RFI 2 Pavement Markings_Before Award.pdf

PDF 153 KB Posted

Attached to
Maintain Pavement Markings
Solicitation number
FA6606
Issued by

About this file

This document contains a Request for Information report related to solicitation FA6606-22-B-0001 from the Department of the Air Force Reserve Command to maintain pavement markings at Yuma Proving Ground. The solicitation is available on Beta.sam.gov and requests information from the prime contractor, P&S Construction Inc, regarding friction testing specifications and documentation required for an upcoming site visit. The responses clarify that additional friction testing is not required for Runway 05/23 due to recent resurfacing, but may be needed for Runway 15/33 which is used less frequently. No documentation is required for the site visit.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION REPORT (RFI)

RFI NO. PAGE NO.

Page 1 of

CONTRACT NO. CONTRACT TITLE PRIME CONTRACTOR

Contractor's Request for Information

REQUESTED BY: DATE REQUESTED Potential Cost Impact

[No] Potential Schedule

Impact [No]SUBCONTRACTOR

RFI

SUBJECT:

DRAWINGS

INFORMATION REQUESTED:

ATTACHMENTS FROM CONTRACTOR: (1 attachment)

Question 1:

Response:

NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR

INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS

THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE

IN ACCORDANCE WITH CONTRACT PROVISIONS.

QA REVIEWER'S SIGNATURE DATE

RFI FORM

FA6606-22-B-0001 YTPM 22-3001

P&S Construction Inc 16 Feb 2022

Question 2:

Question 3:

It not as common to see single instances of Friction Testing in these RFPs. Due to the costs associated with one time testing, would it behoove the Authority to modify the specification to state that the tester being used is delivered to the Authority upon completion of testing for future use?

Response:

Response:

Maintain Pavement Markings

Is it assumed that the Friction Testing will follow typical standards with testing at 1' and 15' from centerline of the runway, in addition to the edge of runway (non-trafficked /non contaminated) areas specified?

Is there concerns of the existing runways Friction or is the testing to confirm no decrease in Friction upon completion of the pavement markings installation?

Question 4: What documents will be acceptable to access the base during the site visit?

Section A-3.3.3 of Appendix A outlines the location of friction testing.

Due to the recent resurfacing of Runway 05/23, less than a year, an additional friction test is not required.

The only concern is on Runway 15/33 as Runway 05/23 will have less than a years use upon execution of this contract. Now that 05/23 is once again the primary runway, 15/33 will be used infrequently.

Response: No documentation is needed, IAW Section L of the Solicitation (A) anyone wishing to attend the site visit is requested to notify the Contracting Office by 16 Feb 2022, COB. (Email stating how many individuals will attend is sufficient.)

RFI NO: 2
PAGE NO Page 1 of:
CONTRACT TITLE YTPM 223001:
PRIME CONTRACTOR:
Contractors Request for Information:
REQUESTED BY PS Construction Inc:
DATE REQUESTED 14 Feb 2022:
Potential Cost Impact No Potential Schedule:
SUBCONTRACTOR:
RFI:
DRAWINGS:
INFORMATION REQUESTEDRow1:
ATTACHMENTS FROM CONTRACTOR 1 attachment:
QA REVIEWERS SIGNATURE:
DATE: