FA6643-08-R-0005 SOW dated18 April 2008.doc
DOC document 74 KB Posted
- Attached to
- Commandwide O&M Project Execution Contract (COMPEC) Federal contract opportunity
- Solicitation number
- FA664308R0005
About this file
FA6643-08-R-0005 SOW dated 18 Apr 08
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPECIAL NOTICE.doc | DOC document | |
| FA6643-08-R-0005-0002.doc | DOC document | |
| Section L Attachments L-6 L-7.xls | XLS spreadsheet | |
| Q As-FA6643-08-R-0005.doc | DOC document | |
| Section L-Transmittal Letter.doc | DOC document | |
| FA6643-08-R-0005-0001.doc | DOC document | |
| Section L Attachments L-2 L-3.doc | DOC document | |
| COMPEC CDRL 18 Apr 08.pdf | ||
| Section L Attachment L-1.doc | DOC document | |
| Section L Attachment L-4.doc | DOC document | |
| Section L Attachment L-5.doc | DOC document | |
| Section L Attachments L-2 L-3.doc | DOC document | |
| Section L Attachments L-6 L-7.xls | XLS spreadsheet | |
| FA6643-08-R-0005-Final.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation
Attachment 1
Section J
Headquarters Air Force Reserve Command
Basic Statement of Work
Commandwide O & M Project Execution Contract (COMPEC)
Prepared by: HQ AFRC, 18 April 2008
COMPEC
Basic Statement of Work
Table of Contents
Section
Title
Page
1.0.
Introduction
2.0
General Requirements
2.1
Applicable Documents
2.2
Government Furnished Items
2.3
Management, Planning, and Reporting Requirements
2.3.1 Project Management Plan
2.3.1.1 Work Breakdown Structure (WBS)
2.3.1.2 Contractor Quality Control Plan
2.3.1.3 Health and Safety Plan
2.3.1.4 Project Schedule
2.3.2 Master Document List (MDL)
2.3.3 Progress/Status Reporting
2.3.4 Meetings and Conferences
2.3.5 Points of Contact
2.4
Worksite Activities and Coordination
2.4.1 Activities Coordination
2.4.2 Notification Requirements
2.4.3 Permits
2.4.4 Environmental Protection
2.4.5 Hazardous Material and Hazardous Waste
2.4.6 Site Access
2.5
Construction Activities
2.5.1 Documentation/Daily Logs
2.5.2 Material Submittals
2.5.3 Mobilization
2.5.4 Demolition
2.5.5 Construction
2.5.6 Engineering Services During Construction
2.5.7 Pre-Final Inspection
2.5.8 Final Inspection
2.5.9 Delivery and Warranty
2.5.10 As-Built Documentation
2.5.11 De-mobilization
3.0
COMPEC Delivery Methods
3.1
Turn-Key
3.2
Design-Build
3.2.1 Working Drawings, Construction, Delivery, and Warranty 3.3
Concept/Implementation Work Plan (CWP/IWP) Construction 14
3.3.1 CWP/IWP Format and Delivery
3.3.2 CWP/IWP Construction Requirements
3.4
Tradition Construction: Design-Bid-Build
1.0
INTRODUCTION
This Statement of Work (SOW) sets forth basic requirements for construction and engineering activities supporting the Sustainment, Restoration, and Modernization (S/R&M) of real property. Projects will be located at various AFRC locations. Prior to issuing any work under this SOW, the Government will develop a concept definition (CD) of the requirement either through Government in-house resources or through private consultant. The CD will clearly define the project requirements in terms of performance, appearance, criteria, and/or specification with sufficient detail that permits a contractor to provide a proposal with reasonable performance, cost, and schedule risk.
This SOW is organized and developed to provide maximum flexibility in the use of this contract vehicle. Basic requirements described here are further refined through the use of individual project Task Orders (TO). Task Orders will be issued for projects at various stages of development. General performance requirements for construction activities are described in Section 2.0 of this SOW. Depending on the project development stage and level of design required, TOs will be issued for Turnkey, Design-Build (DB), or Traditional Construction as determined by the Contracting Officer in consultation with the Program Manager and base civil engineer. Each method is separately described in Section 3.0 of this SOW.
In addition to the variety of delivery types, TOs will be issued for a wide variety of S/R&M requirements. Examples include facility renovations including all sub-systems (mechanical, electrical, plumbing, fire detection/suppression, structural, architectural, etc) and infrastructure repair and construction (utilities, pavements, POL, etc). The contractor's team shall be prepared to support any sustainment (maintain), restoration (repair), and modernization (construct) of facilities and infrastructure.
The Contractor shall function as an integral team member in support of the AFRC mission, to include sharing information with other AFRC contractors and cooperation with communities and other Government entities.
2.0
GENERAL REQUIREMENTS
This section sets forth the general construction requirements for the COMPEC contractor.
2.1
APPLICABLE DOCUMENTS
The Contractor shall identify and comply with all applicable federal, state, and local statutes; Air Force/Military instructions, manuals, handbooks, regulations, guidance, and policy letters; Executive Orders (EOs); American Petroleum Institute (API) Codes; National Association of Corrosions Engineers (NACE); National Fire Protection (NFPA); Steel Structures and Painting Counsel (SSPC); National Electrical Code (NEC); Unified Facilities Criteria (UFC); and International Building Code (IBC), including changes and amendments in effect on the date of issuance of each TO. It is the Contractor's responsibility to identify and comply with applicable requirements. In the event of conflicting criteria, the contractor shall notify the contracting officer for guidance. Additional customer specific documents may be specified in each TO.
2.2
GOVERNMENT FURNISHED ITEMS
Any Government Furnished Equipment, Information, or Property (GFE, GFI, GFP) will be specified in each TO.
2.3
MANAGEMENT, PLANNING, AND REPORTING REQUIREMENTS
The Contractor shall implement a full range of construction and engineering activities as specified in each TO and in accordance with applicable compliance documents. The Contractor shall supply labor, equipment, and materials necessary to accomplish the work assigned unless otherwise specified in each TO. The Contractor shall perform management, planning, and performance reporting to effectively secure and monitor prime and sub-contract work.
2.3.1 Project Management Plan (A012)
The Contractor shall prepare and submit for approval a Project Management Plan (PMP) for each TO within 14 calendar days of issuance of Notice to Proceed. The PMP shall include the following (may further described below in this section) unless otherwise specified in TO:
- Work Breakdown Structure
- A project organization chart that depicts project team members (Government and contractor), contact information, and their responsibilities.
- Team communication plan (contractor format accepted)
- Contractor Quality Control plan
- Health and Safety Plan
- Narrative description of all task activities and assumptions (organized by WBS)
- Project Schedule
2.3.1.1 Work Breakdown Structure (WBS) (A001)
The Contractor shall provide a WBS in the Constructions Specifications Institute (CSI) master format for each TO. The WBS shall be used for project planning and to report the cost and schedule status, if applicable, for each TO. All required tasks shall be included in the WBS.
2.3.1.2 Contractor Quality Control (CQC) Plan (A002)
The contractor shall provide a CQC plan for each TO. The plan shall identify personnel, procedures, control, instructions, tests, and records that the contractor shall use for quality control purposes during the execution of each TO. The content of the plan shall contain:
- The project organization chart illustrating lines of authority and supervision
- Control, verification, and acceptance testing procedures for each test performed
- Procedures for tracking design and construction deficiencies
- Documentation that the CQC staff has complete authority and responsibility to take actions necessary for contract compliance
- Procedures for contract submittal distribution, processing, and tracking
- Procedures to maintain a CQC presence on site at all times during construction activities unless otherwise directed in the TO
2.3.1.3 Health and Safety Plan (A003)
The contractor shall provide a Project Health and Safety Plan for each TO. The Project Health and safety plan shall be kept on site at the construction management location at all times. All personnel (Contractor personnel, subcontractor personnel, government, and visitors) entering the construction site will be briefed on the health and safety plan and will be required to sign an endorsement of strict adherence to the plan. The US Army Corps of Engineers (USACE) Safety and Health Requirements Manual, EM 385-1-1 sets forth the specific requirements for the contractor's safety program. The Health and Safety Plan shall cover the following topics:
- Background (Site location and history and planned activities)
- Safety Program Organization (identification of safety program members, roles and responsibilities, contact (normal and emergency) information)
- Site Map (site delineation, points of entrance and egress, staging areas, alarms and emergency equipment, site evacuation map, and communication devices)
- Site Hazards (personal safety and environmental)
- Site Worker Training Requirements - Personnel Protection Equipment (PPE) Requirements - Medical Surveillance
- Monitoring (frequency, equipment and calibration, action levels) - Site Control Areas (requiring PPE, confined spaces, etc.)
- Emergency Response Actions
2.3.1.4 Project Schedule (A004)
The Contractor shall provide a project schedule for each TO. The project schedule shall show all task requirements and shall follow the project WBS. The project schedule shall be developed as time-phase Gantt charts using MS Project (latest version) unless otherwise specified in the TO. The project schedule shall show deliverable milestones and shall be used for tracking work progress towards achieving milestones. Updates to the project Schedule shall be made as required throughout the project period of performance. Schedule updates showing activity extending beyond the period of performance are not an extension of the period of performance. Period of performance extensions will only be granted through TO modifications issued by the CO. AF Form 3064 or equivalent will be used to develop the progress schedule.
2.3.2 Master Document List (MDL) (A005)
The Contractor shall create and maintain a MDL for each TO that includes all documents, whether the documents are a deliverable or not, which are prepared during the course of the TO. The MDL will also contain the PMP, material and data submittal register, contract progress/status reports, and daily construction log documentation. The MDL and its documents shall be maintained in libraries readily available for submittal to the Government.
2.3.3 Progress/Status Reporting (A006)
The contractor shall provide monthly Progress Reports of each TO. Report frequency can be modified in the TO. Progress Reports will be submitted NLT the 15th calendar day of the following month and shall contain information about contract, contract performance, schedule, deliverables, and cost. The Progress Report shall also describe progress of activities necessary to achieve the project objectives and shall contain a description of activities accomplished during the month, activities forecasted for the future months, and problems and issues associated with the performance of the statement of work. The AF Form 3065 or approved equivalent shall be used.
For cost-plus type TOs, the contractor shall provide a Funds and Man-hour Expenditure Report (FMER) (A007). The Contractor shall implement and maintain a cost accounting system and prepare a FMER to correlate the status of expensed funds and man-hours against the progress of the work completed and the negotiated budget. The FMER and associated graphics shall detail the current project status and identify funds and man-hours required to complete the assigned tasks.
Quarterly reports shall be required detailing small business participation (A018). These reports will be reviewed as part of the Fair Opportunity selection criteria for follow on task orders. Include information on the extent and type of small business concern subcontracting, the variety of small business subcontractors, and the complexity of work performed by the small business subcontractor. All information shall be archived in an electronic format compatible with AFRC information systems (currently Microsoft Office Professional products).
2.3.4 Meetings and Conferences (A007)
The Contractor shall perform a site visit and/or attend a preproposal conference. Additional requirements may be specified in each TO. The Contractor also shall attend and/or support meetings and teleconferences to discuss technical requirements, issues and project progress and status. The Contractor shall prepare, and submit for review, presentation materials for meetings, and an agenda. The Contractor shall prepare minutes for all meetings attended.
2.3.5 Points of Contact
POCs for management, planning, and reporting will be specified for each TO.
2.4 WORKSITE ACTIVITIES AND COORDINATION
2.4.1 Activities Coordination
The Contractor shall coordinate worksite activities with applicable personnel to ensure the protection of human health and the environment; the prevention of damage to property, utilities, materials, supplies, and equipment; and the avoidance of work interruptions. The Contractor shall provide physical security to work areas with security equipment and personnel. The Contractor must comply with Occupational Safety and Health Administration (OSHA) safety and health regulations and local safety office requirements. The Contractor is required to provide the COR copies of OSHA report(s) submitted during the duration of the TO. For areas not covered by OSHA, the contractor shall comply with the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1
2.4.2 Notification Requirements
The Contractor is required to notify the Contracting Officer (CO) and COR of critical issues that may affect the contract performance and/or human health and the environment. For critical issues pertaining to human health and the environment, the Contractor shall immediately notify the CO and stop work. Work shall only resume at the direction of the CO following resolution of the issue.
2.4.3 Permits
The Contractor shall develop, coordinate, and assist the installation in applying for and obtaining federal, state, local, and other applicable permits, access (including off-base easements and leases), agreements, licenses, and certificates required to perform and complete each TO. The contractor shall also process an AF Form 103, Work Clearance Request, through the local base civil engineer office. The Contractor shall maintain a library of these documents at the Contractor's site office on base as well as the corporate facility handling each TO. The Contractor shall comply with applicable permit conditions.
2.4.4 Environmental protection
Activities shall be planned and implemented in a manner that protects existing site utilities, structures, surface features, service operations, and the general site environment. This includes the protection of trees, shrubs, and other vegetation not in the affected zone from dust damage, soil compaction, and physical contact with machines and equipment. If appropriate, the Contractor shall conserve uncontaminated topsoil by removal, storage, or redistribution. All reasonable measures shall be taken to minimize and suppress fugitive emissions of dust, vapors, and other site materials during site work. All fill materials shall be non-contaminated. The Contractor shall conduct operations and activities with the intent of reducing the amount of pollution generated. Specific areas to be focused on are generation of solid waste, use of hazardous materials, use of ozone depleting chemicals, generation of hazardous waste, and use of energy and water. The Contractor shall plan, construct, operate, maintain, optimize, and commission systems necessary to control storm water run-on and run-off; and transport surface water drainage to a treatment plant, discharge location, or other destination. The TO may also include incidental environmental support to construction projects such as hazardous materials abatement and soil remediation.
2.4.5 Hazardous Material and Hazardous Waste
The Contractor shall handle hazardous materials and waste in accordance with applicable federal, state, and local requirements. The Contractor shall provide hazardous materials use and hazardous waste disposal documentation to the installation POC, and shall register with the Hazardous Materials Pharmacy program (if available) at the installation to ensure appropriate and efficient tracking of the Contractor's hazardous material purchases, inventories, use, and releases such as required by the Emergency Planning and Community Right-to-Know Act (EPCRA), EOs, or installation reporting requirements.
The Contractor shall also comply with federal, state, and local requirements for tasks involving the transportation of hazardous wastes and/or contaminated materials to off-site treatment, storage, and/or disposal facilities. This includes 40 CFR 260, 49 CFR 172, 173, 178, 179 and other applicable local, state, and federal transportation regulations.
2.4.6 Site Access
The Contractor shall obtain and monitor assigned security badges and/or identification (used by both prime contractor and subcontractor staff) used during the duration of this contract. All security badges or passes shall be returned to the base POC upon expiration of the badge, upon completion of the project, or when possession of the badge is no longer necessary (e.g., upon removal of contracted personnel from specific projects).
2.5 CONSTRUCTION ACTIVITIES
Upon approval of the CO, the Contractor may commence on-site construction activities. The Contractor shall provide the manpower, equipment, material, services, and transportation necessary to review, plan, develop and implement quality control and construction management services during the construction phase of each TO. Details regarding construction management requirements, inspection and testing, construction facilities and temporary controls, environmental protection, quality control system, construction quality control, and project closeout will be provided in each TO.
2.5.1 Documentation/Daily Logs (A008)
The Contractor shall maintain daily logbooks documenting the activity each day during construction for each TO. The logbook shall document people entering and leaving the construction site, discussions held, issues identified, actions needed, resolutions reached, and other pertinent information. The logbooks shall be kept on-site at all times. The AF Form 1477 or approved equivalent shall be used for all logbooks. Copies of the logbooks will be turned over to the Government at the conclusion of the project.
2.5.2 Material and Data Submittals (A009)
The Contractor shall develop and maintain a master list of material and data submittal requirements and status for each TO. The SAF/AQCP Schedule of Material Submittals or approved equivalent shall be used. Any specific material submittals requested will be defined in the TO. The status should include current status (approved, reviewing, rejected), dates of action (open, closed, and projected), and responsible party for the action for each submittal. The material submittal master list shall be kept on site during construction. All Material Submittals shall be accomplished in accordance with the instructions pertaining to AF Form 3000, Material Approval Submittal.
2.5.3 Mobilization
The Contractor shall perform mobilization activities as necessary to prepare the construction site for construction activities. The Contractor shall evaluate existing utilities to determine adequacy and need for modifications to support site construction activities. The Contractor shall establish a construction management location via either temporary trailers or space allocated by the Base. The Contractor shall obtain appropriate approvals and shall construct connections or new systems for electrical power, water, sewer, gas distribution, telephone, and other utilities, as required, to accomplish the activities specified in each TO. The Contractor shall also erect or install support buildings, equipment enclosures, and storage facilities for construction materials and waste materials awaiting disposal.
2.5.4 Demolition
The Contractor shall demolish facilities, systems, and other improvements as required in each TO. Demolition activities can be incidental to other requirements or a stand-alone project. The Contractor shall conduct demolition efforts in conjunction with such activities as new construction or renovation, removal of outdated facilities, and site clearing from natural disasters. Prior to demolition activities, the contractor may be required to survey the facility for hazardous materials (lead, asbestos, contaminated soil, etc) and abate and dispose of hazardous materials in accordance with the criteria listed in Paragraph 2.1.
2.5.5 Construction
Upon issuance of the Notice To Proceed (NTP) by the CO, the Contractor may commence on-site construction activities. The contractor shall provide the manpower, equipment, material, services, and transportation necessary to review, plan, develop, and implement quality control and oversight services during the construction phase of the TO. The Contractor shall perform construction, restoration, emergency response, repair, enhancement, maintenance, modernization, and demolition of facilities, utilities, real property systems, and infrastructure systems in support of construction and engineering requirements as specified in each TO. Shop drawings and other submittals that require approval shall be signed/approved by the COR prior to actual work placement of submitted elements. Typical activities can consist of stand-alone projects, and construction in support of other projects. Construction activities will be in conformance with local and Air Force standards and regulations.
2.5.6 Engineering Services During Construction
The task order may require the Contractor to provide engineering related services during construction to review submittals, coordinate technical requirements, provide conflict resolution, and to review and approve field changes. Additional engineering services during construction may be specified in the TO.
2.5.7 Pre-Final Inspection
The Contractor shall conduct a pre-final walk through inspection and publish the pre-final inspection findings in a pre-final inspection report in accordance with the format specified at the pre-construction conference and defined in the TO. Additional pre-final inspection services and/or requirements may be specified in the TO.
2.5.8 Final Inspection
The Contractor shall conduct a final inspection and publish the findings in a final inspection report in accordance with the format specified at the pre-construction conference and defined in the TO. The inspection shall concentrate on the items identified at the pre-final inspection and recorded in the pre-final report. The final inspection report shall certify that all items of the design have been implemented, that the construction is complete. At the final inspection, the Contractor shall present a completed DD Form 1354, Transfer, and Acceptance of Real Property to the Base Civil Engineer (BCE) or other appropriate organization for signature and acceptance. Additional final inspection services and/or requirements will be specified in the TO.
2.5.9 Delivery and Warranty
This item is covered in general contract clauses. Additional services and/or requirements will be specified in the TO.
2.5.10 As-Built Documentation (A010)
The contractor shall maintain, prepare, and deliver final as-built documentation for each TO. As-built documentation shall include a record of "signed and sealed" as-built drawings and specifications verifying that all development standards have been met. Delivery of as-built documentation shall occur prior to final payment. Additional requirements may be specified in the TO.
2.5.11 De-mobilization
The Contractor shall remove temporary facilities and implement erosion control measures such as seeding, mulch, sodding, and erosion control fabrics; restore roads, structures and utilities; and plant trees, shrubbery, gasses and other vegetation. The Contractor shall document and report on activities and train Government personnel to perform required maintenance, as specified in each TO.
3.0 COMPEC DELIVERY METHODS
This section describes the various delivery methods AFRC may use for supporting S/R&M requirements. Each TO will use this section to specify which method the COMPEC Contractor shall use as described in Section 1.0. The Contractor shall perform a full range of activities to meet all customer's engineering and construction requirements as described in the TO. Requirements may include design, construction, demolition, repair, and emergency response activities.
3.1 TURN-KEY
Under Turn-key delivery, the COMPEC contractor will be responsible for the design and construction of the facility using provided performance specifications. In addition, the contractor will manage and coordinate all activities associated with delivery of the project. Typical activities may include providing swing space facilities, arranging to re-locate occupants as needed, and furnishing and equipping the facility. The COMPEC contractor will serve as both the Architect of Record and the Contractor of Record.
3.2 DESIGN-BUILD (D-B)
Under Design-Build delivery, the COMPEC Contractor will be responsible for the design and construction of a public building, facility, or work. The contractor shall manage and perform D-B construction work as defined in the TO. The following are typical D-B construction TO requirements: completion of working drawings, permitting, construction, construction management, scheduling, inspection and testing, maintaining construction facilities and temporary controls, environmental protection, quality control, construction quality control, and project closeout. The COMPEC contractor will serve as both the Architect of Record and the Contractor of Record. Specific requirements will be provided at the TO level.
3.2.1 Working Drawings, Construction, Delivery, and Warranty (A011) The COMPEC Contractor shall be responsible for the design completion, construction, and the delivery and warranting of the project/facility. Prior to beginning onsite construction, the COMPEC Contractor, as directed in the RFP, will initiate the Construction Phase by completing project working drawings and the various plans and schedules, including a construction schedule using Program Evaluation and Review Technique (PERT), Critical Path Method (CPM), or equivalent scheduling tools, and obtaining submittal approvals and permits. Working drawings and specifications shall comply with codes, laws, the RFP, and the TO. The working drawings shall be submitted for review as directed in the TO statement of work. The COMPEC contractor shall be responsible for implementation, coordination, and execution of all regulatory reviews, ensure technical adequacy of the final design, and provide quality control of all phases of the TO. Further details regarding design requirements will be provided at the TO level.
3.3 Concept/Implementation Work Plan (CWP/IWP) Construction
Under CWP/IWP delivery, the COMPEC Contractor will be responsible for the incidental design and construction of a public building, facility, or work. The contractor shall manage and perform construction work as defined in the TO. The following are typical requirements: completion of working/shop drawings (A015), permitting, construction, construction management, scheduling, inspection and testing, maintaining construction facilities and temporary controls, environmental protection, quality control, construction quality control, and project closeout. The COMPEC contractor will serve as the Contractor of Record only. Specific requirements will be provided at the TO level.
3.3.1 CWP/IWP Format and Delivery
The CWP/IWP will be submitted for approval by the Government. The schedule will be defined in the TO and will depend on the complexity of the project. For simpler projects, the CWP and IWP may be combined into one deliverable. The CWP will primarily be used to illustrate the concept of the project and validate that the TO requirements are clearly understood. It shall include at minimum the project scope, background, and general descriptions of each major work element. The TO may specify additional requirements for the CWP (for example conceptual drawings). The IWP will primarily be used to illustrate the contractor's plan to execute the work. It shall at minimum include the WBS, project schedule, submittal requirements, specifications, and drawings if applicable. The WBS and project schedule are also included in the PMP. The specific requirements, including format, for the CWP/IWP will be specified in the TO.
3.3.2 CWP/IWP Construction Requirements
The Contractor shall plan, develop cost estimates, install, construct, test, operate, maintain, monitor, optimize, and decommission any site in accordance with each TO. The Contractor shall perform work at remote sites and shall document all activities as stated herein. The Contractor shall perform incidental support such as designing, planning, programming, scoping, studying, investigating, evaluating, and consulting on traditional engineering and construction efforts. The Contractor shall also provide training and operational support to Government and other contractor personnel regarding the operations and maintenance of equipment, systems, and facilities. Upon approval of the CWP/IWP by the COR, the Contractor may commence on-site construction activities. Requirements are defined in Section 2.0 and may be further defined in the TO.
3.4 Traditional Construction - Design-Bid-Build (D-B-B)
Under Design-Bid-Build delivery, the COMPEC Contractor will be responsible for providing a line item proposal and construction of a public building, facility, or work. The contractor will be provided a complete set of specifications and construction drawings and will consider these the specific requirements for the TO. The COMPEC contractor will serve as the Contractor of Record only.