following principle elements:

3.1. Contractor shall brick veneer building 207 on all four sides of building by installing brick veneer that shall match the existing 910th base architectural design with installation of insulation between brick veneer and existing concrete vault wall in accordance with Kalin specification 07_21_00_ Thermal Insulation as applicable .

3.2. Contractor shall modify all existing wiring and lights on building 207 to accommodate installation of brick veneer installation.

3.3. Contractor shall remove and replace existing fence around building 207 for installation of new 6”PVC drainage pipe.

3.4. Contractor shall finish around existing doors with brick veneer and seal up space between brick veneer and building 207 around service and overhead door.

3.5. Contractor shall install reinforced footers for brick veneer siding.

3.6. Contractor shall modify existing roof eve flashing, fascia, and drip edge to accommodate new brick veneer capping to prevent water from going behind brick veneer.

3.7. Contractor shall tie existing downspouts on building 207 and building 208 canopy into existing storm drain after installation of new 6” PVC drainage pipe beneath existing asphalt.

3.8. Excavated depth for new 6”PVC drain lines shall allow room for minimum of 6” bedding with 12” covering of 304 aggregate and same depth and layers of asphalt as existing.

3.9. Contractor shall install 8” deep, 18” wide heavy duty trench drain with lock down heavy duty grates on location in accordance with drawing REPAIR EXTERIOR, BUILDING207, DATED: 7 JULY 11.

3.10. Any relocating or modification to Advantor alarm system shall be done by authorized installer of the existing alarm system at building 207.

4.0. References:

4.1. Specification 07 21 00 Thermal Insulation Dated: 2012

5.0. Attachments:

5.1. REPAIR EXTERIOR, CURRENT FLOOR PLAN, BUILDING 207, DATED: 7 JULY 11.

5.2. PROPOSED PROJECT SITE, DATED 7 JULY 11 PAGE 4 OF 4.

Other files for this federal contract opportunity

Other files attached to SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER), newest first.
File Type Posted
SABERamendment4.doc DOC document
Overhead door _ELEVATION_ .pdf PDF
DOOR BRICK DETAIL 14 JUN12.pptx PPTX presentation
EXISTING GUTTER DETAIL 1.pptx PPTX presentation
EXISTING GUTTER DETAIL 3.pptx PPTX presentation
EXISTING GUTTER DETAIL 2.pptx PPTX presentation
ZQEL 12-0015 REPAIR EXTERIOR BUILDING 207_13JUNE12.pdf PDF
ROOF DETAIL 1.pptx PPTX presentation
FLASHING DETAIL 14 JUN12.pptx PPTX presentation
04_20_00_UnitMasonry.doc DOC document
TECHNICAL INFORMATION SHEET FIRESTONE BUILDING PRODUCTS.pdf PDF
Q As.docx DOCX document
04_01_00_MaintenanceofMasonry.doc DOC document
Atch 5.1 Rep Ext Floor Plan B207 Dtd 7 Jul 11.pdf PDF
Existing Overhead Door.pptx PPTX presentation
ZQEL 12-0015 SOW 14 June 2012.doc DOC document
Amend3SABER.doc DOC document
WageDetSABERRev1HH.docx DOCX document
WageDetSABERRev1Bldg.docx DOCX document
SABERamendment2.doc DOC document
SiteVisitAttendees.pdf PDF
FA6656-12-R-0003-0001 Correct Site Visit Data.doc DOC document
Atch 3 - WD Building thru Mod 7.docx DOCX document
Atch 1 - Basic SABER SOW Dtd 27 Apr 12.doc DOC document
Atch 5.2 Prop Project Site Dtd 7 Jul 11 Pg 4 of 4.pdf PDF
FA6656-12-R-0003.doc DOC document
Atch 2 - WD Hvy-Hwy thru Mod 10.docx DOCX document
Atch 5.1 Rep Ext Floor Plan B207 Dtd 7 Jul 11.pdf PDF
Atch 4 PP Quest 17 Mar 12.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .