This document contains responses to a contractor's questions on a federal solicitation for pavement marking maintenance services. The solicitation FA6606-22-B-0001 from the Department of the Air Force Reserve Command seeks offers to maintain pavement markings at Yuma Territorial Prison Military Reservation in accordance with Statement of Work section 3.3. The contractor is responsible for verifying compliance with transportation, storage, handling and disposal regulations for industrial materials. Permits may be required and contractors can work in multiple areas simultaneously if coordinated with airfield management and the construction inspector for controlled movement areas. The government is tax exempt and escorts will be provided by the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Offerc OF 1419 Pg TOTALS PAGE.pdf | ||
| RFI 3 Pavement Markings_Before Award (2).pdf | ||
| RFI 2 Pavement Markings_Before Award.pdf | ||
| RFI 1 Pavement Markings_Before Award.pdf | ||
| Solicitation - FA660622B0001 Issued.pdf | ||
| Wage Determinations 1.7.22.pdf | ||
| ttb1325d.pdf | ||
| YTPM 22-3001 Pav Mkings SOW FINAL .docx | DOCX document | |
| Bid Schedule Blank for KTR.xlsx | XLSX spreadsheet | |
| 32 17 23 01 Airfield Pavements and Roadways Marking.docx | DOCX document | |
| GROUNDING POINT MARKINGS UFC 3-575-01.docx | DOCX document | |
| 2022 Airfield Marking Overall Plan.pdf | ||
| 32 01 11 52 Airfield Pavements Rubber and Paint Removal.docx | DOCX document | |
| TT-P-1952F (1).pdf | ||
| Engineering Appendix A Airfield Runway Friction Testing.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION REPORT (RFI)
RFI NO. PAGE NO.
Page 1 of
CONTRACT NO. CONTRACT TITLE PRIME CONTRACTOR
Contractor's Request for Information
REQUESTED BY: DATE REQUESTED Potential Cost Impact
[No] Potential Schedule
Impact [No]SUBCONTRACTOR
RFI
SUBJECT:
DRAWINGS
INFORMATION REQUESTED:
ATTACHMENTS FROM CONTRACTOR: (1 attachment)
Question 1:
Response:
NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR
INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS
THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE
IN ACCORDANCE WITH CONTRACT PROVISIONS.
QA REVIEWER'S SIGNATURE DATE
RFI FORM
FA6606-22-B-0001 YTPM 22-3001
Cornerstone 1 March 2022
Question 2:
Question 3:
Response:
Response:
Maintain Pavement Markings
Question 4: Who will be responsible for escorts?
Please confirm if taxes should be carried in proposals?
Response:
Question 5: Will contractors be able to work in multiple areas at the same time?
Response:
The Federal Government is tax exempt.
The contractor is responsible for verifying the need/compliance with all state, local and Federal requirements for the transportation, storage, handling and disposal of industrial materials.
Please read the paint specifications and your procedures for equipment cleaning .
Please read the Statement of Work section 3.3 Security Escorts
Yes but must be coordinated with Airfield Management & the assigned construction inspector when within the controlled movement area.
Please confirm if any state, local, and/or Federal permits will be required on this project?
Please confirm if there are any known hazardous materials?
| RFI NO: 3 |
| PAGE NO Page 1 of: |
| CONTRACT TITLE YTPM 223001: |
| PRIME CONTRACTOR: |
| Contractors Request for Information: |
| REQUESTED BY PS Construction Inc: |
| DATE REQUESTED 14 Feb 2022: |
| Potential Cost Impact No Potential Schedule: |
| SUBCONTRACTOR: |
| RFI: |
| DRAWINGS: |
| INFORMATION REQUESTEDRow1: |
| ATTACHMENTS FROM CONTRACTOR 1 attachment: |
| QA REVIEWERS SIGNATURE: |
| DATE: |