Solicitation Amendment FA570226Q00090001 SF 30.pdf
PDF 516 KB Posted
- Solicitation number
- FA570226Q0009
About this file
This is Amendment 0001 to Solicitation FA570226Q0009, issued by the U.S. Air Force on May 2, 2026, to edit the Contract Line Item (CLIN) structure and add a revised Performance Work Statement (PWS) dated April 30, 2026, while reopening the solicitation for new proposals.
The solicitation concerns quarterly, annual, and unscheduled maintenance and inspection services for Aerial Work Platforms, Mobile Cranes, and Forklifts at Al Udeid Air Base (AUAB) in Qatar. The contracting office is the 379 ECONS located in APO, AE, with Pedro Herrera as the contracting officer. The primary changes include restructuring line items from a single lot-based inspection, testing, and assessment approach to a three-quantity-per-item structure with separate CLINs for quarterly maintenance (0001), annual maintenance (0002), and unscheduled maintenance as-needed (0003). The same structure is replicated across five option periods (1001-1003, 2001-2003, 3001-3003, 4001-4003, 5001-5003), with a Product Service Code of J039 and Firm Fixed Price arrangement specified for scheduled maintenance items. The response due date was extended from February 16, 2026, at 07:00 AM to May 6, 2026, at 05:00 AM. Performance periods have been adjusted to run from May 11 of each award year through May 11 of the following year, with a total contract performance window spanning May 11, 2026, through November 11, 2031. The base period encompasses May 11, 2026, to May 11, 2027, with four one-year options and one partial-year option thereafter. All work is designated 100% small business set-aside. Inspection and acceptance occur at FH4804 (379 ECES CEI, Building 8111) per the PWS criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AWP PWS 30 APRIL 2026.pdf | ||
| Solicitation Amendment - FA570226Q00090001.pdf | ||
| AWP PWS 30 APRIL 2026.docx | DOCX document | |
| Solicitation Amendment FA570226Q00090001 SF 30.pdf | ||
| Solicitation Amendment - FA570226Q00090001.pdf | ||
| Questions and Answers.docx | DOCX document | |
| Aerial Work Platforms PWS AUAB Jan 2026.pdf | ||
| Solicitation - FA570226Q0009.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
02 May 2026
4. REQUISITION/PURCHASE
REQUISITION NUMBER
5. PROJECT NUMBER (if applicable)
6. ISSUED BY CODE FA5702
FA5702 379 ECONS
APO AE 09309-0000, UNIT 1 BOX 1
APO, AE 09309-0000
UNITED STATES
PEDRO HERRERA, Email: pedro.herrera.2@us.af.mil Telephone: 0005863365 PEDRO HERRERA, Email: pedro.herrera.2@us.af.mil Telephone: 0005863365
7. ADMINISTERED BY (if other than Item 6)
CODE
SCD: PAS:
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)
CODE: FACILITY CODE:
9A. AMENDMENT OF SOLICITATION NUMBER
FA570226Q0009
9B. DATED (SEE ITEM 11)
29 Jan 2026
10A. MODIFICATION OF CONTRACT/ORDER
NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; 1 or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required) See Section G - Contract Administration Data
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK
ONE
A.THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment to edit CLIN structure and to add new revised PWS dated 30 April 2026. As well as to reopen the solicitation.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Computer generated. Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA-FAR (48 CFR) 53.243
Created On:
02 May 2026, 06:46 AM Mountain Daylight Time
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form
The following modifications were made:
Information From To Percent Set Aside 100 Small Business Type Small Business Response Due Time 07:00 AM 05:00 AM Response Due Date 16 Feb 2026 06 May 2026
Supplies or Services & Prices or Costs
Line Item 0001
The following Line Item modifications were made:
Information From To Amount +/-
Description Inspection, testing, assessment (all parts separate prices)
Quarterly inspection and maintenance in accordance with the PWS. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain, repair, and load test the Aerial Work Platforms, Mobile Cranes and Forklifts at Al Udeid Air Base, Qatar (AUAB).
Quantity 1 3 +2 Unit of Measure Lot Each
Line Item 0002
The following Line Item modifications were made:
Information From To
Description Base Year
Annual inspection and maintenance in accordance with the PWS. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain, repair, and load test the Aerial Work Platforms, Mobile Cranes and Forklifts at Al Udeid Air Base, Qatar (AUAB).
Unit of Measure Lot Each Product Type Code 9999
Line Item 0003
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Unscheduled Maintenance for the Aerial Work platforms, Mobile Cranes and Forklifts. This CLIN will be funded on an as neededbasis.
Option Line Item 1001
The following Line Item modifications were made:
Information From To Amount +/-
Description Inspection, testing, assessment (all parts separate prices)
Quarterly inspection and maintenance in accordance with the PWS. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain, repair, and load test the Aerial Work Platforms, Mobile Cranes and Forklifts at Al Udeid Air Base, Qatar (AUAB).
Quantity 1 3 +2
FA570226Q00090001
Unit of Measure Lot Each Product Type Code 9999
Option Line Item 1002
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Annual inspection and maintenance in accordance with the PWS. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain, repair, and load test the Aerial Work Platforms, Mobile Cranes and Forklifts at Al Udeid Air Base, Qatar (AUAB).
Product Service Code: J039 Pricing Arrangement: Firm Fixed Price
1 Each
Option Line Item 1003
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Unscheduled Maintenance for the Aerial Work platforms, Mobile Cranes and Forklifts. This CLIN will be funded on an as neededbasis.
Option Line Item 2001
The following Line Item modifications were made:
Information From To Amount +/-
Description Inspection, testing, assessment (all parts separate prices)
Quarterly inspection and maintenance in accordance with the PWS. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain, repair, and load test the Aerial Work Platforms, Mobile Cranes and Forklifts at Al Udeid Air Base, Qatar (AUAB).
Quantity 1 3 +2 Unit of Measure Lot Each Product Type Code 9999
Option Line Item 2002
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Annual inspection and maintenance in accordance with the PWS. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain, repair, and load test the Aerial Work Platforms, Mobile
Option Line Item
Cranes and Forklifts at Al Udeid Air Base, Qatar (AUAB).
Product Service Code: J039 Pricing Arrangement: Firm Fixed Price
1 Each
Option Line Item 2003
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Unscheduled Maintenance for the Aerial Work platforms, Mobile Cranes and Forklifts. This CLIN will be funded on an as neededbasis.
Option Line Item 3001
The following Line Item modifications were made:
Information From To Amount +/-
Description Inspection, testing, assessment (all parts separate prices)
Quarterly inspection and maintenance in accordance with the PWS. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain, repair, and load test the Aerial Work Platforms, Mobile Cranes and Forklifts at Al Udeid Air Base, Qatar (AUAB).
Quantity 1 3 +2 Unit of Measure Lot Each Product Type Code 9999
Option Line Item 3002
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Annual inspection and maintenance in accordance with the PWS. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain, repair, and load test the Aerial Work Platforms, Mobile Cranes and Forklifts at Al Udeid Air Base, Qatar (AUAB).
Product Service Code: J039 Pricing Arrangement: Firm Fixed Price
1 Each
Option Line Item 3003
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Unscheduled Maintenance for the Aerial Work platforms, Mobile Cranes and Forklifts. This CLIN will be funded on an as neededbasis.
Option Line Item 4001
The following Line Item modifications were made:
Information From To Amount +/-
Description Inspection, testing, assessment (all parts separate prices)
Quarterly inspection and maintenance in accordance with the PWS. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain, repair, and load test the Aerial Work Platforms, Mobile Cranes and Forklifts at Al Udeid Air Base, Qatar (AUAB).
Quantity 1 3 +2 Unit of Measure Lot Each Product Type Code 9999
Option Line Item 4002
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Annual inspection and maintenance in accordance with the PWS. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain, repair, and load test the Aerial Work Platforms, Mobile Cranes and Forklifts at Al Udeid Air Base, Qatar (AUAB).
Product Service Code: J039 Pricing Arrangement: Firm Fixed Price
1 Each
Option Line Item 4003
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
Unscheduled Maintenance for the Aerial Work platforms, Mobile Cranes and Forklifts. This CLIN will be funded on an as neededbasis.
Inspection and Acceptance
Line Item 0002
The following Inspection and Acceptance Location(s) were deleted:
Inspection and Acceptance Location - DoDAAC: FH4804
Option Line Item 1001
The following Inspection and Acceptance Location(s) were added:
Inspection and Acceptance Location - DoDAAC: FH4804
Information Value Action Both Location Destination
Inspection and Acceptance Location
FH4804
FH4804 379 ECES CEI
CP 011 974 5580 1248, BLDG 8111
AL UDEID AB
QATAR
Instructions See Performance Work Statement (PWS) for Acceptance/inspection criteria.
The following Inspection and Acceptance Location(s) were deleted:
Inspection and Acceptance Location - DoDAAC: FH4804
Option Line Item 2001
The following Inspection and Acceptance Location(s) were added:
Inspection and Acceptance Location - DoDAAC: FH4804
Information Value Action Both Location Destination
Inspection and Acceptance Location
FH4804
FH4804 379 ECES CEI
CP 011 974 5580 1248, BLDG 8111
AL UDEID AB
QATAR
Instructions See Performance Work Statement (PWS) for Acceptance/inspection criteria.
The following Inspection and Acceptance Location(s) were deleted:
Inspection and Acceptance Location - DoDAAC: FH4804
Option Line Item 3001
The following Inspection and Acceptance Location(s) were added:
Inspection and Acceptance Location - DoDAAC: FH4804
Information Value Action Both Location Destination
Inspection and Acceptance Location
FH4804
FH4804 379 ECES CEI
CP 011 974 5580 1248, BLDG 8111
AL UDEID AB
QATAR
Instructions See Performance Work Statement (PWS) for Acceptance/inspection criteria.
The following Inspection and Acceptance Location(s) were deleted:
Inspection and Acceptance Location - DoDAAC: FH4804
Option Line Item 4001
The following Inspection and Acceptance Location(s) were added:
Inspection and Acceptance Location - DoDAAC: FH4804
Information Value Action Both Location Destination
Inspection and Acceptance Location
FH4804
FH4804 379 ECES CEI
CP 011 974 5580 1248, BLDG 8111
Inspection and Acceptance Location
AL UDEID AB
QATAR
Instructions See Performance Work Statement (PWS) for Acceptance/inspection criteria.
The following Inspection and Acceptance Location(s) were deleted:
Inspection and Acceptance Location - DoDAAC: FH4804
Deliveries or Performance
Line Item 0001
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Mar 2026 to 28 Feb 2027 11 May 2026 to 11 May 2027
Line Item 0002
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Mar 2026 to 28 Feb 2027 11 May 2026 to 11 May 2027
The following Delivery Information was deleted:
Place of Performance - DoDAAC: FH4804
Option Line Item 1001
The following Delivery Information was added:
Place of Performance - DoDAAC: FH4804
Information Value
Address
Place of Performance
FH4804
FH4804 379 ECES CEI
CP 011 974 5580 1248, BLDG 8111
AL UDEID AB
QATAR
Delivery 2009 Calendar Days, From Date of Award to completion of performance
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Mar 2027 to 29 Feb 2028 11 May 2027 to 11 May 2028
The following Delivery Information was deleted:
Place of Performance - DoDAAC: FH4804
Option Line Item 1002
The following Delivery Information was added:
Information Value Period of Performance 11 May 2027 to 11 May 2028
Option Line Item 2001
The following Delivery Information was added:
Place of Performance - DoDAAC: FH4804
Information Value
Address
Place of Performance
FH4804
FH4804 379 ECES CEI
CP 011 974 5580 1248, BLDG 8111
AL UDEID AB
QATAR
Delivery 2009 Calendar Days, From Date of Award to completion of performance
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Mar 2028 to 28 Feb 2029 11 May 2028 to 11 May 2029
The following Delivery Information was deleted:
Place of Performance - DoDAAC: FH4804
Option Line Item 2002
The following Delivery Information was added:
Information Value Period of Performance 11 May 2028 to 11 May 2029
Option Line Item 3001
The following Delivery Information was added:
Place of Performance - DoDAAC: FH4804
Information Value
Address
Place of Performance
FH4804
FH4804 379 ECES CEI
CP 011 974 5580 1248, BLDG 8111
AL UDEID AB
QATAR
Delivery 2009 Calendar Days, From Date of Award to completion of performance
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Mar 2029 to 28 Feb 2030 11 May 2029 to 11 May 2030
The following Delivery Information was deleted:
Place of Performance - DoDAAC: FH4804
Option Line Item 3002
The following Delivery Information was added:
Information Value Period of Performance 11 May 2029 to 11 May 2030
Option Line Item 4001
The following Delivery Information was added:
Place of Performance - DoDAAC: FH4804
Information Value
Address
Place of Performance
FH4804
FH4804 379 ECES CEI
CP 011 974 5580 1248, BLDG 8111
AL UDEID AB
QATAR
Delivery 2009 Calendar Days, From Date of Award to completion of performance
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Mar 2030 to 28 Feb 2031 11 May 2030 to 11 May 2031
The following Delivery Information was deleted:
Place of Performance - DoDAAC: FH4804
Option Line Item 4002
The following Delivery Information was added:
Information Value Period of Performance 11 May 2029 to 11 May 2030
Option Line Item 5001
The following Delivery Information modifications were made:
Information From To Period of Performance 01 Mar 2031 to 31 Aug 2031 11 May 2031 to 11 Nov 2031
| SUMMARY OF CHANGES |
| Solicitation/Contract Form |
| Supplies or Services & Prices or Costs |
| Inspection and Acceptance |
| Deliveries or Performance |
File details come from the government source that posted it. Updated .