Untabulated_Cost_Estimate _LJYC_13-1020_INC-1101.xls
XLS spreadsheet 54 KB Posted
- Solicitation number
- FA5685-13-R-0010
About this file
INC 1101
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Requests_For_Information.docx | DOCX document | |
| INC-1106_Schedule_of_Material_Submittals.xls | XLS spreadsheet | |
| Site_Visit_Reservation_Form.docx | DOCX document | |
| E3-E5-E7-E9.dwg | DWG drawing | |
| WAWF_Instructions.doc | DOC document | |
| E2.dwg | DWG drawing | |
| FA5685-13-R-0010.doc | DOC document | |
| E11.dwg | DWG drawing | |
| C1.dwg | DWG drawing | |
| Preferred_Product_List.xls | XLS spreadsheet | |
| Incirlik_Instuctions.doc | DOC document | |
| E4-E6-E8-E10.dwg | DWG drawing | |
| 13-1020.pdf | ||
| MODEL_MAP.dwg | DWG drawing | |
| TITLE.dwg | DWG drawing | |
| SPECS_13-1020.pdf | ||
| E1.dwg | DWG drawing |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INC-1101 (Front)
| CONTRACTOR | ADDRESS | |||||||||
| 39 CES/CECED | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR REPL HV PROTEC RELAYS TR6,7,8,70 | 0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | ||||||||
| LJYC 13-1020 | 39th AIR BASE WING, INCIRLIK, ADANA, TURKEY | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE | COSTS | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| R E C A P I T U L A T I O N | ||||||||||
| 1 | ELECTRICAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| ELECTRICAL | 0.00 | 0.00 | ||||||||
| 1 | REMOWAL WORKS | LS | ||||||||
| 2 | PROVIDE AND CCV TYPE RING MAIN UNITS | EA | ||||||||
| 3 | PROVIDE AND CCVV TYPE RING MAIN UNITS | EA | ||||||||
| 4 | PROVIDE AND CCCV TYPE RING MAIN UNITS | EA | ||||||||
| 5 | PROVIDE AND INSTALL 1x35/16MM2 XLPE CABLE | LM | ||||||||
| 6 | PROVIDE AND INSTALL 630A CABLE ELBOW | EA | ||||||||
| 7 | PROVIDE AND INSTALL 200A CABLE ELBOW | EA | ||||||||
| 8 | PROVIDE AND INSTALL PROTECTION PANELBOARD | EA | ||||||||
| 9 | PROVIDE AND INSTALL 1/2" EMT CONDUIT C/W JUNCTION BOX AND FITTINGS | LM | ||||||||
| 10 | PROVIDE AND INSTALL 7x1.5MM2 NYA IN 3/4' EMT CONDUIT | LM | ||||||||
| 11 | PROVIDE AND INSTALL 7x1.5MM2 NYA IN 1' EMT CONDUIT | LM | ||||||||
| 12 | PROVIDE AND INSTALL 3x2.5MM2 NYA IN 1/2" EMT CONDUIT | LM | ||||||||
| 13 | PROVIDE AND INSTALL WP STROBE-HORN | EA | ||||||||
| 14 | PROVIDE AND INSTALL HOT-DIP GALVANIZED 5mm CHECKERED PLATE | LS | ||||||||
| 15 | STARTUP AND COMMISSIONING | LS | ||||||||
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
&L&"Arial,Italic"&8
Engineer's Final &"Arial,Bold"&10CONSTRUCTION COST ESTIMATE BREAKDOWN&R&"Arial,Bold"FOR OFFICIAL USE ONLY
SHEET NO. &P OF &N
&L&"Times New Roman,Bold"Form INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)&R&"Arial,Bold"FOR OFFICIAL USE ONLY
INC-1101 (Back)
| INSTRUCTIONS FOR COMPLETING Form INC-1101 | |||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | |||||
| permit itemizing of all direct costs. | |||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square | |||||
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | |||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | |||||
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract | |||||
| will be issued. Otherwise, the contractor is responsible for determining quantity estimates. | |||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | |||||
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | |||||
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. | |||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | |||||
| and of significant dollar value. | |||||
| Col 10 Line Total. Self-explanatory. | |||||
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |||||
| page as follows. | |||||
| TOTAL MATERIAL COSTS | $ | 0.00 | |||
| ------------------------------- | |||||
| TOTAL LABOR COSTS | $ | 0.00 | |||
| ------------------------------- | |||||
| TOTAL OTHER DIRECT COSTS | $ | 0.00 | |||
| ------------------------------- | |||||
| TOTAL COSTS | $ | 0.00 | |||
| ------------------------------- | |||||
| OVERHEAD | % | $ | 0.00 | ||
| ------------------------------- | |||||
| SUBTOTAL | $ | 0.00 | |||
| ------------------------------- | |||||
| PROFIT | % | $ | 0.00 | ||
| ------------------------------- | |||||
| TOTAL PRICE | $ | 0.00 | |||
| DATE : | FIRM NAME | ||||
| ----------------------------------------------------------------- | |||||
| TITLE: | BY | ||||
| ---------------------------------------------------------- | ----------------------------------------------------------------- | ||||
| INSTRUCTIONS TO OFFERORS | |||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |||||
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | |||||
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data | |||||
| (see ASPR 3-807.3(e) and 3-807.4). | |||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |||||
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | |||||
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | |||||
| a. The existing, verifiable data. | |||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | |||||
| c. The contingencies used by the offeror in his proposed price. | |||||
| In short, the offeror's estimating process itself needs to be disclosed. | |||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |||||
| and made available to the contracting officer or his authorized representative upon request. | |||||
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | |||||
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection | |||||
| with any negotiations prior to contract award. | |||||
| (Reverse of INC-1101., MAY 08) |