Requests_For_Information.docx
DOCX document 15 KB Posted
- Solicitation number
- FA5685-13-R-0010
About this file
Attached are the RFIs for the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| INC-1106_Schedule_of_Material_Submittals.xls | XLS spreadsheet | |
| Site_Visit_Reservation_Form.docx | DOCX document | |
| E3-E5-E7-E9.dwg | DWG drawing | |
| WAWF_Instructions.doc | DOC document | |
| E2.dwg | DWG drawing | |
| FA5685-13-R-0010.doc | DOC document | |
| E11.dwg | DWG drawing | |
| C1.dwg | DWG drawing | |
| Preferred_Product_List.xls | XLS spreadsheet | |
| Incirlik_Instuctions.doc | DOC document | |
| E4-E6-E8-E10.dwg | DWG drawing | |
| 13-1020.pdf | ||
| Untabulated_Cost_Estimate _LJYC_13-1020_INC-1101.xls | XLS spreadsheet | |
| MODEL_MAP.dwg | DWG drawing | |
| TITLE.dwg | DWG drawing | |
| SPECS_13-1020.pdf | ||
| E1.dwg | DWG drawing |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA5685-13-R-0010; LJYC 13-1020; Repair High Voltage Protection Relays Requests for Information 1.
Q. During the site visit of the TR70, it has been stated that existing Energy Analyzer on the cubicle feeding TR101 and TR102 will be re-used. This is not mentioned in the SOW or the Project Drawings. The use of the existing Energy Analyzer requires a measuring section in the new TR70 RMU. Are the transformer values for TR101 and TR102 indicated in the drawing E1 are valid? Please clarify this issue.
A. KTR will provide measuring cubicle (Complete with CT and VT) for TR101’s cubicle.
1.
Q. Performance period for the project is indicated as 73 days at the solicitation document. Delivery time for certain products reach up to 3 months, which is longer than the projected performance period. Will separate Material NTP be issued prior to Construction NTP for this project, in order to compensate the long delivery times of the material.
A. Material NTP will be issued prior to Construction NTP.
1.
Q. It is written CCCV type Ring Main Unit for TR#70 in drawing sheet E10. But, same drawing shows CCVV type Ring Main Unit. Please clarify which one is correct.
A. It is CCVV type Ring Main Unit.
//SIGNED//
JASON M. RIMER, SrA, USAF Contract Specialist, 39 CONS/LGCA