ASHE 181087 REV2 07feb BLANK Cost Estimate.xls

XLS spreadsheet 1 MB Posted

Attached to
ASHE 18-1087 SUSTAIN HVAC SYSTEM MULTI, AREA F AND C, AVIANO AIR BASE, ITALY
Solicitation number
FA568220R0003
Issued by

About this file

This is a cost estimate breakdown for an HVAC system sustainment project at Aviano Air Base in Italy. The project involves work across multiple buildings in Areas C and F, including demolitions, mechanical and electrical work. Key items include replacing fan coil units, air handling units, chillers, control valves and piping. Labor, material and other direct costs are broken down by line item. The total estimated contract price will be determined by summing the costs. The related solicitation is for the ASHE 18-1087 project and has a projected value between $500,000 to $1,000,000. Interested vendors must have an adequate Italian SOA certification in category OG11 and register in SAM. The work will be performed according to Italian law and an on-site visit is scheduled. Proposals are due by the specified date at the LVIS gate in Area F.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

410 REV2

CONTRACTOR COST ESTIMATE BREAKDOWN REV2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
SUSTAIN HVAC SYSTEM MULTI - BLDG 410 REV2
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1087 REV2AREA C, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BLDG 410 (NO CHANGE)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche0.000.000.00
1REMOVAL OF EXISTING VERTICAL CABINET FANCOIL UNIT, MECHANICAL & ELECTRICAL CONNECTIONS AND FITTINGS
Rimozione del ventilconvettore a mobiletto esistente, connessioni meccaniche ed elettriche ed accessoriIT. No. Art. n.1LS/AC11.000.00
2REMOVAL OF EXISTING 4 WAY CASSETTE FANCOIL UNIT, MECHANICAL & ELECTRICAL CONNECTIONS AND FITTINGS
Rimozione del ventilconvettore a cassetta a 4 vie esistente, connessioni meccaniche ed elettriche ed accessoriIT. No. Art. n.2LS/AC1.000.00
Total Mechanical - Totale Meccanico0.00
Ic Electrical Demolitions - Ie Demolizioni Elettriche0.000.00
3REMOVE F/A SYSTEM
Rimozione Impianto Allarme IncendioIT. No. Art. n.3LS/AC1.000.00
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I0.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
4REMOVAL AND REINSTALLATION OF SUSPENDED CEILING PANELS
Rimozione e reinstallazione pannelli contrrosoffittoIT. No. Art. n.1LS/AC1.00
5PREPAINTED GALVANIZED STEEL PIPING COVER
Carter in accio zincato preverniciatpo per protezione tubiIT. No. Art. n.2EA/NO11.00
Total Architectural - Totale Architettura
TOTAL PART II / Totale Parte II0.000.000.000.00
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
6NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-01

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-01IT. No. Art. n.1aEA/NO4.00
7NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-02

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-02IT. No. Art. n.1bEA/NO3.00
8NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-03

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-03IT. No. Art. n.1cEA/NO4.00
9NEW 4 WAY CASSETTE ECM FANCOIL UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCC-01

Nuovo ventilconvettore a cessetta ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori.FCC-01IT. No. Art. n.2EA/NO1.00
10SYSTEM BALANCING AND TECHNICAL TEST REPORT
bilanciamento del sistema e redazione reportIT. No. Art. n.3LS/AC1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III0.000.000.000.00
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici0.000.00
Fire Alarm System systems - Impianto Allarme Incedio
11SMOKE DETECTORS
Rilevatori di fumoIT. No. Art. n.1EA/NO40
12HEAT DETECTORS
Rilevarori di CaloreIT. No. Art. n.2EA/NO25
13RED PILOT LIGHT
Lampada spia rossaIT. No. Art. n.3EA/NO30
14PULL STATIONS
Stazioni manualiIT. No. Art. n.4EA/NO20
15Audio/video devices
Dispositivi audio/videoIT. No. Art. n.5EA/NO18
16ADDREASSABLE FIRE ALARM CONTROL PANEL
Centrale rivelazione incendi indirizzabileIT. No. Art. n.6EA/NO1
17ALARM BELL
Campana di allarmeIT. No. Art. n.7EA/NO1
18FTE40HM1 2X2,5 MMQ CABLE
Cavo FTE40HM1 2X2,5 mmqIT. No. Art. n.8LM/ML430
19METAL CABLE TRAY 100x100 MM
Canalina Metallica 100x100 mmIT. No. Art. n.9LM/ML200
20PVC RIGID CONDUIT DIAM. 40 MM
Tubazione Rigida in PVC Diam. 40 mmIT. No. Art. n.10aLM/ML60
21PVC RIGID CONDUIT DIAM. 25 MM
Tubazione Rigida in PVC Diam. 25 mmIT. No. Art. n.10bLM/ML100
22PVC FLEXIBLE CONDUIT DIAM. 25 MM
Tubazione Flesibile in PVC Diam. 25 mmIT. No. Art. n.11LM/ML70
23JUNCTION BOX 80X80X40 MM
Scatola di Derivazione 80x80x40 mmIT. No. Art. n.12LM/ML77
24F/A programmation
Programmazione quadro F/AIT. No. Art. n.13LS/AC1
Total Fire Alarm System - Totale Impianto Allarme Incendio
TOTAL PART IV - Totale Parte IV0.000.000.000.00
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &P of &N

416 REV2

CONTRACTOR COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 416
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1087AREA C, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BLDG 416 (NO CHANGE)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche0.000.000.00
1REMOVAL OF EXISTING FANCOIL UNIT, MECHANICAL & ELECTRICAL CONNECTIONS AND FITTINGS
Rimozione del ventilconvettore esistente, connessioni meccaniche ed elettriche ed accessoriIT. No. Art. n.1LS/AC8.000.00
2REMOVAL OF DX UNIT, MECHANICAL & ELECTRICAL CONNECTIONS AND FITTINGS
Rimozione dell'unità ad espansione diretta, connessioni meccaniche ed elettriche ed accessoriIT. No. Art. n.2LS/AC1.000.00
Total Mechanical - Totale Meccanico0.00
Ic Electrical Demolitions - Ie Demolizioni Elettriche
3REMOVE F/A SYSTEM
Rimozione Impianto Allarme IncendioIT. No. Art. n.3LS/AC1.000.00
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I0.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
4REMOVAL AND REINSTALLATION OF SUSPENDED CEILING PANELS
Rimozione e reinstallazione pannelli contrrosoffittoIT. No. Art. n.1LS/AC1.00
5PREPAINTED GALVANIZED STEEL PIPING COVER
Carter in accio zincato preverniciatpo per protezione tubiIT. No. Art. n.2EA/NO8.00
Total Architectural - Totale Architettura
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
6NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-01

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-01IT. No. Art. n.1aEA/NO2.00
7NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-02

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-02IT. No. Art. n.1bEA/NO1.00
8NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-03

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-03IT. No. Art. n.1cEA/NO5.00
9SYSTEM BALANCING AND TECHNICAL TEST REPORT
bilanciamento del sistema e redazione reportIT. No. Art. n.3LS/AC1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici0.000.00
Fire Alarm System systems - Impianto Allarme Incedio
10SMOKE DETECTORS
Rilevatori di fumoIT. No. Art. n.1EA/NO28
11HEAT DETECTORS
Rilevarori di CaloreIT. No. Art. n.2EA/NO8
12RED PILOT LIGHT
Lampada spia rossaIT. No. Art. n.3EA/NO18
13PULL STATIONS
Stazioni manualiIT. No. Art. n.4EA/NO8
14Audio/video devices
Dispositivi audio/videoIT. No. Art. n.5EA/NO8
15CONVENTIONAL FIRE ALARM CONTROL PANEL
Centrale Rivelazione Incendi ConvenzionaleIT. No. Art. n.6EA/NO1
16FTE40HM1 2X1,5 MMQ CABLE
Cavo FTE40HM1 2X1,5 mmqIT. No. Art. n.7LM/ML170
17METAL CABLE TRAY 100x100 MM
Canalina Metallica 100x100 mmIT. No. Art. n.8LM/ML40
18PVC RIGID CONDUIT DIAM. 40 MM
Tubazione Rigida in PVC Diam. 40 mmIT. No. Art. n.9aLM/ML35
19PVC RIGID CONDUIT DIAM. 25 MM
Tubazione Rigida in PVC Diam. 25 mmIT. No. Art. n.9bLM/ML55
20PVC FLEXIBLE CONDUIT DIAM. 25 MM
Tubazione Flesibile in PVC Diam. 25 mmIT. No. Art. n.10LM/ML45
21JUNCTION BOX 80X80X40 MM
Scatola di Derivazione 80x80x40 mmIT. No. Art. n.11LM/ML42
22F/A programmation
Programmazione quadro F/AIT. No. Art. n.12LS/AC1
Total Fire Alarm System - Totale Impianto Allarme Incendio
TOTAL PART IV - Totale Parte IV
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &P of &N

907 REV2

CONTRACTOR COST ESTIMATE BREAKDOWN REV2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 907 REV2
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1087 REV2AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BLDG 907 (CHANGE)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche0.000.000.00
1REMOVAL OF EXISTING AIR HANDLING UNIT AHU-01, INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS, ACTUTATORS, SENSORS, DDC UNIT AND FITTINGS.
Rimozione dell'unità di trattamento aria esistente AHU-01, comprese le connessioni meccaniche ed elettriche, attuatori, sensori, unità DDC e accessoriIT. No. Art. n.1LS/AC1.000.00
2REMOVAL OF EXISTING MINI AIR HANDLING UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS, THERMOSTAT, CONTROL VALVES AND FITTINGS
Rimozione della mini UTA esistente comprensiva di connessioni meccaniche ed elettriche, termostato, valvole di regolazione ed accessoriIT. No. Art. n.2LS/AC4.000.00
3TEMPORARY REMOVAL AND RELOCATE OF EXISTING WATER TREATMENT SYSTEM TO ALLOW NEW AHU INSTALL.
Rimozione temporanea e riposizionamento dell'esistente sistema di trattametno acqua per consentire l'installazione della nuova AHUIT. No. Art. n.3LS/AC1.00
4REMOVAL OF N°2 EXISTING AHU-02 HUMIDIFIER
Rimozione di n°2 umidificatore esistenti a servizio AHU-02IT. No. Art. n.4LS/AC1.00
5REMOVAL OF EXISTING CHILLER UNIT, MECHANICAL AND ELECTRICAL CONNECTION AND FITTINGS
Rimozione del chiller esistente, connessioni meccaniche ed elettriche ed accessoriIT. No. Art. n.5LS/AC1.00
6REMOVAL OF EXISTING CARRIER UNIT, MECHANICAL AND ELECTRICAL CONNECTION AND FITTINGS
Rimozione del CARRIER esistente, connessioni meccaniche ed elettriche ed accessoriIT. No. Art. n.6LS/AC1.00
Total Mechanical - Totale Meccanico
Ic Electrical Demolitions - Ie Demolizioni Elettriche
Not Applicable/Non applicabile
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
6REMOVAL AND REINSTALLATION OF SUSPENDED CEILING PANELS
Rimozione e reinstallazione pannelli contrrosoffittoIT. No. Art. n.1LS/AC1.000.000.00
Total Architectural - Totale Architettura0.00
TOTAL PART II / Totale Parte II0.000.000.000.00
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
7NEW AHU-01 INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS, CONTROL AND SHUT OFF VALVES, PIPING AND DUCTWORK FURNISHING AND ADJUSTMENT AND FITTINGS
Nuova unità di trattamento aria AHU-01 comprensiva di connessioni meccaniche ed elettriche, valvole di regolazione e intercettazione, modifica e fornitura tubazioni e canalizzazioni e accessoriIT. No. Art. n.1EA/NO1.00
8NEW DDC UNIT INCLUDING CONTROLLED POINTS AND FIELD ELEMENTS, WIRING, PROGRAMMING, CONTROL PANEL AND FITTINGS. REUSE AND REPROGRAM EXISTING DDC UNIT FOR CONTROL OF AHU-02. CANCELEDIT. No. Art. n.2
9NEW MINI AIR HANDLING UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS, FRESH AIR INTAKE GRILLE WITH G3 FILTER, BRACKETS, ROOM PANEL, 3 WAY CONTROL VALVES, SILENCER, DUCTWORK ADJUSTMENT AND FITTINGS. AHUM-01
Nuova mini unità di trattamento aria comprensiva di connessioni meccaniche ed elettriche, griglia di presa aria esterna con filtro G3, staffaggi, pannello ambiente, valvole di controllo a 3 vie, silenziatore, modifica canalizzazione e accessori. AHUM-01IT. No. Art. n.3aEA/NO1.00
10NEW MINI AIR HANDLING UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS, FRESH AIR INTAKE GRILLE WITH G3 FILTER, BRACKETS, ROOM PANEL, 3 WAY CONTROL VALVES, SILENCER, DUCTWORK ADJUSTMENT AND FITTINGS. AHUM-03
Nuova mini unità di trattamento aria comprensiva di connessioni meccaniche ed elettriche, griglia di presa aria esterna con filtro G3, staffaggi, pannello ambiente, valvole di controllo a 3 vie, silenziatore, modifica canalizzazione e accessori. AHUM-03IT. No. Art. n.3bEA/NO1.00
11NEW MINI AIR HANDLING UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS, FRESH AIR INTAKE GRILLE WITH G3 FILTER, BRACKETS, ROOM PANEL, 3 WAY CONTROL VALVES, SILENCER, DUCTWORK ADJUSTMENT AND FITTINGS. AHUM-04
Nuova mini unità di trattamento aria comprensiva di connessioni meccaniche ed elettriche, griglia di presa aria esterna con filtro G3, staffaggi, pannello ambiente, valvole di controllo a 3 vie, silenziatore, modifica canalizzazione e accessori. AHUM-04IT. No. Art. n.3cEA/NO1.00
12NEW MINI AIR HANDLING UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS, BRACKETS, ROOM PANEL, 3 WAY CONTROL VALVES, SILENCER, DUCTWORK ADJUSTMENT AND FITTINGS. AHUM-02
Nuova mini unità di trattamento aria comprensiva di connessioni meccaniche ed elettriche, staffaggi, pannello ambiente, valvole di controllo a 3 vie, silenziatore, modifica canalizzazione e accessori. AHUM-02IT. No. Art. n.4EA/NO1.00
13NEW BLUEBOX CHILLER UNIT WITH HYDRONIC MODULE INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS AND FITTINGS (88kw)
Nuovo refrigeratore BLUEBOX e con modulo idronico comprensivo di connessioni meccaniche ed elettriche e accessoriIT. No. Art. n.5LS/AC1.00
13NEW HUMIDIFIER FOR AHU-02
Nuovo umidificatore per AHU-2IT. No. Art. n.6LS/AC1.00
14NEW BLUEBOX CHILLER UNIT 205 KW, WITH HYDRONIC MODULE INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS AND FITTINGS
Nuovo refrigeratore BLUEBOX 205 kw e con modulo idronico comprensivo di connessioni meccaniche ed elettriche e accessoriIT. No. Art. n.7LS/AC1.00
15SYSTEM BALANCING AND TECHNICAL TEST REPORT
bilanciamento del sistema e redazione reportIT. No. Art. n.8LS/AC1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III0.000.000.000.00
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici0.000.00
Not Applicable/Non applicabile
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &P of &N

1013 REV2

CONTRACTOR COST ESTIMATE BREAKDOWN REV2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1013 (NO CHANGE)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1087 REV2AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BLDG 1013
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche0.00
1REMOVAL OF EXISTING FANCOIL UNIT, MECHANICAL & ELECTRICAL CONNECTIONS AND FITTINGS
Rimozione del ventilconvettore esistente, connessioni meccaniche ed elettriche ed accessoriIT. No. Art. n.1LS/AC4.000.00
2REMOVAL OF EXISTING BURIED HOT WATER PIPES INSIDE THE BUILDING
Rimozione delle tubazioni esistenti acqua calda all'interno del fabbricatoIT. No. Art. n.2LS/AC1.000.00
3REMOVAL OF EXISTING BURIED HOT WATER PIPES FROM BOILER ROOM FEEDING FANCOIL UNITS
Rimozione delle tubazioni esistenti interrate di acqua calda dalla centrale termica alimentanti i ventilconvettoriIT. No. Art. n.3LS/AC1.000.00
4REMOVAL OF DX UNIT, MECHANICAL & ELECTRICAL CONNECTIONS AND FITTINGS
Rimozione dell'unità ad espansione diretta, connessioni meccaniche ed elettriche ed accessoriIT. No. Art. n.4EA/NO2.000.00
Total Mechanical - Totale Meccanico0.00
Ic Electrical Demolitions - Ie Demolizioni Elettriche0.000.00
5REMOVE F/A SYSTEM
Rimozione Impianto Allarme IncendioIT. No. Art. n.5LS/AC1.000.00
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I0.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
6REMOVAL AND REINSTALLATION OF SUSPENDED CEILING PANELS
Rimozione e reinstallazione pannelli contrrosoffittoIT. No. Art. n.1LS/AC1.00
7PREPAINTED GALVANIZED STEEL PIPING COVER
Carter in accio zincato preverniciatpo per protezione tubiIT. No. Art. n.2EA/NO4.00
8NEW CONCRETE PAD
Nuovo basamento in calcestruzzoIT. No. Art. n.3LS/AC1.00
9UTILITY TRENCHES
Trincee sottoserviziIT. No. Art. n.4LS/AC1.00
Total Architectural - Totale Architettura
TOTAL PART II / Totale Parte II0.000.000.000.00
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
10NEW BURIED PIPES FROM BOILER ROOM FEEDING NEW FANCOIL UNITS INCLUDING BACKFILLING
Nuove tubazioni interrate di acqua calda dalla centrale termica alimentanti i nuovi ventilconvettori compreso il rinterroIT. No. Art. n.1LS/AC1.00
11FURNISHING AND INSTALLATION OF NEW BLUEBOX CHILLER UNIT CH-01 INCLUDING EXPANSION TANK, INERTIAL TANK AND FITTINGS
Fornitura e posa in opera di nuovo refrigeratore BLUEBOX CH-01 comprensivo di vaso di espansione, serbatoio inerziale e accessoriIT. No. Art. n.2LS/AC1.00
12NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-01

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-01IT. No. Art. n.3aEA/NO4.00
13NEW CHILLED WATER PIPING FEEDING NEW FANCOIL UNITS
Nuova tubazione acqua refrigerata per alimentazione nuovi ventilconvettoriIT. No. Art. n.4LS/AC1.00
14NEW CONDENSATE DRAIN PIPING
Nuove linea di scarico condensaIT. No. Art. n.5LS/AC1.00
15NEW MAKE UP WATER LINE
Nuova linea di reintegroIT. No. Art. n.6LS/AC1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici0.000.00
Power System - Impianto Forza Motrice
16RES. CURR. MAGNETOT. CIRCUIT BREAKER AND FEEDING LINE FG16OM16 3G4 MMQ CABLE FOR NEW CHILLER
Interruttore magnetot.diff.e linea di alimentazione con cavo FG16OM16 3G4 mmq del nuovo refrigeratoreIT. No. Art. n.1LS/AC1
Total Power System - Totale Impianto Forza Motrice
Fire Alarm System systems - Impianto Allarme Incedio
17SMOKE DETECTORS
Rilevatori di fumoIT. No. Art. n.2EA/NO9
18RED PILOT LIGHT
Lampada spia rossaIT. No. Art. n.3EA/NO5
19PULL STATIONS
Stazioni manualiIT. No. Art. n.4EA/NO2
20Audio/video devices
Dispositivi audio/videoIT. No. Art. n.5EA/NO2
21ALARM BELL
Campana di allarmeIT. No. Art. n.6EA/NO1
22CONVENTIONAL FIRE ALARM CONTROL PANEL
Centrale Rivelazione Incendi ConvenzionaleIT. No. Art. n.7EA/NO1
23FTE40HM1 2X1,5 MMQ CABLE
Cavo FTE40HM1 2X1,5 mmqIT. No. Art. n.8LM/ML60
24METAL CABLE TRAY 100x100 MM
Canalina Metallica 100x100 mmIT. No. Art. n.9LM/ML15
25PVC RIGID CONDUIT DIAM. 40 MM
Tubazione Rigida in PVC Diam. 40 mmIT. No. Art. n.10aLM/ML15
26PVC RIGID CONDUIT DIAM. 25 MM
Tubazione Rigida in PVC Diam. 25 mmIT. No. Art. n.10bLM/ML15
27PVC FLEXIBLE CONDUIT DIAM. 25 MM
Tubazione Flesibile in PVC Diam. 25 mmIT. No. Art. n.11LM/ML5
28JUNCTION BOX 80X80X40 MM
Scatola di Derivazione 80x80x40 mmIT. No. Art. n.12LM/ML11
29F/A programmation
Programmazione quadro F/AIT. No. Art. n.13LS/AC1
Total Fire Alarm System - Totale Impianto Allarme Incendio0.000.000.000.00
TOTAL PART IV - Totale Parte IV0.000.000.000.00
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &P of &N

1405 CANX

CONTRACTOR COST ESTIMATE BREAKDOWN REV2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1405 CANCELED
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1087 REV2AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &P of &N

1407 REV2

CONTRACTOR COST ESTIMATE BREAKDOWN REV2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1407
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1087 REV2AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BLDG 1407 (NO CHANGE)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
1REMOVAL OF WATERPROOFING MEMBRANE
Rimozione dui guaina impermeabilizzanteIT. No. Art. n.1SM/MQ81.6000
Total Architectural - Totale Architettura0.00
Ib Mechanical Demolitions - Demolizioni Meccaniche0.000.000.00
2REMOVAL OF EXISTING AIR HANDLING UNIT, INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS, DUCTWORK, ACTUTATORS, SENSORS, DDC UNIT AND FITTINGS
Rimozione dell'esistente unità di trattamento aria esistente, comprese le connessioni meccaniche ed elettriche, canalizzazioni, attuatori, sensori, unità DDC e accessoriIT. No. Art. n.2LS/AC1.000.00
3REMOVAL OF EXISTING HOT/CHILLED WATER PIPING, CONTROL AND SHUTOFF VALVES AND FITTINGS
Rimozione delle tubazioni esistenti di acqua calda/refrigerata, valvole di controllo e regolazione e accessoriIT. No. Art. n.3LS/AC1.000.00
4REMOVAL AND RELOCATION OF EXISTING DX CONDENSING UNIT FOOR MOUNTED
Rimozione e riposizionamento di unità condensante DX installata a pavimentoIT. No. Art. n.4LS/AC1.00
5REMOVAL AND RELOCATION OF EXISTING DX CONDENSING UNIT WALL MOUNTED
Rimozione e riposizionamento di unità condensante DX installata a pareteIT. No. Art. n.5LS/AC1.00
Total Mechanical - Totale Meccanico
Ic Electrical Demolitions - Ie Demolizioni Elettriche0.000.00
Not Applicable/Non applicabile
TOTAL PART I / Totale Parte I0.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
6NEW WATERPROOFING MEMBRANE
Nuova Guaina ImpermeabilizzanteIT. No. Art. n.1SM/MQ81.60
7ROOF REPAIR
Ripristino coperturaIT. No. Art. n.2LS/AC1.00
8PROTECTIVE CASES/FLASHINGS
Scossasline e involucri di protezioneIT. No. Art. n.3LS/AC1.00
Total Architectural - Totale Architettura
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
9COMPLETE REPLACEMENT OD DAMAGED PIPEWORK AND DEVICES IN MECH ROOM
Sostituzione delle tubazioni e dispositivi danneggiati all'interno del locale meccanicoIT. No. Art. n.1LS/AC1.00
10NEW CHEMICAL POT FEEDER AND DIRT/SLUDGE SEPARATOR CPF-1
Nuovo filtro a masse chiarificatore e defangatore CPF-1IT. No. Art. n.2EA/NO1.00
11NEW ENERGY RECOVERY UNIT AHU-01 INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS, NEW DUCTWORK, 3-WAY CONTROL VALVE AND FITTINGS
Nuovo recuperatore AHU-01 comprensivo di connessioni meccaniche ed elettriche, nuova canalizzazione, valvola di controllo a 3 vie e accessoriIT. No. Art. n.3EA/NO1.00
12NEW AHU-02 INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS, NEW DUCTWORK, SENSORS AND FIELD ELEMENTS, 3 WAY CONTROL VALVE AND FITTINGS
Nuova unità di trattamento aria AHU-02 comprensiva di connessioni meccaniche ed elettriche, nuove canalizzazioni, sensori ed elementi in campo, valvola di controllo a 3 vie e accessoriIT. No. Art. n.4EA/NO1.00
13NEW DDC-1
Nuovo DDC-1IT. No. Art. n.5LS/AC1.00
14NEW HOT/CHILLED WATER PIPING INCLUDING BRACKETS, SHUTOFF VALVES, INSULATION, ALUMINUM COVER AND FITTINGS
Nuova tubazione di acqua calda/refrigerata compresi gli staffaggi, valvole di intercettazione, isolamento e lamierino e accessoriIT. No. Art. n.6LS/AC1.00
15SYSTEM BALANCING AND TECHNICAL TEST REPORT
bilanciamento del sistema e redazione reportIT. No. Art. n.7LS/AC1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III0.000.000.000.00
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici0.000.00
Power System - Impianto Forza Motrice
16RES. CURR. MAGNETOT. CIRCUIT BREAKER FOR NEW AHU FAN
Interruttore magnetot.diff. per ventilatore nuova UTAIT. No. Art. n.1EA/NO1
Total Power System - Totale Impianto Forza Motrice
TOTAL PART IV - Totale Parte IV0.000.000.000.00
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &P of &N

1434 REV2

CONTRACTOR COST ESTIMATE BREAKDOWN REV2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1434
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1087 REV2AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BLDG 1434 (CHANGE)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche0.000.000.00
1REMOVAL OF EXISTING CHILLER UNIT CANCELED, work performed by CE personellIT. No. Art. n.1
2REMOVAL OF EXISTING CIRCULATING PUMP AND FITTINGS
Rimozione della pompa di circolazione esistente ed accessoriIT. No. Art. n.2LS/AC1.000.00
3TEMPORARY REMOVAL OF EXISTING INERTIAL TANK IT-01
Rimozione temporanea del serbatoio inerziale esistente IT-01IT. No. Art. n.3LS/AC1.000.00
4REMOVAL OF EXISTING 3-WAY CONTROL VALVES OF AHU-01 AND AHU-02 AT THE ATTIC LEVEL
Rimozione delle valvole di regolazione a tre vie delle AHU-01 ed AHU-02 installate nel sottotettoIT. No. Art. n.4LS/AC1.000.00
Total Mechanical - Totale Meccanico0.00
Ic Electrical Demolitions - Ie Demolizioni Elettriche0.000.00
Not Applicable/Non applicabile
TOTAL PART I / Totale Parte I0.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
5REMOVAL AND REINSTALLATION OF SUSPENDED CEILING PANELS
Rimozione e reinstallazione pannelli contrrosoffittoIT. No. Art. n.1LS/AC1.000.000.00
Total Architectural - Totale Architettura0.00
TOTAL PART II / Totale Parte II0.000.000.000.00
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
6REMOVAL OF EXISTING CHILLER UNIT CANCELED, work performed by CE personellIT. No. Art. n.1
7RE-INSTALLATION IN NEW POSITION OF EXISTING INERTIAL TANK IT-01
Re-installazione in nuova posizione del serbatoio inerziale esistente IT-01IT. No. Art. n.2EA/NO1.00
8NEW CHILLED WATER PIPING
Nuove tubazioni acqua refrigerataIT. No. Art. n.3LS/AC1.00
9SYSTEM BALANCING AND TECHNICAL TEST REPORT
bilanciamento del sistema e redazione reportIT. No. Art. n.4LS/AC1.00
10NEW CHECK VALVES AND BALL VALVES IN MECH ROOM WITH PIPING ADJUSTMENT
Nuove valvole di ritegno e valvole a sfera nelal centrale meccanica con adeguamento tubazioniIT. No. Art. n.5LS/AC1.00
11PROVIDE COMPLETE REVISION OF AHUs
Provvedere alla completa revisione delle UTAIT. No. Art. n.6LS/AC1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III0.000.000.000.00
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici0.000.00
Not Applicable/Non applicabile
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale
OR US DOLLARS (RATE 1$ = 0,8582 €)

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &P of &N

1483 REV2

CONTRACTOR COST ESTIMATE BREAKDOWN REV2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1483 (CHANGE)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1087 REV2AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BLDG 1483
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche0.000.000.00
1REMOVAL OF EXISTING CHILLER UNIT, MECHANICAL AND ELECTRICAL CONNECTION AND FITTINGS
Rimozione del chiller esistente, connessioni meccaniche ed elettriche ed accessoriIT. No. Art. n.1LS/AC1.000.00
Total Mechanical - Totale Meccanico0.00
Ic Electrical Demolitions - Ie Demolizioni Elettriche0.000.00
Not Applicable/Non applicabile
TOTAL PART I / Totale Parte I0.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
Not Applicable/Non applicabile
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
1ONLY INSTALLATION. CHILLER UNIT BLUEBOX, INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS, PIPING WITH INSULATION, ANTI VIBRATING JOINTS, CHECK AND SHUTOFF VALVE AND FITTINGS
sola installazione chiller comprensivo di connessioni meccaniche ed elettriche, tubazione con isolamento, giunti antivibranti, valvole di ritegno e intercettazione e accessoriIT. No. Art. n.1
2NEW INERTIAL TANK
Nuovo serbatoio inerzialeIT. No. Art. n.2EA/NO1.00
3NEW CHILLED WATER PIPING
Nuove tubazioni acqua refrigerataIT. No. Art. n.3LS/AC1.00
4SYSTEM BALANCING AND TECHNICAL TEST REPORT
bilanciamento del sistema e redazione reportIT. No. Art. n.4LS/AC1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III0.000.000.000.00
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici0.000.00
Not Applicable/Non applicabile
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &P of &N

14462 REV2

CONTRACTOR COST ESTIMATE BREAKDOWN REV2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 10462 (CHANGE)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1087 REV2AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BLDG 10462
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche0.00
1REMOVAL OF EXISTING DUCTED DX UNIT AND EXTERNAL UNIT CANCELED Rimozione dell'unità ad espansione diretta canalizzata esistente e la relativa unità esterna CANCELLATOIT. No. Art. n.1
Total Mechanical - Totale Meccanico0.000.000.000.000.00
Ic Electrical Demolitions - Ie Demolizioni Elettriche0.000.00
2REMOVE F/A SYSTEM
Rimozione Impianto Allarme IncendioIT. No. Art. n.2LS/AC1.000.00
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I0.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
3REMOVAL AND REINSTALLATION OF SUSPENDED CEILING PANELS
Rimozione e reinstallazione pannelli contrrosoffittoIT. No. Art. n.1LS/AC1.00
Total Architectural - Totale Architettura
TOTAL PART II / Totale Parte II0.000.000.000.00
CANCELED PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
4CANCELED FURNISHING AND INSTALLATION OF NEW CHILLER UNIT CH-01IT. No. Art. n.1
5CANCELED. NEW MINI AIR HANDLING UNITIT. No. Art. n.2
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III0.000.000.000.00
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici0.000.00
Power System - Impianto Forza Motrice
6RES. CURR. MAGNETOT. CIRCUIT BREAKER AND FEEDING LINE FG16OM16 5G4 MMQ CABLE FOR NEW CHILLER
Interruttore magnetot.diff.e linea di alimentazione con cavo FG16OM16 5G4 mmq del nuovo refrigeratoreIT. No. Art. n.1LS/AC1
Total Power System - Totale Impianto Forza Motrice
Fire Alarm System systems - Impianto Allarme Incedio
7SMOKE DETECTORS
Rilevatori di fumoIT. No. Art. n.2EA/NO13
8HEAT DETECTORS
Rilevarori di CaloreIT. No. Art. n.3EA/NO3
8RED PILOT LIGHT
Lampada spia rossaIT. No. Art. n.4EA/NO7
9PULL STATIONS
Stazioni manualiIT. No. Art. n.5EA/NO5
10Audio/video devices
Dispositivi audio/videoIT. No. Art. n.6EA/NO5
11CONVENTIONAL FIRE ALARM CONTROL PANEL
Centrale Rivelazione Incendi ConvenzionaleIT. No. Art. n.7EA/NO1
12FTE40HM1 2X1,5 MMQ CABLE
Cavo FTE40HM1 2X1,5 mmqIT. No. Art. n.8LM/ML60
13PVC RIGID CONDUIT DIAM. 40 MM
Tubazione Rigida in PVC Diam. 40 mmIT. No. Art. n.9aLM/ML25
14PVC RIGID CONDUIT DIAM. 25 MM
Tubazione Rigida in PVC Diam. 25 mmIT. No. Art. n.9bLM/ML50
15PVC FLEXIBLE CONDUIT DIAM. 25 MM
Tubazione Flesibile in PVC Diam. 25 mmIT. No. Art. n.10LM/ML10
16JUNCTION BOX 80X80X40 MM
Scatola di Derivazione 80x80x40 mmIT. No. Art. n.11LM/ML24
17F/A programmation
Programmazione quadro F/AIT. No. Art. n.12LS/AC1
Total Fire Alarm System - Totale Impianto Allarme Incendio
TOTAL PART IV - Totale Parte IV0.000.000.000.00
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &P of &N

SUM BLDGS

CONTRACTOR COST ESTIMATE BREAKDOWN REV2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1087 REV2AREA C - AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BUILDING SUMMARY / Riepologo per Fabbricati
1BUILDING 410 - SHOPS
2BUILDING 416 - WOOD CARPENTRY SHOP
3BUILDING 907 - P.MEL LABORATORY
4BUILDING 1013 - PETROL OPS
5BUILDING 1405 - GYM CANCELED
6BUILDING 1407 - SHOPPETTE
7BUILDING 1434 - FIRE BRIGADE
8BUILDING 1483 - TLF
9BUILDING 10462 - BCE
TOTAL PRICE / Costo Totale

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &P of &N

GRAND TOTAL

ASHE 18-1087- DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - AREA F AND AREA C, AVIANO AB, REV2
INSTRUCTIONS FOR COMPLETING AF FORM 3052
TOTAL MATERIAL COSTS€
TOTAL LABOR COSTS€
TOTAL OTHER DIRECT COSTS€
TOTAL DIRECT COSTS€
OVERHEAD%€
SUBTOTAL€
PROFIT%€
TOTAL PRICE€
DATEFIRM NAME
TITLEBY
INSTRUCTIONS TO OFFERORS

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

File details come from the government source that posted it. Updated .