Attch 3 Drawings Rev 1.pdf
PDF 5 MB Posted
- Attached to
- Repair Engine Shop Floors, Bldg. 822
- Solicitation number
- FA663326Q003
About this file
This document set consists of architectural drawings and specifications for a construction project at Minneapolis Air Reserve Station, Minnesota.
Project 25-0016 encompasses the sustain and renovation of engine shop floors in Building 822 at Minneapolis Air Reserve Station. The work is divided into two primary components: concrete repair and floor coating. The base bid includes all work except for bid option items related to keynotes 2 and 3 on sheet A-101. The concrete repair phase involves sawcutting and removing deteriorated slab sections between control joints, filling voids beneath the existing slab with compacted granular fill, installing a 6-inch reinforced concrete slab with #4 rebar at 18-inch spacing and microsynthetic fibers over a 10-mil vapor barrier, repairing approximately 400 linear feet of existing cracks, and preparing the floor surface. The concrete must cure for a minimum of 30 days prior to floor coating application. The floor coating phase includes surface preparation and application of Diamond Vogel Mult-E-Poxy Aluminum coating with broadcast silica sand for slip resistance, divided into two phases of approximately 2,600 square feet and 5,200 square feet respectively. Additional work includes removal and replacement of hazard tape markings at electrical equipment and safety stations, totaling approximately 100 linear feet. The drawings specify coordination between concrete and coating contractors, dust mitigation requirements using containment methods and HEPA filtration, drainage protection, and field verification of existing conditions by the contractor. The project was designed by the 934th Civil Engineer Squadron in-house design team, with issue date of 27 April 2026, Revision 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - FA663326Q0003 -Rev1.pdf | ||
| Attch 2 Specifications.pdf | ||
| Attch 5 Submittal Register.xlsx | XLSX spreadsheet | |
| Attch 4 Wage Determination.pdf | ||
| Attch 3 Drawings.pdf | ||
| Solicitation - FA663326Q0003.pdf | ||
| Attch 1 Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
R
EV
. 1 G
-0
R
EV
IS
IO
N S
A
PR
TM
T
C M
S
C M
S
TM
T
TI
TL
E- D
R
AW
IN
G
IN
D
EX
PR
O
JE
C T
-0
SU
ST
AI
N
S H
O P
FL
O
O R
S, B
M
IN
N
EA
PO
LI
S
AI
R R
ES
ER
VE
S
TA
TI
O N
M N
T-001 B-822
AN
SI
D
MINNEAPOLIS AIR RESERVE STATION
PROJECT 25-0016
SUSTAIN ENGINE SHOP FLOORS, B822
27 APRIL 2026 REV. 1
934TH CEC DESIGN TEAM
C
EC
IN
-H
O U
SE
D
ES
IG
N
DRAWING INDEX
SHEET DESCRIPTION
T-001 TITLE - DRAWING INDEX
G-001 PROJECT LOCATION
A-101 FIRST FLOOR PLAN: CONCRETE REPAIR
A-102 FIRST FLOOR PLAN: FLOOR COATING
PROJECT
LOCATION
934TH MAIN GATE
VICINITY MAP- NOT TO SCALE
TH
A
VE
NORTH
ACCESS
GATE
4 TH
T W
LR
IA
I G
N
I F BASE BID: ALL WORK EXCEPT BID OPTION WORK.
BID OPTION: ALL WORK PERTAINING TO KEYNOTES 2 & 3 ON SHEET A-101.
4/27/2026 7:29:35 AM, ANSI full bleed D (34.00 x 22.00 Inches)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text F
X
X X X
X X X X X X X X
X X X X X X X X X
X X
X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
RESTRICTED AREA RESTRICTED AREA
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
R
EV
. 1 G
-0
R
EV
IS
IO
N S
A
PR
TM
T
C M
S
C M
S
PR
O
JE
C
T
LO
C
AT
IO
N
PR
O
JE
C
T
-0
SU
ST
AI
N S
H O
P
FL
O O
R S, B
M
IN
N
EA
PO
LI
S
AI
R
R
ES
ER
VE
S
TA
TI
O
N M
N
G-001
BLDG-822
AN
SI
D
C
EC
IN
-H
O U
SE
D
ES
IG
N
PROJECT LOCATION
NORTH
GENERAL NOTES
1. BUILDING 822 IS LOCATED IN A CONTROLLED AREA. THE CONTRACTOR IS RESPONSIBLE
FOR PROVIDING MATERIALS FOR AND ESTABLISHING THE "FREE ZONES". THE
CONTRACTOR WILL BE REQUIRED TO STAY WITHIN THE BOUNDARIES OF THE ESTABLISHED
"FREE ZONES" OR BE ESCORTED BY AN AUTHORIZED GOVERNMENT REPRESENTATIVE.
2. THE FACILITY WAS CONSTRUCTED IN THE 1940S AND WAS KNOWN TO CONTAIN ASBESTOS
BUILDING MATERIALS, HOWEVER PREVIOUS PROJECTS ABATED THOSE MATERIALS. IF
ADDL. MATERIALS ARE SUSPECTED, CONTRACTOR IS RESPONSIBLE FOR TESTING.
3. THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF EXISTING CONDITIONS AND
FIELD MEASUREMENT. NOTIFY THE PROJECT ENGINEER IF CONDITIONS DIFFER FROM
THOSE DISPLAYED IN THESE DRAWINGS.
4. FREE ZONE 2RA (INDICATED BY DOTTED HATCH) IS LOCATED IN THE RESTRICTED AREA
AND MUST BE ENCLOSED WITH A 4' ORANGE SNOW FENCE SUPPORTED BY WATER FILLED
LOW-PROFILE BARRIERS SPACED AT 50' MAXIMUM WITH RED FLASHING LIGHTS AND IN
ACCORDANCE WITH UFC 3-270-04. SEE DETAIL 2/G-001.
5. FREE ZONES 1 & 2 (NORTH OF THE RESTRICTED AREA) DO NOT REQUIRE LOW-PROFILE
BARRIERS AND MAY BE ENCLOSED WITH WEIGHTED STANCHIONS CONNECTED WITH
YELLOW ROPE, SPACED AT 25' INTERVALS. REFER TO SOW FOR MORE INFORMATION.
USE THIS ENTRANCE
FOR FLOOR COATING PHASES
NTS
WORK AREA - BUILDING 8221
PARKING/LAYDOWN AREA
FREE ZONE 1
FR
EE
ZO
N
E 1
ADDL. FREE ZONE FOR
CONCRETE REPAIR PHASE
USE THIS ENTRANCE
FOR CONCRETE REPAIR PHASE
NTS
LOW PROFILE BARRICADE2
FR
EE
ZO
N
E 2
FREE
ZONE 2RA
4/27/2026 7:17:49 AM, ANSI full bleed D (22.00 x 34.00 Inches)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
R
EV
. 1 G
-0
R
EV
IS
IO
N S
A
PR
TM
T
C M
S
C M
S
FI
R
ST
F
LO
O
R P
LA
N
: C O
N C
R
ET
E R
EP
AI
R
PR
O
JE
C T
-0
SU
ST
AI
N
S H
O P
FL
O
O R
S, B
M
IN
N
EA
PO
LI
S
AI
R R
ES
ER
VE
S
TA
TI
O N
M N
A-101
BLDG-822
AN
SI
D
SHEET KEY NOTES
Scale: 1/8"=1'-0"
FIRST FLOOR PLAN: CONCRETE REPAIR1
A-101
NORTH
XX
1. THE CONTRACTOR IS RESPONSIBLE FOR FIELD MEASUREMENT AND
VERIFICATION OF EXISTING CONDITIONS. NOTIFY THE PROJECT ENGINEER IF
CONDITIONS DIFFER FROM THOSE DEPICTED IN THESE DRAWINGS.
2. CONCRETE REPAIR SHALL BE COMPLETED AND GIVEN 30 DAYS MIN. TO CURE
PRIOR TO APPLYING FLOOR COATING (SHEET A-102). TEST CONCRETE PER
SPECIFICATIONS PRIOR TO APPLYING NEW COATING. CONTRACTOR SHALL
ACCOUNT FOR THIS ADDITIONAL TIME IN THEIR PROPOSAL/SCHEDULE.
3. COORDINATION BETWEEN CONCRETE REPAIR AND FLOOR COATING
CONTRACTORS IS ESSENTIAL TO ENSURE CRACK REPAIR IS PERFORMED IN A
MANNER TO MEET PREPARATION REQUIREMENTS OF THE FLOOR COATING
PRODUCT.
4. MITIGATE CONCRETE DUST DURING CUTTING, DEMOLITION AND GRINDING WITH
TRADITIONAL CONTAINMENT METHODS. EMPLOY TARPS (SECURING TO FLOOR,
WALL & ROOF AS NECESSARY), WET SPRAY METHODS AND/OR HEPA-FILTER
VACUUM EXTRACTION TO ELIMINATE AND/OR CONTAIN AIRBORNE DUST TO THE
GREATEST EXTENT POSSIBLE. CLOSE HVAC VENTS IN THE AREA OF WORK TO
PREVENT DUST FROM ENTERING OTHER AREAS OF THE BUILDING.
5. PLACE DRAINAGE FILTERS OVER DRAINS (3 TOTAL, CTR. TO VFY.) TO PROTECT
FROM DEBRIS ENTERING. THE CONTRACTOR SHALL VACUUM ANY DUST
CREATED FROM SAWING & GRINDING.
GENERAL NOTES:
C
EC
IN
-H
O U
SE
D
ES
IG
N
EXIST. CONTROL
JOINT, TYP.
NTS
SECTION2
#4 DOWELS @ 12" O.C.,
DRILL & EPOXY 6" INTO
EXIST. CONC. FDN. WALL
SEE SHEET NOTE FOR SLAB REINF.
12"
12"
#4 DOWELS X 12" LONG
@ 12" O.C., DRILL & EPOXY 6"
INTO EXIST. EXT. SLAB
EQ.
PROTECT EXIST. BOLLARD
& FOUNDATION
EXIST. EXTERIOR
SLAB
EXIST. CONC. FDN. WALL
NEW EXP. JOINT/
SEALANT
CHAMFER PER
SPECIFICATIONS
PROTECT EXIST. BOLLARD
& FOUNDATION
XXSHEET KEY NOTES
EQ.
MEZZANINE SPACE ABOVE TO CONSIDER FOR DUST MITIGATION. SEE GENERAL
NOTE 4.
SAWCUT & REMOVE ENTIRE SLAB AT AREAS INDICATED BY HATCH (CONTROL JOINT
TO CONTROL JOINT TO INCLUDE THE GARAGE DOOR THRESHOLD). REMOVE ANY
EXISTING ABANDONED CONDUIT AND PIPES IF ENCOUNTERED IN VOIDS BELOW THE
SLAB. ADD APPROX. 100 CF OF FILL TO COMPLETELY FILL EXIST. VOIDS BENEATH
THE EXIST. SLAB & COMPACT. REFER TO ACI-302.1 FOR BASE PREPARATION &
COMPACTION. ONCE SUBGRADE IS PREPARED, PROVIDE A BASE MATERIAL OF
CLEAN, DENSELY GRADED GRANULAR MATERIAL WITH A BALANCED FINE CONTENT;
SEE ACI302.1, SECTION 6.1.4 FOR ADEQUATE MATERIALS. REFER TO ACI-302.1 FOR
SOIL-SUPPORT PREPARATION & COMPACTION. SUBMIT MOISTURE CONTENT AND
DENSITY TEST RESULTS PRIOR TO POURING NEW CONCRETE. PROOF ROLL IN
PRESENCE OF GOVERNMENT INSPECTOR.
POUR NEW 6" SLAB: REINF. W/ #4 @ 18" O.C., TOP, E.W. AND MICROSYNTHETIC
FIBERS, OVER COMPACTED GRANULAR BASE AND 10 MIL VAPOR BARRIER. TOP OF
NEW SLAB TO MATCH TOP OF EXISTING SLAB. DOWEL TO EXISTING ADJACENT
SLABS WITH #4 SMOOTH DOWELS X 18" LONG @ 18" O.C. EPOXY 9" INTO EXIST.
CONCRETE SLAB. GREASE AND PROVIDE EXPANSION CAPS IN NEW CONCRETE.
PROVIDE CONTROL JOINTS AT NO MORE THAN 12 FT. SPACING. SEE DETAIL 2/A-101
FOR SECTION AT GARAGE DOOR.
REPAIR CRACKS PER SPECIFICATIONS, APPROX. 400 LF. CONTRACTOR TO FIELD
VERIFY.
PREPARE FLOOR FOR NEW COATING, DIAMOND VOGEL MULT-E-POXY ALUMINUM
(OR APPROVED EQUAL) PER MANUFACTURER'S INSTRUCTIONS. BROADCAST SILICA
SAND AS RECOMMENDED BY FLOOR COATING MANUFACTURER TO ACHIEVE SLIP
RESISTANCE.
REMOVE EXIST. HAZARD MARKINGS AT ELECTRICAL EQUIPMENT, FIRE
EXTINGUISHERS AND EYE WASH STATIONS. AFTER FLOORING WORK IS COMPLETE,
INSTALL NEW 3" WIDE HAZARD TAPE TO MATCH EXIST. HAZARD MARKINGS.
APPROXIMATE TOTAL = 100 LF, CONTRACTOR TO FIELD VFY.
4/27/2026 7:18:26 AM, ANSI full bleed D (22.00 x 34.00 Inches)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
NORTH
XXGENERAL NOTES:
C
EC
IN
-H
O U
SE
D
ES
IG
N
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
R
EV
. 1 G
-0
R
EV
IS
IO
N S
A
U G
TM
T
C M
S
C M
S
FI
R
ST
F
LO
O
R P
LA
N
: F
LO
O R
C O
AT
IN
G
PR
O
JE
C T
-0
SU
ST
AI
N
S H
O P
FL
O
O R
S, B
M
IN
N
EA
PO
LI
S
AI
R R
ES
ER
VE
S
TA
TI
O N
M N
A-102
BLDG-822
AN
SI
D
SHEET KEY NOTES
Scale: 1/8"=1'-0"
FIRST FLOOR PLAN: FLOOR COATING1
PHASE 1, APPROX. 2600 SF,
CONTRACTOR TO FIELD VFY.
PHASE 2, APPROX. 5200 SF,
CONTRACTOR TO FIELD VFY.
1. THE CONTRACTOR IS RESPONSIBLE FOR FIELD MEASUREMENT AND
VERIFICATION OF EXISTING CONDITIONS. NOTIFY THE PROJECT ENGINEER IF
CONDITIONS DIFFER FROM THOSE DEPICTED IN THESE DRAWINGS.
2. CONCRETE REPAIR SHALL BE COMPLETED AND GIVEN 30 DAYS MIN. TO CURE
PRIOR TO APPLYING FLOOR COATING (SHEET A-102). TEST CONCRETE PER
SPECIFICATIONS PRIOR TO APPLYING NEW COATING. CONTRACTOR SHALL
ACCOUNT FOR THIS ADDITIONAL TIME IN THEIR PROPOSAL/SCHEDULE.
3. COORDINATION BETWEEN CONCRETE REPAIR AND FLOOR COATING
CONTRACTORS IS ESSENTIAL TO ENSURE CRACK REPAIR IS PERFORMED IN A
MANNER TO MEET PREPARATION REQUIREMENTS OF THE FLOOR COATING
PRODUCT.
4. MITIGATE CONCRETE DUST DURING CUTTING, DEMOLITION AND GRINDING WITH
TRADITIONAL CONTAINMENT METHODS. EMPLOY TARPS (SECURING TO FLOOR,
WALL & ROOF AS NECESSARY), WET SPRAY METHODS AND/OR HEPA-FILTER
VACUUM EXTRACTION TO ELIMINATE AND/OR CONTAIN AIRBORNE DUST TO THE
GREATEST EXTENT POSSIBLE. CLOSE HVAC VENTS IN THE AREA OF WORK TO
PREVENT DUST FROM ENTERING OTHER AREAS OF THE BUILDING.
5. PLACE DRAINAGE FILTERS OVER DRAINS (3 TOTAL, CTR. TO VFY.) TO PROTECT
FROM DEBRIS ENTERING. THE CONTRACTOR SHALL VACUUM ANY DUST
CREATED FROM SAWING & GRINDING.
MEZZANINE SPACE ABOVE TO CONSIDER FOR DUST MITIGATION. SEE GENERAL
NOTE 4.
SAWCUT & REMOVE ENTIRE SLAB AT AREAS INDICATED BY HATCH (CONTROL JOINT
TO CONTROL JOINT TO INCLUDE THE GARAGE DOOR THRESHOLD). REMOVE ANY
EXISTING ABANDONED CONDUIT AND PIPES IF ENCOUNTERED IN VOIDS BELOW THE
SLAB. ADD APPROX. 100 CF OF FILL TO COMPLETELY FILL EXIST. VOIDS BENEATH
THE EXIST. SLAB & COMPACT. REFER TO ACI-302.1 FOR BASE PREPARATION &
COMPACTION. ONCE SUBGRADE IS PREPARED, PROVIDE A BASE MATERIAL OF
CLEAN, DENSELY GRADED GRANULAR MATERIAL WITH A BALANCED FINE CONTENT;
SEE ACI302.1, SECTION 6.1.4 FOR ADEQUATE MATERIALS. REFER TO ACI-302.1 FOR
SOIL-SUPPORT PREPARATION & COMPACTION. SUBMIT MOISTURE CONTENT AND
DENSITY TEST RESULTS PRIOR TO POURING NEW CONCRETE. PROOF ROLL IN
PRESENCE OF GOVERNMENT INSPECTOR.
POUR NEW 6" SLAB: REINF. W/ #4 @ 18" O.C., TOP, E.W. AND MICROSYNTHETIC
FIBERS, OVER COMPACTED GRANULAR BASE AND 10 MIL VAPOR BARRIER. TOP OF
NEW SLAB TO MATCH TOP OF EXISTING SLAB. DOWEL TO EXISTING ADJACENT
SLABS WITH #4 SMOOTH DOWELS X 18" LONG @ 18" O.C. EPOXY 9" INTO EXIST.
CONCRETE SLAB. GREASE AND PROVIDE EXPANSION CAPS IN NEW CONCRETE.
PROVIDE CONTROL JOINTS AT NO MORE THAN 12 FT. SPACING. SEE DETAIL 2/A-101
FOR SECTION AT GARAGE DOOR.
REPAIR CRACKS PER SPECIFICATIONS, APPROX. 400 LF. CONTRACTOR TO FIELD
VERIFY.
PREPARE FLOOR FOR NEW COATING, DIAMOND VOGEL MULT-E-POXY ALUMINUM
(OR APPROVED EQUAL) PER MANUFACTURER'S INSTRUCTIONS. BROADCAST SILICA
SAND AS RECOMMENDED BY FLOOR COATING MANUFACTURER TO ACHIEVE SLIP
RESISTANCE.
REMOVE EXIST. HAZARD MARKINGS AT ELECTRICAL EQUIPMENT, FIRE
EXTINGUISHERS AND EYE WASH STATIONS. AFTER FLOORING WORK IS COMPLETE,
INSTALL NEW 3" WIDE HAZARD TAPE TO MATCH EXIST. HAZARD MARKINGS.
APPROXIMATE TOTAL = 100 LF, CONTRACTOR TO FIELD VFY.
4/27/2026 7:19:50 AM, ANSI full bleed D (22.00 x 34.00 Inches)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
| 25-0016-T-001 |
| 25-0016-G-001 |
| Sheets and Views |
| G-001 |
| 25-0016-A-101 |
| Sheets and Views |
| A-101 |
| 25-0016-A-102 |
| Sheets and Views |
| A-102 |
File details come from the government source that posted it. Updated .