INC-1106_Schedule_of_Material_Submittals.xls

XLS spreadsheet 52 KB Posted

Attached to
LJYC 13-1020; Repair High Voltage Protection Relays
Solicitation number
FA5685-13-R-0010
Issued by

About this file

INC 1106

View the file

Other files

File Type Posted
Requests_For_Information.docx DOCX document
Site_Visit_Reservation_Form.docx DOCX document
E3-E5-E7-E9.dwg DWG drawing
WAWF_Instructions.doc DOC document
E2.dwg DWG drawing
FA5685-13-R-0010.doc DOC document
E11.dwg DWG drawing
C1.dwg DWG drawing
Preferred_Product_List.xls XLS spreadsheet
Incirlik_Instuctions.doc DOC document
E4-E6-E8-E10.dwg DWG drawing
13-1020.pdf PDF
Untabulated_Cost_Estimate _LJYC_13-1020_INC-1101.xls XLS spreadsheet
MODEL_MAP.dwg DWG drawing
TITLE.dwg DWG drawing
SPECS_13-1020.pdf PDF
E1.dwg DWG drawing
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLESOLICITATION/CONTRACT NO.
LJYC 13-1020RPR REPL HV PROTEC RELAYS TR6,7,8,70
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NOITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST DATAPLAN, SCHEDULE, LISTAS-BUILT DRAWINGSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NODATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
D=DAYSAPPROVEDDISAPROVED
GENERAL
1SUBMITTAL SCHEDULE (SPEC SEC 01 33 00)NTP+10 D
2SAFETY PLAN (SPEC SEC 01 35 30)
3QUALITY CONTROL PLAN (SPEC SEC 01 45 00. 00 20 & 01 45 04. 00 10))
4KEY PERSONNEL LIST (SPEC SEC 01 45 00. 00 20)
5PROGRESS SCHEDULE (SPEC SEC 01 32 01)
6EQUIPMENT DELIVERY SCHEDULE (SPEC SEC 01 32 01)
7OPERATION AND MAINTENANCE MANUALS (SPEC SEC 01 78 23) (Hardcopy: 1 original, 2 copies and 1 CD)
8AS BUILT DATA (SPEC SEC 01 77 00)
9RED LINE DRAWINGS (SPEC SEC 01 77 00)
10HAZARDOUS MATERIAL LIST IN AF FORM 3952 (SPEC SEC 01 57 20)
11PHASING PLAN (SPEC SEC 01 32 01)
12Construction Debris Tally sheet (SPEC SEC 01 57 20.00 )
13Certification and Calibration Documents (SPEC SEC 01 57 20.00 )
14POWER OUTAGE AND WORK SCHEDULE

&CATTACHMENT 4

&L&6Form INC-1106. Schedule of Material Submittals. (Rev 4, May 2011)

ELECTRICAL

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLESOLICITATION/CONTRACT NO.
LJYC 13-1020RPR REPL HV PROTEC RELAYS TR6,7,8,70
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NOITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST DATAPLAN, SCHEDULE, LISTAS-BUILT DRAWINGSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NODATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
D=DAYSAPPROVEDDISAPROVED
ELECTRICAL
1ALL KINDS OF BUILDING WIRE AND CABLE (Spec Sec 26 05 19. 00 10)333
2ALL KINDS OF ELECTRICAL METALLIC TUBING (Spec Sec 26 20 00 )333
3ALL KINDS OF PULL AND JUNCTION BOXES (Spec Sec 26 20 00 )333
4LV CABLES (Spec Sec 26 05 19.00 10)3333
5DIFFERENT SIZES MV (15 KV ) CABLE, SPEC 26 05 13.00 40333
6RING MANIN UNIT WITH ALL ACCESSORIES (Spec Sec. 26 11 16)33333
7SHOP DRAWINGS FOR RING MAIN UNIT INSTALLATION, DWG E5, E7, E93
8OVER CURRENT PROTECTION RELAY AND SETTINGS, DWG E11, SPEC 26 05 73333
9200A AND 600A PLUG FOR RING MAIN UNIT333
10SHOP DRAWING FOR BUCHOLZ, PROTECTION RELAY CONNECTION DETAILS3
11TEST INSTRUMENTS FOR TEST333
12NETA ATS TEST LIST AND THIRD PARTY TESTING ORGANIZATION33
13CABLE TAG33
14GALVANIZED CHECKERED PLATE33
SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLESOLICITATION/CONTRACT NO.
LJYC 13-1020RPR REPL HV PROTEC RELAYS TR6,7,8,70
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NOITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST DATAPLAN, SCHEDULE, LISTAS-BUILT DRAWINGSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NODATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
D=DAYSAPPROVEDDISAPROVED
15PHASE ROTATIONAL TEST AND TEST EQUIPMENT, SPEC SEC 26 08 003333
16SHOP DRAWING FOR PROTECTION PANELNOARD3
17PROTECTION PANELBOARD C/W ALL EQUIPMETS, SEPC SEC 26 24 163333

&CATTACHMENT 4

&L&6Form INC-1106. Schedule of Material Submittals. (Rev 1, Dec 2008)

File details come from the government source that posted it. Updated .