INC-1106_Schedule_of_Material_Submittals.xls
XLS spreadsheet 52 KB Posted
- Solicitation number
- FA5685-13-R-0010
About this file
INC 1106
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Requests_For_Information.docx | DOCX document | |
| Site_Visit_Reservation_Form.docx | DOCX document | |
| E3-E5-E7-E9.dwg | DWG drawing | |
| WAWF_Instructions.doc | DOC document | |
| E2.dwg | DWG drawing | |
| FA5685-13-R-0010.doc | DOC document | |
| E11.dwg | DWG drawing | |
| C1.dwg | DWG drawing | |
| Preferred_Product_List.xls | XLS spreadsheet | |
| Incirlik_Instuctions.doc | DOC document | |
| E4-E6-E8-E10.dwg | DWG drawing | |
| 13-1020.pdf | ||
| Untabulated_Cost_Estimate _LJYC_13-1020_INC-1101.xls | XLS spreadsheet | |
| MODEL_MAP.dwg | DWG drawing | |
| TITLE.dwg | DWG drawing | |
| SPECS_13-1020.pdf | ||
| E1.dwg | DWG drawing |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 13-1020 | RPR REPL HV PROTEC RELAYS TR6,7,8,70 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| GENERAL | ||||||||||||||||||||||
| 1 | SUBMITTAL SCHEDULE (SPEC SEC 01 33 00) | NTP+10 D | ||||||||||||||||||||
| 2 | SAFETY PLAN (SPEC SEC 01 35 30) | |||||||||||||||||||||
| 3 | QUALITY CONTROL PLAN (SPEC SEC 01 45 00. 00 20 & 01 45 04. 00 10)) | |||||||||||||||||||||
| 4 | KEY PERSONNEL LIST (SPEC SEC 01 45 00. 00 20) | |||||||||||||||||||||
| 5 | PROGRESS SCHEDULE (SPEC SEC 01 32 01) | |||||||||||||||||||||
| 6 | EQUIPMENT DELIVERY SCHEDULE (SPEC SEC 01 32 01) | |||||||||||||||||||||
| 7 | OPERATION AND MAINTENANCE MANUALS (SPEC SEC 01 78 23) (Hardcopy: 1 original, 2 copies and 1 CD) | |||||||||||||||||||||
| 8 | AS BUILT DATA (SPEC SEC 01 77 00) | |||||||||||||||||||||
| 9 | RED LINE DRAWINGS (SPEC SEC 01 77 00) | |||||||||||||||||||||
| 10 | HAZARDOUS MATERIAL LIST IN AF FORM 3952 (SPEC SEC 01 57 20) | |||||||||||||||||||||
| 11 | PHASING PLAN (SPEC SEC 01 32 01) | |||||||||||||||||||||
| 12 | Construction Debris Tally sheet (SPEC SEC 01 57 20.00 ) | |||||||||||||||||||||
| 13 | Certification and Calibration Documents (SPEC SEC 01 57 20.00 ) | |||||||||||||||||||||
| 14 | POWER OUTAGE AND WORK SCHEDULE |
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 4, May 2011)
ELECTRICAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 13-1020 | RPR REPL HV PROTEC RELAYS TR6,7,8,70 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 1 | ALL KINDS OF BUILDING WIRE AND CABLE (Spec Sec 26 05 19. 00 10) | 3 | 3 | 3 | ||||||||||||||||||
| 2 | ALL KINDS OF ELECTRICAL METALLIC TUBING (Spec Sec 26 20 00 ) | 3 | 3 | 3 | ||||||||||||||||||
| 3 | ALL KINDS OF PULL AND JUNCTION BOXES (Spec Sec 26 20 00 ) | 3 | 3 | 3 | ||||||||||||||||||
| 4 | LV CABLES (Spec Sec 26 05 19.00 10) | 3 | 3 | 3 | 3 | |||||||||||||||||
| 5 | DIFFERENT SIZES MV (15 KV ) CABLE, SPEC 26 05 13.00 40 | 3 | 3 | 3 | ||||||||||||||||||
| 6 | RING MANIN UNIT WITH ALL ACCESSORIES (Spec Sec. 26 11 16) | 3 | 3 | 3 | 3 | 3 | ||||||||||||||||
| 7 | SHOP DRAWINGS FOR RING MAIN UNIT INSTALLATION, DWG E5, E7, E9 | 3 | ||||||||||||||||||||
| 8 | OVER CURRENT PROTECTION RELAY AND SETTINGS, DWG E11, SPEC 26 05 73 | 3 | 3 | 3 | ||||||||||||||||||
| 9 | 200A AND 600A PLUG FOR RING MAIN UNIT | 3 | 3 | 3 | ||||||||||||||||||
| 10 | SHOP DRAWING FOR BUCHOLZ, PROTECTION RELAY CONNECTION DETAILS | 3 | ||||||||||||||||||||
| 11 | TEST INSTRUMENTS FOR TEST | 3 | 3 | 3 | ||||||||||||||||||
| 12 | NETA ATS TEST LIST AND THIRD PARTY TESTING ORGANIZATION | 3 | 3 | |||||||||||||||||||
| 13 | CABLE TAG | 3 | 3 | |||||||||||||||||||
| 14 | GALVANIZED CHECKERED PLATE | 3 | 3 | |||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 13-1020 | RPR REPL HV PROTEC RELAYS TR6,7,8,70 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| 15 | PHASE ROTATIONAL TEST AND TEST EQUIPMENT, SPEC SEC 26 08 00 | 3 | 3 | 3 | 3 | |||||||||||||||||
| 16 | SHOP DRAWING FOR PROTECTION PANELNOARD | 3 | ||||||||||||||||||||
| 17 | PROTECTION PANELBOARD C/W ALL EQUIPMETS, SEPC SEC 26 24 16 | 3 | 3 | 3 | 3 |
&CATTACHMENT 4
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)
File details come from the government source that posted it. Updated .