Solicitation FA660618Q0002 Amendment 0006
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA6606-18-Q-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0006
The purpose of this amendment is to extend the response date for quotes from 11 July 2018 to 16 July 2018. This extension is to allow additional time for the vendors to review a question/response clarification.
Question: Clin 0018 is looking for the cost for the estimated 600 tons per year but to put items 2-6 on Table A1 in Clin 0003. I am confused because the 600 tons should include everything by adding disposal fee to the wood and mixed paper that is going to increase the estimated tonnage on that clin where in the past that was all included in the 600 tons or clin 0018.
Response: additional information/description for CLINs 0003 and 0018.
CLIN 0003 should be the cost to set out and pick up the 6 non-MSW dumpsters, called out as items 2-5 in Table A1 and further defined in Item 9 of Table A2, which are located in the Recycling/Transfer Station yard. All fees associated with servicing these 6 dumpsters is included in this CLIN. The 2 MSW dumpsters in the yard are covered under CLIN 0001 as explained in the previous amendment. Note that Item 6, Timber/Wood Waste, is considered a MSW and this tonnage is accounted for in Item 1 in Table A1. In other words, the estimated 600 Tons is the total to include all 17 MSW dumpsters and the timber/wood dumpster.
CLIN 0018 is the estimated cost to dispose of the 600 Tons of MSW called out as Item 1 Table A1.
In the event you have already submitted a quotation to this requirement, you will only need to resubmit the Bid Schedule, signed cover page and the CLIN pricing (from solicitation), along with all signed amendments not previously submitted as applicable. If you have not than you shall submit all submittal requirements addressed in the solicitation.
To submit your requirement please read the instructions addressed in the below link .
https://safe.amrdec.army.mil/safe/Guide.aspx
All other terms and conditions remain unchanged and in full effect
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 11-Jul-2018 10:00 AM to 16-Jul-2018 10:00 AM.