RFI 001_Repair Base Pavements_2026.06.29.pdf
PDF 155 KB Posted
- Attached to
- Repair Base Pavements
- Solicitation number
- FA6606-26-R-0009
About this file
This is a Request for Information (RFI) report documenting a contractor's inquiry regarding the YTPM 14-0023 Repair Base Pavements project under solicitation number FA6606-26-R-0009. The RFI was requested on June 29, 2026, with no identified potential cost or schedule impact and no subcontractor involvement.
The contractor requested clarification on the thickness of asphalt to be demolished from the green highlighted area of Walker Avenue (East) as shown on sheet C-3, which specifies removal of 16,786 square feet or 1,875 square yards. The contractor needed this information to estimate work costs and noted the discrepancy with sheet C-9, which references 5 inches of asphalt removal from B5425 Parking Lot. The response from WARB directed the contractor to referenced attachments: the YTPM 14-0023 Repair Base Pavements - Pavement Cores document and the Core Location Map, which contain the required thickness specifications for the demolition work.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION REPORT (RFI)
RFI NO. PAGE NO.
SOLICITATION TITLE
Contractor's Request for Information
REQUESTED BY: DATE REQUESTED: Potential Cost Impact
[No] Potential Schedule
Impact [No]SUBCONTRACTOR
RFI
SUBJECT:
DRAWINGS
INFORMATION REQUESTED:
ATTACHMENTS FROM CONTRACTOR: (1 attachment)
NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR
INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS
THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE
IN ACCORDANCE WITH CONTRACT PROVISIONS.
QA REVIEWER'S SIGNATURE DATE
RFI FORM
SOLICITATION NO.
FA6606-26-R-0009 YTPM 14-0023 REPAIR BASE PAVEMENTS
06.29.2026
QUESTION 01:
Sheet C-3 calls to Demo Asphalt (16,786 s.f. / 1,875 s.y.) from the green highlighted area of Walker Ave (East).
What is the thickness of the asphalt to be removed from this area? I ask so we can estimate the cost of this work and because it is referenced on sheet C-9 that 5” of asphalt will be removed from B5425 Parking Lot.
WARB RESPONSE 01:
Please see both the attached YTPM 14-0023 Repair Base Pavements - Pavement Cores and the Core Location Map.