Attch 3 Drawings.pdf
PDF 4 MB Posted
- Attached to
- Repair Engine Shop Floors, Bldg. 822
- Solicitation number
- FA663326Q003
About this file
This document is a final design drawing set for Project 25-0016, Sustain Shop Floors at Minneapolis Air Reserve Station in Minnesota, prepared by the 934th Civil Engineer Squadron (CEC) Design Team and issued on February 26, 2026.
The project encompasses repairs and upgrades to Building 822's shop floors, divided into a base bid and optional bid components. The base bid includes all work except the bid option items, which pertain to keynotes 2 and 3 on Sheet A-101. The work is organized into two primary phases: concrete repair (Phase 1) and floor coating (Phase 2). The concrete repair phase involves sawcutting and removing existing slab sections at control joints, removing abandoned conduits and pipes, filling voids with compacted granular material per ACI-302.1 standards, pouring new 6-inch reinforced concrete slabs with #4 rebar at 18-inch centers and microsynthetic fibers, and repairing approximately 400 linear feet of cracks. The floor coating phase applies Diamond Vogel Mult-E-Poxy Aluminum coating (or approved equivalent) to approximately 7,800 square feet total, divided into Phase 1 (2,600 square feet) and Phase 2 (5,200 square feet), with silica sand broadcast for slip resistance. General requirements include 30-day concrete cure time prior to coating application, dust mitigation measures using containment methods and HEPA filtration, coordination between concrete and coating contractors, removal and replacement of hazard markings (approximately 100 linear feet of 3-inch tape), and field verification by the contractor. The design drawings provide floor plans, site location maps, and detailed keynotes specifying materials, preparation methods, and quality assurance requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - FA663326Q0003 -Rev1.pdf | ||
| Attch 3 Drawings Rev 1.pdf | ||
| Attch 2 Specifications.pdf | ||
| Attch 5 Submittal Register.xlsx | XLSX spreadsheet | |
| Solicitation - FA663326Q0003.pdf | ||
| Attch 1 Statement of Work.pdf | ||
| Attch 4 Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
TM
T
TI
TL
E- D
R
AW
IN
G
IN
D
EX
PR
O
JE
C T
-0
SU
ST
AI
N
S H
O P
FL
O
O R
S, B
M
IN
N
EA
PO
LI
S
AI
R R
ES
ER
VE
S
TA
TI
O N
M N
T-001 B-822
AN
SI
D
MINNEAPOLIS AIR RESERVE STATION
PROJECT 25-0016
FINAL DESIGN
26 FEBRUARY 2026
934TH CEC DESIGN TEAM
C
EC
IN
-H
O U
SE
D
ES
IG
N
DRAWING INDEX
SHEET DESCRIPTION
T-001 TITLE - DRAWING INDEX
G-001 PROJECT LOCATION
A-101 FIRST FLOOR PLAN: CONCRETE REPAIR
A-102 FIRST FLOOR PLAN: FLOOR COATING
PROJECT
LOCATION
934TH MAIN GATE
VICINITY MAP- NOT TO SCALE
TH
A
VE
NORTH
ACCESS
GATE
4 TH
T W
LR
IA
I G
N
I F BASE BID: ALL WORK EXCEPT BID OPTION WORK.
BID OPTION: ALL WORK PERTAINING TO KEYNOTES 2 & 3 ON SHEET A-101.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text F
X
X X X
X X X X X X X X
X X X X X X X X X
X X
X X X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
PR
O
JE
C
T
LO
C
AT
IO
N
PR
O
JE
C
T
-0
SU
ST
AI
N S
H O
P
FL
O O
R S, B
M
IN
N
EA
PO
LI
S
AI
R
R
ES
ER
VE
S
TA
TI
O
N M
N
G-001
BLDG-822
AN
SI
D
C
EC
IN
-H
O U
SE
D
ES
IG
N
PROJECT LOCATION
NORTH
GENERAL NOTES
1. BUILDING 822 IS LOCATED IN A CONTROLLED AREA. THE CONTRACTOR IS RESPONSIBLE
FOR PROVIDING MATERIALS FOR AND ESTABLISHING THE "FREE ZONE(S)". THE
CONTRACTOR WILL BE REQUIRED TO STAY WITHIN THE BOUNDARIES OF THE ESTABLISHED
"FREE ZONE(S)" OR BE ESCORTED BY AN AUTHORIZED GOVERNMENT REPRESENTATIVE.
2. THE FACILITY WAS CONSTRUCTED IN THE 1940S AND IS KNOWN TO CONTAIN ASBESTOS
BUILDING MATERIALS, HOWEVER PREVIOUS PROJECTS ABATED THOSE MATERIALS. IF
ADDL. MATERIALS ARE SUSPECTED, CONTRACTOR IS RESPONSIBLE FOR TESTING.
3. THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF EXISTING CONDITIONS AND
FIELD MEASUREMENT. NOTIFY THE PROJECT ENGINEER IF CONDITIONS DIFFER FROM
THOSE DISPLAYED IN THESE DRAWINGS.
USE THIS ENTRANCE
FOR FLOOR COATING PHASES
NTS
WORK AREA - BUILDING 8221
PARKING/LAYDOWN AREA
FREE ZONE
FREE
ZONE
ADDL. FREE ZONE FOR
CONCRETE REPAIR PHASE
USE THIS ENTRANCE
FOR CONCRETE REPAIR PHASE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
FI
R
ST
F
LO
O
R P
LA
N
: C O
N C
R
ET
E R
EP
AI
R
PR
O
JE
C T
-0
SU
ST
AI
N
S H
O P
FL
O
O R
S, B
M
IN
N
EA
PO
LI
S
AI
R R
ES
ER
VE
S
TA
TI
O N
M N
A-101
BLDG-822
AN
SI
D
SHEET KEY NOTES
Scale: 1/8"=1'-0"
FIRST FLOOR PLAN: CONCRETE REPAIR1
A-101
NORTH
XX
1. THE CONTRACTOR IS RESPONSIBLE FOR FIELD MEASUREMENT AND
VERIFICATION OF EXISTING CONDITIONS. NOTIFY THE PROJECT ENGINEER IF
CONDITIONS DIFFER FROM THOSE DEPICTED IN THESE DRAWINGS.
2. CONCRETE REPAIR SHALL BE COMPLETED AND GIVEN 30 DAYS MIN. TO CURE
PRIOR TO APPLYING FLOOR COATING (SHEET A-102). TEST CONCRETE PER
SPECIFICATIONS PRIOR TO APPLYING NEW COATING. CONTRACTOR SHALL
ACCOUNT FOR THIS ADDITIONAL TIME IN THEIR PROPOSAL/SCHEDULE.
3. COORDINATION BETWEEN CONCRETE REPAIR AND FLOOR COATING
CONTRACTORS IS ESSENTIAL TO ENSURE CRACK REPAIR IS PERFORMED IN A
MANNER TO MEET PREPARATION REQUIREMENTS OF THE FLOOR COATING
PRODUCT.
4. MITIGATE CONCRETE DUST DURING CUTTING, DEMOLITION AND GRINDING WITH
TRADITIONAL CONTAINMENT METHODS. EMPLOY TARPS (SECURING TO FLOOR,
WALL & ROOF AS NECESSARY), WET SPRAY METHODS AND/OR HEPA-FILTER
VACUUM EXTRACTION TO ELIMINATE AND/OR CONTAIN AIRBORNE DUST TO THE
GREATEST EXTENT POSSIBLE. CLOSE HVAC VENTS IN THE AREA OF WORK TO
PREVENT DUST FROM ENTERING OTHER AREAS OF THE BUILDING.
5. PLACE DRAINAGE FILTERS OVER DRAINS (3 TOTAL, CTR. TO VFY.) TO PROTECT
FROM DEBRIS ENTERING. THE CONTRACTOR SHALL VACUUM ANY DUST
CREATED FROM SAWING & GRINDING.
GENERAL NOTES:
C
EC
IN
-H
O U
SE
D
ES
IG
N
EXIST. CONTROL
JOINT, TYP.
NTS
SECTION2
#4 DOWELS @ 12" O.C.,
DRILL & EPOXY 6" INTO
EXIST. CONC. FDN. WALL
SEE SHEET NOTE FOR SLAB REINF.
12"
12"
#4 DOWELS X 12" LONG
@ 12" O.C., DRILL & EPOXY 6"
INTO EXIST. EXT. SLAB
EQ.
PROTECT EXIST. BOLLARD
& FOUNDATION
EXIST. EXTERIOR
SLAB
EXIST. CONC. FDN. WALL
NEW EXP. JOINT/
SEALANT
CHAMFER PER
SPECIFICATIONS
PROTECT EXIST. BOLLARD
& FOUNDATION
XXSHEET KEY NOTES
EQ.
MEZZANINE SPACE ABOVE TO CONSIDER FOR DUST MITIGATION. SEE GENERAL
NOTE 4.
SAWCUT & REMOVE ENTIRE SLAB AT AREAS INDICATED BY HATCH (CONTROL JOINT
TO CONTROL JOINT TO INCLUDE THE GARAGE DOOR THRESHOLD). REMOVE ANY
EXISTING ABANDONED CONDUIT AND PIPES IF ENCOUNTERED IN VOIDS BELOW THE
SLAB. ADD APPROX. 100 CF OF FILL TO COMPLETELY FILL EXIST. VOIDS BENEATH
THE EXIST. SLAB & COMPACT. REFER TO ACI-302.1 FOR BASE PREPARATION &
COMPACTION. ONCE SUBGRADE IS PREPARED, PROVIDE A BASE MATERIAL OF
CLEAN, DENSELY GRADED GRANULAR MATERIAL WITH A BALANCED FINE CONTENT;
SEE ACI302.1, SECTION 6.1.4 FOR ADEQUATE MATERIALS. REFER TO ACI-302.1 FOR
SOIL-SUPPORT PREPARATION & COMPACTION. SUBMIT MOISTURE CONTENT AND
DENSITY TEST RESULTS PRIOR TO POURING NEW CONCRETE. PROOF ROLL IN
PRESENCE OF GOVERNMENT INSPECTOR.
POUR NEW 6" SLAB: REINF. W/ #4 @ 18" O.C., TOP, E.W. AND MICROSYNTHETIC
FIBERS, OVER COMPACTED GRANULAR BASE AND 10 MIL VAPOR BARRIER. TOP OF
NEW SLAB TO MATCH TOP OF EXISTING SLAB. DOWEL TO EXISTING ADJACENT
SLABS WITH #4 SMOOTH DOWELS X 18" LONG @ 18" O.C. EPOXY 9" INTO EXIST.
CONCRETE SLAB. GREASE AND PROVIDE EXPANSION CAPS IN NEW CONCRETE.
PROVIDE CONTROL JOINTS AT NO MORE THAN 12 FT. SPACING. SEE DETAIL 2/A-101
FOR SECTION AT GARAGE DOOR.
REPAIR CRACKS PER SPECIFICATIONS, APPROX. 400 LF. CONTRACTOR TO FIELD
VERIFY.
PREPARE FLOOR FOR NEW COATING, DIAMOND VOGEL MULT-E-POXY ALUMINUM
(OR APPROVED EQUAL) PER MANUFACTURER'S INSTRUCTIONS. BROADCAST SILICA
SAND AS RECOMMENDED BY FLOOR COATING MANUFACTURER TO ACHIEVE SLIP
RESISTANCE.
REMOVE EXIST. HAZARD MARKINGS AT ELECTRICAL EQUIPMENT, FIRE
EXTINGUISHERS AND EYE WASH STATIONS. AFTER FLOORING WORK IS COMPLETE,
INSTALL NEW 3" WIDE HAZARD TAPE TO MATCH EXIST. HAZARD MARKINGS.
APPROXIMATE TOTAL = 100 LF, CONTRACTOR TO FIELD VFY.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
NORTH
XXGENERAL NOTES:
C
EC
IN
-H
O U
SE
D
ES
IG
N
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
FI
R
ST
F
LO
O
R P
LA
N
: F
LO
O R
C O
AT
IN
G
PR
O
JE
C T
-0
SU
ST
AI
N
S H
O P
FL
O
O R
S, B
M
IN
N
EA
PO
LI
S
AI
R R
ES
ER
VE
S
TA
TI
O N
M N
A-102
BLDG-822
AN
SI
D
SHEET KEY NOTES
Scale: 1/8"=1'-0"
FIRST FLOOR PLAN: FLOOR COATING1
PHASE 1, APPROX. 2600 SF,
CONTRACTOR TO FIELD VFY.
PHASE 2, APPROX. 5200 SF,
CONTRACTOR TO FIELD VFY.
1. THE CONTRACTOR IS RESPONSIBLE FOR FIELD MEASUREMENT AND
VERIFICATION OF EXISTING CONDITIONS. NOTIFY THE PROJECT ENGINEER IF
CONDITIONS DIFFER FROM THOSE DEPICTED IN THESE DRAWINGS.
2. CONCRETE REPAIR SHALL BE COMPLETED AND GIVEN 30 DAYS MIN. TO CURE
PRIOR TO APPLYING FLOOR COATING (SHEET A-102). TEST CONCRETE PER
SPECIFICATIONS PRIOR TO APPLYING NEW COATING. CONTRACTOR SHALL
ACCOUNT FOR THIS ADDITIONAL TIME IN THEIR PROPOSAL/SCHEDULE.
3. COORDINATION BETWEEN CONCRETE REPAIR AND FLOOR COATING
CONTRACTORS IS ESSENTIAL TO ENSURE CRACK REPAIR IS PERFORMED IN A
MANNER TO MEET PREPARATION REQUIREMENTS OF THE FLOOR COATING
PRODUCT.
4. MITIGATE CONCRETE DUST DURING CUTTING, DEMOLITION AND GRINDING WITH
TRADITIONAL CONTAINMENT METHODS. EMPLOY TARPS (SECURING TO FLOOR,
WALL & ROOF AS NECESSARY), WET SPRAY METHODS AND/OR HEPA-FILTER
VACUUM EXTRACTION TO ELIMINATE AND/OR CONTAIN AIRBORNE DUST TO THE
GREATEST EXTENT POSSIBLE. CLOSE HVAC VENTS IN THE AREA OF WORK TO
PREVENT DUST FROM ENTERING OTHER AREAS OF THE BUILDING.
5. PLACE DRAINAGE FILTERS OVER DRAINS (3 TOTAL, CTR. TO VFY.) TO PROTECT
FROM DEBRIS ENTERING. THE CONTRACTOR SHALL VACUUM ANY DUST
CREATED FROM SAWING & GRINDING.
MEZZANINE SPACE ABOVE TO CONSIDER FOR DUST MITIGATION. SEE GENERAL
NOTE 4.
SAWCUT & REMOVE ENTIRE SLAB AT AREAS INDICATED BY HATCH (CONTROL JOINT
TO CONTROL JOINT TO INCLUDE THE GARAGE DOOR THRESHOLD). REMOVE ANY
EXISTING ABANDONED CONDUIT AND PIPES IF ENCOUNTERED IN VOIDS BELOW THE
SLAB. ADD APPROX. 100 CF OF FILL TO COMPLETELY FILL EXIST. VOIDS BENEATH
THE EXIST. SLAB & COMPACT. REFER TO ACI-302.1 FOR BASE PREPARATION &
COMPACTION. ONCE SUBGRADE IS PREPARED, PROVIDE A BASE MATERIAL OF
CLEAN, DENSELY GRADED GRANULAR MATERIAL WITH A BALANCED FINE CONTENT;
SEE ACI302.1, SECTION 6.1.4 FOR ADEQUATE MATERIALS. REFER TO ACI-302.1 FOR
SOIL-SUPPORT PREPARATION & COMPACTION. SUBMIT MOISTURE CONTENT AND
DENSITY TEST RESULTS PRIOR TO POURING NEW CONCRETE. PROOF ROLL IN
PRESENCE OF GOVERNMENT INSPECTOR.
POUR NEW 6" SLAB: REINF. W/ #4 @ 18" O.C., TOP, E.W. AND MICROSYNTHETIC
FIBERS, OVER COMPACTED GRANULAR BASE AND 10 MIL VAPOR BARRIER. TOP OF
NEW SLAB TO MATCH TOP OF EXISTING SLAB. DOWEL TO EXISTING ADJACENT
SLABS WITH #4 SMOOTH DOWELS X 18" LONG @ 18" O.C. EPOXY 9" INTO EXIST.
CONCRETE SLAB. GREASE AND PROVIDE EXPANSION CAPS IN NEW CONCRETE.
PROVIDE CONTROL JOINTS AT NO MORE THAN 12 FT. SPACING. SEE DETAIL 2/A-101
FOR SECTION AT GARAGE DOOR.
REPAIR CRACKS PER SPECIFICATIONS, APPROX. 400 LF. CONTRACTOR TO FIELD
VERIFY.
PREPARE FLOOR FOR NEW COATING, DIAMOND VOGEL MULT-E-POXY ALUMINUM
(OR APPROVED EQUAL) PER MANUFACTURER'S INSTRUCTIONS. BROADCAST SILICA
SAND AS RECOMMENDED BY FLOOR COATING MANUFACTURER TO ACHIEVE SLIP
RESISTANCE.
REMOVE EXIST. HAZARD MARKINGS AT ELECTRICAL EQUIPMENT, FIRE
EXTINGUISHERS AND EYE WASH STATIONS. AFTER FLOORING WORK IS COMPLETE,
INSTALL NEW 3" WIDE HAZARD TAPE TO MATCH EXIST. HAZARD MARKINGS.
APPROXIMATE TOTAL = 100 LF, CONTRACTOR TO FIELD VFY.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TH
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
| 25-0016-T-001 |
| Sheets and Views |
| T-001 |
| 25-0016-G-001 |
| Sheets and Views |
| G-001 |
| 25-0016-A-101 |
| Sheets and Views |
| A-101 |
| 25-0016-A-102 |
| Sheets and Views |
| A-102 |
File details come from the government source that posted it. Updated .