This is a Submittal Register form used to track construction submittals for a "Repair Base Pavements" project. The document serves as a management tool for organizing and monitoring the submission, review, and approval of required construction documents and materials throughout the project lifecycle.

The register identifies multiple categories of submittals organized by specification sections, including preconstruction submittals (baseline construction schedule, accident prevention plan, environmental protection plan, demolition plan), test reports (quality control verification, sampling and testing, field quality control), product data (mix design, concrete specifications, application equipment), certificates (licenses, hot work permits, laboratory accreditation), and closeout submittals (waste determination documentation). Key items requiring approval include the construction schedule, contractor quality control plan, accident prevention plan, environmental and dust control plans, waste management documentation, demolition procedures, asphalt mix design, aggregates testing, and various safety data sheets and certifications. The form provides columns for tracking submission dates, approval needed dates, material needed dates, dates forwarded to approving authority, dates received from contractor, dates forwarded to secondary reviewers, and dates received from secondary reviewers, along with action codes and remarks. Classification markings ("G" for Government) appear throughout, indicating items requiring government approval. The register encompasses work across multiple construction phases from preconstruction planning through project closeout, ensuring comprehensive documentation control for a federal or government-funded pavement repair project.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES

Repair Base Pavements

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GBaseline Construction Schedule

SD-07 Certificates

1.4Monthly Updates

01 33 00 SD-01 Preconstruction Submittals

1.6 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7.1 GAPP - Construction

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

SD-07 Certificates

1.9.1Hot Work Permit

1.14License Certificates

1.8 GActivity Hazard Analysis (Aha)

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 57 19 SD-01 Preconstruction Submittals

1.5.1 GRegulatory Notifications

1.6 GEnvironmental Protection Plan

1.6.7.1 GDirt and Dust Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES

01 57 19 SD-06 Test Reports

1.8.1 GQuarterly Solid Waste Disposal

Report

SD-11 Closeout Submittals

3.5.1 GWaste Determination

Documentation

3.5.2.1 GProject Solid Waste Disposal

Documentation Report

1.5.1 GRegulatory Notifications

01 74 19 SD-01 Preconstruction Submittals

1.6 GConstruction Waste Management

Plan

SD-06 Test Reports

1.8.2Quarterly Reports

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.8Existing Conditions

SD-07 Certificates

1.6 GNotification

32 11 23 SD-06 Test Reports

2.3.1 GInitial Tests

3.11.1 GIn-Place Tests

32 12 13 SD-06 Test Reports

3.7Sampling and Testing

32 12 16.16 SD-03 Product Data

2.4 GMix Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES

32 12 16.16 3.1 GContractor Quality Control

SD-04 Samples

2.2Aggregates

2.3Asphalt Cement Binder

SD-06 Test Reports

2.2 GAggregates

3.1.3.9QC Monitoring

SD-07 Certificates

2.3 GAsphalt Cement Binder

1.3.10Laboratory Accreditation and

Validation

32 16 19 SD-03 Product Data

2.1Concrete

SD-06 Test Reports

3.6Field Quality Control

32 17 23 SD-03 Product Data

2.1.2Application Equipment List

1.3.1 GSafety Data Sheets

2.2.2.1 GReflective media for roads

2.2.1 GWaterborne Paint

SD-07 Certificates

2.2.2.1Reflective Media for Roads

2.2.1Waterborne Paint

1.3.1 GVolatile Organic Compound

SD-08 Manufacturer’s Instructions

2.2.1 GWaterborne Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .