RFI 4 Before Award - Government Response.pdf

PDF 138 KB Posted

Attached to
Add Restroom and Outside Air, Inspection Bay Bldg 5305
Solicitation number
FA660623B0001
Issued by

About this file

This Request for Information report from a prime contractor to a government agency concerns a planned project to add a restroom and outside air to an inspection building. The contractor seeks clarification on the existing fire alarm system's ability to support additional devices and requests the specification and basis of design for insulated metal wall panels to match existing buildings, in response to notes on drawing FA-501. The agency response confirms the insulated wall panels by Star Building Systems as the basis of design and states that the RFI system is not authorization for additional work, directing the contractor to provide written notice to the contracting officer's representative for any considered changed conditions according to the contract.

The related federal contract opportunity solicitation FA6606-23-B-0001 from the Department of the Air Force Reserve Command is for adding a restroom and outside air to Inspection Bay Building 5305. The solicitation documents have been uploaded to the SAM.gov website, and the agency contact information is provided for any questions on accessing the documents.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION REPORT (RFI)

RFI NO. PAGE NO.

Page 1 of

SOLICITATION NO. CONTRACT TITLE PRIME CONTRACTOR

Contractor's Request for Information

REQUESTED BY: DATE REQUESTED Potential Cost Impact

[No] Potential Schedule

Impact [No]SUBCONTRACTOR

RFI

SUBJECT:

DRAWINGS

INFORMATION REQUESTED:

ATTACHMENTS FROM CONTRACTOR: (1 attachment)

Question:

Response:

NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR

INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS

THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE

IN ACCORDANCE WITH CONTRACT PROVISIONS.

QA REVIEWER'S SIGNATURE DATE

RFI FORM

4 Before Award 1

FA6006-23-B-0001 Add Restroom & Outside Air LVIS

Question:

Response:

Are we to assume that the existing fire alarm notification circuit in the building will allow for the added current draw of the new alarm devices.

Please provide a spec or product used for the existing metal panels on the building.

The specification refers to a single skin panel while the drawings indicate an insulated panel.

Please see the notes on sheet FA-501.

The basis of design for the metal panels to be used on this project are the insulated wall panels by Star Building Systems. Pattern and color to match existing as close as possible.