This document contains a Request for Information (RFI) regarding a federal contract for maintaining pavement markings. The RFI was submitted by P&S Construction Inc. for contract number FA6606-22-B-0001 with the Department of the Air Force Reserve Command. P&S Construction Inc. requested clarification on whether general conditions and overhead costs should be included within the unit costs in the bid schedule or added separately. The contracting officer representative responded that all costs not directly associated with line items should be equally divided among those items. The representative also provided details on meeting location and escort procedures for an upcoming site visit.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION REPORT (RFI)

RFI NO. PAGE NO.

Page 1 of

CONTRACT NO. CONTRACT TITLE PRIME CONTRACTOR

Contractor's Request for Information

REQUESTED BY: DATE REQUESTED Potential Cost Impact

[No] Potential Schedule

Impact [No]SUBCONTRACTOR

RFI

SUBJECT:

DRAWINGS

INFORMATION REQUESTED:

ATTACHMENTS FROM CONTRACTOR: (1 attachment)

Question 1:

Response:

NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR

INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS

THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE

IN ACCORDANCE WITH CONTRACT PROVISIONS.

QA REVIEWER'S SIGNATURE DATE

RFI FORM

FA6606-22-B-0001 YTPM 22-3001

P&S Construction Inc 14 Feb 2022

Upon reviewing the Bid Schedule, it was noticed there are no line items for any general conditions and mark up. Are we to put the general condition and mark up cost within the unit cost or are we able to edit the bid schedule to add general conditions and overhead and profit?

Question 2:

Question 3:

For the site visit, do we need to submit any information to get access to the base?

Response:

Response:

For the site visit, where will the meeting point be?

All other costs not directly associated with the line items on the schedule, as referenced above, shall be equally divided among the bid schedule line items.

You do not need to submit any information to gain access to the base for the site visit. You will be escorted to the Operational Contracting Office by a government employee.

IAW Section L of the solicitation Attendees will meet at the Visitor Center located at 20 Patriot Ave, Westover ARB, Chicopee, MA (Westover Road, and then be escorted to the Operational Contracting Office.

Maintain Pavement Markings

RFI NO:
PAGE NO Page 1 of:
CONTRACT TITLE YTPM 223001:
PRIME CONTRACTOR:
Contractors Request for Information:
REQUESTED BY PS Construction Inc:
DATE REQUESTED 14 Feb 2022:
Potential Cost Impact No Potential Schedule:
SUBCONTRACTOR:
RFI:
DRAWINGS:
INFORMATION REQUESTEDRow1:
ATTACHMENTS FROM CONTRACTOR 1 attachment:
QA REVIEWERS SIGNATURE: