RFI-2 Q and A.pdf

PDF 107 KB Posted

Attached to
Engine Hoist System Load Test BPA
Solicitation number
FA6606-21-R-0004
Issued by

View the file

Other files

File Type Posted
2.5.1 Load Test Procedures.pdf PDF
Pictures.pdf PDF
RFI Q and A.pdf PDF
WD 2015-4095 (v16).pdf PDF
Solicitation - FA660621R0004.pdf PDF
PWS-Hoist Load Test (26July21).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFI) # 2

1) Who will supply the Test Fixtures mentioned in TO 35D3‐3‐84‐1S‐3 section 2‐5? Answer:

Westover Air Reserve Base will supply the test fixtures when it is required in the referenced TO.

2) Will assembly instructions be provided for the Bootstrap Beam Assembly and Hoist systems?

Answer: Yes.

3) Will scales be provide with the Bootstrap Beam Assembly and Hoist systems? Answer: No, scales will not be sent out with the equipment.

4) Who is responsible for the calibration of scales? Answer: Scales will not be sent out with the equipment.

File details come from the government source that posted it. Updated .