ASHE 181087 CCEB REV1 BLANK.pdf
PDF 267 KB Posted
- Solicitation number
- FA568220R0003
About this file
This is a solicitation for the ASHE 18-1087 SUSTAIN HVAC SYSTEM MULTI project at Aviano Air Base in Italy. The project involves renovating and upgrading HVAC systems across multiple buildings in Areas F and C of the base. Work includes demolitions, mechanical and electrical installations and upgrades, architectural repairs, and balancing of new systems. Estimated value is between $500,000 to $1 million. Interested vendors must hold a current System for Award Management registration and Site Organization Authorization certification in category OG11. A site visit will be scheduled for interested firms. Proposals are due by the date specified in the solicitation. The work will be performed under host nation laws and the contract will be awarded on a lump sum basis.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY Sheet 1 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
SUSTAIN HVAC SYSTEM MULTI - BLDG 410 REV1
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA C, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche
REMOVAL OF EXISTING VERTICAL CABINET FANCOIL UNIT,
MECHANICAL & ELECTRICAL CONNECTIONS AND FITTINGS
Rimozione del ventilconvettore a mobiletto esistente, connessioni meccaniche ed elettriche ed accessori
IT. No.
Art. n. 1 LS/AC 11.00
REMOVAL OF EXISTING 4 WAY CASSETTE FANCOIL UNIT,
MECHANICAL & ELECTRICAL CONNECTIONS AND FITTINGS
Rimozione del ventilconvettore a cassetta a 4 vie esistente, connessioni meccaniche ed elettriche ed accessori
IT. No.
Art. n. 2 LS/AC 1.00
Total Mechanical - Totale Meccanico
Ic Electrical Demolitions - Ie Demolizioni Elettriche
3 REMOVE F/A SYSTEM
Rimozione Impianto Allarme Incendio
IT. No.
Art. n. 3 LS/AC 1.00
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
REMOVAL AND REINSTALLATION OF SUSPENDED CEILING
PANELS
Rimozione e reinstallazione pannelli contrrosoffitto
IT. No.
Art. n. 1 LS/AC 1.00
5 PREPAINTED GALVANIZED STEEL PIPING COVER
Carter in accio zincato preverniciatpo per protezione tubi
IT. No.
Art. n. 2 EA/NO 11.00
Total Architectural - Totale Architettura
BLDG 410 (NO CHANGE)
FOR OFFICIAL USE ONLY Sheet 2 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
SUSTAIN HVAC SYSTEM MULTI - BLDG 410 REV1
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA C, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
TOTAL PART II / Totale Parte II
FOR OFFICIAL USE ONLY Sheet 3 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
SUSTAIN HVAC SYSTEM MULTI - BLDG 410 REV1
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA C, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING
MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY
ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF
VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.
FCV-01
Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-01
IT. No.
Art. n. 1a EA/NO 4.00
NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING
MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY
ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF
VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.
FCV-02
Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-02
IT. No.
Art. n. 1b EA/NO 3.00
NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING
MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY
ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF
VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.
FCV-03
Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-03
IT. No.
Art. n. 1c EA/NO 4.00
NEW 4 WAY CASSETTE ECM FANCOIL UNIT INCLUDING
MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY
ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF
VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.
FCC-01
Nuovo ventilconvettore a cessetta ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori.FCC-01
IT. No.
Art. n. 2 EA/NO 1.00
10 SYSTEM BALANCING AND TECHNICAL TEST REPORT
bilanciamento del sistema e redazione report
IT. No.
Art. n. 3 LS/AC 1.00
Total Mechanical - Totale Meccanico
FOR OFFICIAL USE ONLY Sheet 4 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
SUSTAIN HVAC SYSTEM MULTI - BLDG 410 REV1
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA C, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
TOTAL PART III - Totale Parte III
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici
Fire Alarm System systems - Impianto Allarme Incedio
11 SMOKE DETECTORS
Rilevatori di fumo
IT. No.
Art. n. 1 EA/NO 40
12 HEAT DETECTORS
Rilevarori di Calore
IT. No.
Art. n. 2 EA/NO 25
13 RED PILOT LIGHT
Lampada spia rossa
IT. No.
Art. n. 3 EA/NO 30
14 PULL STATIONS
Stazioni manuali
IT. No.
Art. n. 4 EA/NO 20
FOR OFFICIAL USE ONLY Sheet 5 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
SUSTAIN HVAC SYSTEM MULTI - BLDG 410 REV1
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA C, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
15 Audio/video devices Dispositivi audio/video
IT. No.
Art. n. 5 EA/NO 18
16 ADDREASSABLE FIRE ALARM CONTROL PANEL
Centrale rivelazione incendi indirizzabile
IT. No.
Art. n. 6 EA/NO 1
17 ALARM BELL
Campana di allarme
IT. No.
Art. n. 7 EA/NO 1
18 FTE40HM1 2X2,5 MMQ CABLE
Cavo FTE40HM1 2X2,5 mmq
IT. No.
Art. n. 8 LM/ML 430
19 METAL CABLE TRAY 100x100 MM Canalina Metallica 100x100 mm
IT. No.
Art. n. 9 LM/ML 200
20 PVC RIGID CONDUIT DIAM. 40 MM
Tubazione Rigida in PVC Diam. 40 mm
IT. No.
Art. n. 10a LM/ML 60
21 PVC RIGID CONDUIT DIAM. 25 MM
Tubazione Rigida in PVC Diam. 25 mm
IT. No.
Art. n. 10b LM/ML 100
22 PVC FLEXIBLE CONDUIT DIAM. 25 MM
Tubazione Flesibile in PVC Diam. 25 mm
IT. No.
Art. n. 11 LM/ML 70
23 JUNCTION BOX 80X80X40 MM
Scatola di Derivazione 80x80x40 mm
IT. No.
Art. n. 12 LM/ML 77
24 F/A programmation Programmazione quadro F/A
IT. No.
Art. n. 13 LS/AC 1
Total Fire Alarm System - Totale Impianto Allarme Incendio
TOTAL PART IV - Totale Parte IV
PART III - MECHANICAL WORK
TOTAL PRICE / Costo Totale
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART IV - ELECTRICAL WORK
FOR OFFICIAL USE ONLY Sheet 6 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 416
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 AREA C, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche
REMOVAL OF EXISTING FANCOIL UNIT, MECHANICAL &
ELECTRICAL CONNECTIONS AND FITTINGS
Rimozione del ventilconvettore esistente, connessioni meccaniche ed elettriche ed accessori
IT. No.
Art. n. 1 LS/AC 8.00
REMOVAL OF DX UNIT, MECHANICAL & ELECTRICAL
CONNECTIONS AND FITTINGS
Rimozione dell'unità ad espansione diretta, connessioni meccaniche ed elettriche ed accessori
IT. No.
Art. n. 2 LS/AC 1.00
Total Mechanical - Totale Meccanico
Ic Electrical Demolitions - Ie Demolizioni Elettriche
3 REMOVE F/A SYSTEM
Rimozione Impianto Allarme Incendio
IT. No.
Art. n. 3 LS/AC 1.00
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I
BLDG 416 (NO CHANGE)
FOR OFFICIAL USE ONLY Sheet 7 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 416
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 AREA C, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
REMOVAL AND REINSTALLATION OF SUSPENDED CEILING
PANELS
Rimozione e reinstallazione pannelli contrrosoffitto
IT. No.
Art. n. 1 LS/AC 1.00
5 PREPAINTED GALVANIZED STEEL PIPING COVER
Carter in accio zincato preverniciatpo per protezione tubi
IT. No.
Art. n. 2 EA/NO 8.00
FOR OFFICIAL USE ONLY Sheet 8 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 416
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 AREA C, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING
MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY
ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF
VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.
FCV-01
Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-01
IT. No.
Art. n. 1a EA/NO 2.00
NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING
MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY
ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF
VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.
FCV-02
Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-02
IT. No.
Art. n. 1b EA/NO 1.00
NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING
MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY
ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF
VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.
FCV-03
Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-03
IT. No.
Art. n. 1c EA/NO 5.00
9 SYSTEM BALANCING AND TECHNICAL TEST REPORT
bilanciamento del sistema e redazione report
IT. No.
Art. n. 3 LS/AC 1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici
Fire Alarm System systems - Impianto Allarme Incedio
FOR OFFICIAL USE ONLY Sheet 9 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 416
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 AREA C, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
10 SMOKE DETECTORS
Rilevatori di fumo
IT. No.
Art. n. 1 EA/NO 28
11 HEAT DETECTORS
Rilevarori di Calore
IT. No.
Art. n. 2 EA/NO 8
12 RED PILOT LIGHT
Lampada spia rossa
IT. No.
Art. n. 3 EA/NO 18
13 PULL STATIONS
Stazioni manuali
IT. No.
Art. n. 4 EA/NO 8
14 Audio/video devices Dispositivi audio/video
IT. No.
Art. n. 5 EA/NO 8
15 CONVENTIONAL FIRE ALARM CONTROL PANEL
Centrale Rivelazione Incendi Convenzionale
IT. No.
Art. n. 6 EA/NO 1
16 FTE40HM1 2X1,5 MMQ CABLE
Cavo FTE40HM1 2X1,5 mmq
IT. No.
Art. n. 7 LM/ML 170
17 METAL CABLE TRAY 100x100 MM Canalina Metallica 100x100 mm
IT. No.
Art. n. 8 LM/ML 40
18 PVC RIGID CONDUIT DIAM. 40 MM
Tubazione Rigida in PVC Diam. 40 mm
IT. No.
Art. n. 9a LM/ML 35
19 PVC RIGID CONDUIT DIAM. 25 MM
Tubazione Rigida in PVC Diam. 25 mm
IT. No.
Art. n. 9b LM/ML 55
20 PVC FLEXIBLE CONDUIT DIAM. 25 MM
Tubazione Flesibile in PVC Diam. 25 mm
IT. No.
Art. n. 10 LM/ML 45
21 JUNCTION BOX 80X80X40 MM
Scatola di Derivazione 80x80x40 mm
IT. No.
Art. n. 11 LM/ML 42
22 F/A programmation Programmazione quadro F/A
IT. No.
Art. n. 12 LS/AC 1
Total Fire Alarm System - Totale Impianto Allarme Incendio
TOTAL PART IV - Totale Parte IV
FOR OFFICIAL USE ONLY Sheet 10 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 416
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 AREA C, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
TOTAL PRICE / Costo Totale
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
FOR OFFICIAL USE ONLY Sheet 11 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 907 REV1
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche
REMOVAL OF EXISTING AIR HANDLING UNIT AHU-01,
INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS,
ACTUTATORS, SENSORS, DDC UNIT AND FITTINGS.
Rimozione dell'unità di trattamento aria esistente AHU-01, comprese le connessioni meccaniche ed elettriche, attuatori, sensori, unità DDC e accessori
IT. No.
Art. n. 1 LS/AC 1.00
REMOVAL OF EXISTING MINI AIR HANDLING UNIT
INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS,
THERMOSTAT, CONTROL VALVES AND FITTINGS
Rimozione della mini UTA esistente comprensiva di connessioni meccaniche ed elettriche, termostato, valvole di regolazione ed accessori
IT. No.
Art. n. 2 LS/AC 4.00
TEMPORARY REMOVAL AND RELOCATE OF EXISTING
WATER TREATMENT SYSTEM TO ALLOW NEW AHU
INSTALL.
Rimozione temporanea e riposizionamento dell'esistente sistema di trattametno acqua per consentire l'installazione della nuova
AHU
IT. No.
Art. n. 3 LS/AC 1.00
4 REMOVAL OF N°2 EXISTING AHU-02 HUMIDIFIER
Rimozione di n°2 umidificatore esistenti a servizio AHU-02
IT. No.
Art. n. 4 LS/AC 1.00
REMOVAL OF EXISTING CHILLER UNIT, MECHANICAL AND
ELECTRICAL CONNECTION AND FITTINGS
Rimozione del chiller esistente, connessioni meccaniche ed elettriche ed accessori
IT. No.
Art. n. 5 LS/AC 1.00
REMOVAL OF EXISTING CARRIER UNIT, MECHANICAL AND
ELECTRICAL CONNECTION AND FITTINGS
Rimozione del CARRIER esistente, connessioni meccaniche ed elettriche ed accessori
IT. No.
Art. n. 6 LS/AC 1.00
Total Mechanical - Totale Meccanico
Ic Electrical Demolitions - Ie Demolizioni Elettriche
Not Applicable/Non applicabile
BLDG 907 (CHANGE)
FOR OFFICIAL USE ONLY Sheet 12 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 907 REV1
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
REMOVAL AND REINSTALLATION OF SUSPENDED CEILING
PANELS
Rimozione e reinstallazione pannelli contrrosoffitto
IT. No.
Art. n. 1 LS/AC 1.00
FOR OFFICIAL USE ONLY Sheet 13 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 907 REV1
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
NEW AHU-01 INCLUDING MECHANICAL AND ELECTRICAL
CONNECTIONS, CONTROL AND SHUT OFF VALVES, PIPING
AND DUCTWORK FURNISHING AND ADJUSTMENT AND
FITTINGS
Nuova unità di trattamento aria AHU-01 comprensiva di connessioni meccaniche ed elettriche, valvole di regolazione e intercettazione, modifica e fornitura tubazioni e canalizzazioni e accessori
IT. No.
Art. n. 1 EA/NO 1.00
NEW DDC UNIT INCLUDING CONTROLLED POINTS AND
FIELD ELEMENTS, WIRING, PROGRAMMING, CONTROL
PANEL AND FITTINGS. REUSE AND REPROGRAM EXISTING
DDC UNIT FOR CONTROL OF AHU-02. CANCELED
IT. No.
Art. n. 2
NEW MINI AIR HANDLING UNIT INCLUDING MECHANICAL
AND ELECTRICAL CONNECTIONS, FRESH AIR INTAKE
GRILLE WITH G3 FILTER, BRACKETS, ROOM PANEL, 3 WAY
CONTROL VALVES, SILENCER, DUCTWORK ADJUSTMENT
AND FITTINGS. AHUM-01
Nuova mini unità di trattamento aria comprensiva di connessioni meccaniche ed elettriche, griglia di presa aria esterna con filtro G3, staffaggi, pannello ambiente, valvole di controllo a 3 vie, silenziatore, modifica canalizzazione e accessori. AHUM-01
IT. No.
Art. n. 3a EA/NO 1.00
NEW MINI AIR HANDLING UNIT INCLUDING MECHANICAL
AND ELECTRICAL CONNECTIONS, FRESH AIR INTAKE
GRILLE WITH G3 FILTER, BRACKETS, ROOM PANEL, 3 WAY
CONTROL VALVES, SILENCER, DUCTWORK ADJUSTMENT
AND FITTINGS. AHUM-03
Nuova mini unità di trattamento aria comprensiva di connessioni meccaniche ed elettriche, griglia di presa aria esterna con filtro G3, staffaggi, pannello ambiente, valvole di controllo a 3 vie, silenziatore, modifica canalizzazione e accessori. AHUM-03
IT. No.
Art. n. 3b EA/NO 1.00
NEW MINI AIR HANDLING UNIT INCLUDING MECHANICAL
AND ELECTRICAL CONNECTIONS, FRESH AIR INTAKE
GRILLE WITH G3 FILTER, BRACKETS, ROOM PANEL, 3 WAY
CONTROL VALVES, SILENCER, DUCTWORK ADJUSTMENT
AND FITTINGS. AHUM-04
Nuova mini unità di trattamento aria comprensiva di connessioni meccaniche ed elettriche, griglia di presa aria esterna con filtro G3, staffaggi, pannello ambiente, valvole di controllo a 3 vie, silenziatore, modifica canalizzazione e accessori. AHUM-04
IT. No.
Art. n. 3c EA/NO 1.00
FOR OFFICIAL USE ONLY Sheet 14 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 907 REV1
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
NEW MINI AIR HANDLING UNIT INCLUDING MECHANICAL
AND ELECTRICAL CONNECTIONS, BRACKETS, ROOM
PANEL, 3 WAY CONTROL VALVES, SILENCER, DUCTWORK
ADJUSTMENT AND FITTINGS. AHUM-02
Nuova mini unità di trattamento aria comprensiva di connessioni meccaniche ed elettriche, staffaggi, pannello ambiente, valvole di controllo a 3 vie, silenziatore, modifica canalizzazione e accessori.
AHUM-02
IT. No.
Art. n. 3d EA/NO 1.00
NEW BLUEBOX CHILLER UNIT WITH HYDRONIC MODULE
INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS
AND FITTINGS
Nuovo refrigeratore BLUEBOX e con modulo idronico comprensivo di connessioni meccaniche ed elettriche e accessori
IT. No.
Art. n. 4 LS/AC 1.00
NEW BLUEBOX CHILLER UNIT 205 KW, WITH HYDRONIC
MODULE INCLUDING MECHANICAL AND ELECTRICAL
CONNECTIONS AND FITTINGS
Nuovo refrigeratore BLUEBOX 205 kw e con modulo idronico comprensivo di connessioni meccaniche ed elettriche e accessori
IT. No.
Art. n. 5 LS/AC 1.00
14 NEW HUMIDIFIER FOR AHU-02
Nuovo umidificatore per AHU-2
IT. No.
Art. n. 6 LS/AC 1.00
15 SYSTEM BALANCING AND TECHNICAL TEST REPORT
bilanciamento del sistema e redazione report
IT. No.
Art. n. 7 LS/AC 1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III
FOR OFFICIAL USE ONLY Sheet 15 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 907 REV1
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
TOTAL PRICE / Costo Totale
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
FOR OFFICIAL USE ONLY Sheet 16 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1013 (NO CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche
REMOVAL OF EXISTING FANCOIL UNIT, MECHANICAL &
ELECTRICAL CONNECTIONS AND FITTINGS
Rimozione del ventilconvettore esistente, connessioni meccaniche ed elettriche ed accessori
IT. No.
Art. n. 1 LS/AC 4.00
REMOVAL OF EXISTING BURIED HOT WATER PIPES INSIDE
THE BUILDING
Rimozione delle tubazioni esistenti acqua calda all'interno del fabbricato
IT. No.
Art. n. 2 LS/AC 1.00
REMOVAL OF EXISTING BURIED HOT WATER PIPES FROM
BOILER ROOM FEEDING FANCOIL UNITS
Rimozione delle tubazioni esistenti interrate di acqua calda dalla centrale termica alimentanti i ventilconvettori
IT. No.
Art. n. 3 LS/AC 1.00
REMOVAL OF DX UNIT, MECHANICAL & ELECTRICAL
CONNECTIONS AND FITTINGS
Rimozione dell'unità ad espansione diretta, connessioni meccaniche ed elettriche ed accessori
IT. No.
Art. n. 4 EA/NO 2.00
Total Mechanical - Totale Meccanico
Ic Electrical Demolitions - Ie Demolizioni Elettriche
5 REMOVE F/A SYSTEM
Rimozione Impianto Allarme Incendio
IT. No.
Art. n. 5 LS/AC 1.00
Total Electrical - Totale Elettrico
BLDG 1013
FOR OFFICIAL USE ONLY Sheet 17 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1013 (NO CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
REMOVAL AND REINSTALLATION OF SUSPENDED CEILING
PANELS
Rimozione e reinstallazione pannelli contrrosoffitto
IT. No.
Art. n. 1 LS/AC 1.00
7 PREPAINTED GALVANIZED STEEL PIPING COVER
Carter in accio zincato preverniciatpo per protezione tubi
IT. No.
Art. n. 2 EA/NO 4.00
8 NEW CONCRETE PAD
Nuovo basamento in calcestruzzo
IT. No.
Art. n. 3 LS/AC 1.00
9 UTILITY TRENCHES
Trincee sottoservizi
IT. No.
Art. n. 4 LS/AC 1.00
FOR OFFICIAL USE ONLY Sheet 18 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1013 (NO CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
NEW BURIED PIPES FROM BOILER ROOM FEEDING NEW
FANCOIL UNITS INCLUDING BACKFILLING
Nuove tubazioni interrate di acqua calda dalla centrale termica alimentanti i nuovi ventilconvettori compreso il rinterro
IT. No.
Art. n. 1 LS/AC 1.00
FURNISHING AND INSTALLATION OF NEW BLUEBOX
CHILLER UNIT CH-01 INCLUDING EXPANSION TANK,
INERTIAL TANK AND FITTINGS
Fornitura e posa in opera di nuovo refrigeratore BLUEBOX CH-01 comprensivo di vaso di espansione, serbatoio inerziale e accessori
IT. No.
Art. n. 2 LS/AC 1.00
NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING
MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY
ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF
VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.
FCV-01
Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-01
IT. No.
Art. n. 3a EA/NO 4.00
NEW CHILLED WATER PIPING FEEDING NEW FANCOIL
UNITS
Nuova tubazione acqua refrigerata per alimentazione nuovi ventilconvettori
IT. No.
Art. n. 4 LS/AC 1.00
14 NEW CONDENSATE DRAIN PIPING
Nuove linea di scarico condensa
IT. No.
Art. n. 5 LS/AC 1.00
15 NEW MAKE UP WATER LINE
Nuova linea di reintegro
IT. No.
Art. n. 6 LS/AC 1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III
Power System - Impianto Forza Motrice
FOR OFFICIAL USE ONLY Sheet 19 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1013 (NO CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
RES. CURR. MAGNETOT. CIRCUIT BREAKER AND FEEDING
LINE FG16OM16 3G4 MMQ CABLE FOR NEW CHILLER
Interruttore magnetot.diff.e linea di alimentazione con cavo FG16OM16 3G4 mmq del nuovo refrigeratore
IT. No.
Art. n. 1 LS/AC 1
Total Power System - Totale Impianto Forza Motrice
Fire Alarm System systems - Impianto Allarme Incedio
17 SMOKE DETECTORS
Rilevatori di fumo
IT. No.
Art. n. 2 EA/NO 9
18 RED PILOT LIGHT
Lampada spia rossa
IT. No.
Art. n. 3 EA/NO 5
19 PULL STATIONS
Stazioni manuali
IT. No.
Art. n. 4 EA/NO 2
20 Audio/video devices Dispositivi audio/video
IT. No.
Art. n. 5 EA/NO 2
21 ALARM BELL
Campana di allarme
IT. No.
Art. n. 6 EA/NO 1
22 CONVENTIONAL FIRE ALARM CONTROL PANEL
Centrale Rivelazione Incendi Convenzionale
IT. No.
Art. n. 7 EA/NO 1
23 FTE40HM1 2X1,5 MMQ CABLE
Cavo FTE40HM1 2X1,5 mmq
IT. No.
Art. n. 8 LM/ML 60
24 METAL CABLE TRAY 100x100 MM Canalina Metallica 100x100 mm
IT. No.
Art. n. 9 LM/ML 15
25 PVC RIGID CONDUIT DIAM. 40 MM
Tubazione Rigida in PVC Diam. 40 mm
IT. No.
Art. n. 10a LM/ML 15
26 PVC RIGID CONDUIT DIAM. 25 MM
Tubazione Rigida in PVC Diam. 25 mm
IT. No.
Art. n. 10b LM/ML 15
27 PVC FLEXIBLE CONDUIT DIAM. 25 MM
Tubazione Flesibile in PVC Diam. 25 mm
IT. No.
Art. n. 11 LM/ML 5
28 JUNCTION BOX 80X80X40 MM
Scatola di Derivazione 80x80x40 mm
IT. No.
Art. n. 12 LM/ML 11
29 F/A programmation Programmazione quadro F/A
IT. No.
Art. n. 13 LS/AC 1
FOR OFFICIAL USE ONLY Sheet 20 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1013 (NO CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
TOTAL PRICE / Costo Totale
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
FOR OFFICIAL USE ONLY Sheet 21 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1405 CANCELED
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
FOR OFFICIAL USE ONLY Sheet 22 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1407
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
1 REMOVAL OF WATERPROOFING MEMBRANE
Rimozione dui guaina impermeabilizzante
IT. No.
Art. n. 1 SM/MQ 81.60
Total Architectural - Totale Architettura
Ib Mechanical Demolitions - Demolizioni Meccaniche
REMOVAL OF EXISTING AIR HANDLING UNIT, INCLUDING
MECHANICAL AND ELECTRICAL CONNECTIONS,
DUCTWORK, ACTUTATORS, SENSORS, DDC UNIT AND
FITTINGS
Rimozione dell'esistente unità di trattamento aria esistente, comprese le connessioni meccaniche ed elettriche, canalizzazioni, attuatori, sensori, unità DDC e accessori
IT. No.
Art. n. 2 LS/AC 1.00
REMOVAL OF EXISTING HOT/CHILLED WATER PIPING,
CONTROL AND SHUTOFF VALVES AND FITTINGS
Rimozione delle tubazioni esistenti di acqua calda/refrigerata, valvole di controllo e regolazione e accessori
IT. No.
Art. n. 3 LS/AC 1.00
REMOVAL AND RELOCATION OF EXISTING DX CONDENSING
UNIT FOOR MOUNTED
Rimozione e riposizionamento di unità condensante DX installata a pavimento
IT. No.
Art. n. 4 LS/AC 1.00
REMOVAL AND RELOCATION OF EXISTING DX CONDENSING
UNIT WALL MOUNTED
Rimozione e riposizionamento di unità condensante DX installata a parete
IT. No.
Art. n. 5 LS/AC 1.00
Total Mechanical - Totale Meccanico
Ic Electrical Demolitions - Ie Demolizioni Elettriche
Not Applicable/Non applicabile
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
BLDG 1407 (NO CHANGE)
FOR OFFICIAL USE ONLY Sheet 23 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1407
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
IIa Architectural - IIa Architettonico
6 NEW WATERPROOFING MEMBRANE
Nuova Guaina Impermeabilizzante
IT. No.
Art. n. 1 SM/MQ 81.60
7 ROOF REPAIR
Ripristino copertura
IT. No.
Art. n. 2 LS/AC 1.00
8 PROTECTIVE CASES/FLASHINGS
Scossasline e involucri di protezione
IT. No.
Art. n. 3 LS/AC 1.00
FOR OFFICIAL USE ONLY Sheet 24 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1407
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
COMPLETE REPLACEMENT OD DAMAGED PIPEWORK AND
DEVICES IN MECH ROOM
Sostituzione delle tubazioni e dispositivi danneggiati all'interno del locale meccanico
IT. No.
Art. n. 1 LS/AC 1.00
NEW CHEMICAL POT FEEDER AND DIRT/SLUDGE
SEPARATOR CPF-1
Nuovo filtro a masse chiarificatore e defangatore CPF-1
IT. No.
Art. n. 2 EA/NO 1.00
NEW ENERGY RECOVERY UNIT AHU-01 INCLUDING
MECHANICAL AND ELECTRICAL CONNECTIONS, NEW
DUCTWORK, 3-WAY CONTROL VALVE AND FITTINGS
Nuovo recuperatore AHU-01 comprensivo di connessioni meccaniche ed elettriche, nuova canalizzazione, valvola di controllo a 3 vie e accessori
IT. No.
Art. n. 3 EA/NO 1.00
NEW AHU-02 INCLUDING MECHANICAL AND ELECTRICAL
CONNECTIONS, NEW DUCTWORK, SENSORS AND FIELD
ELEMENTS, 3 WAY CONTROL VALVE AND FITTINGS
Nuova unità di trattamento aria AHU-02 comprensiva di connessioni meccaniche ed elettriche, nuove canalizzazioni, sensori ed elementi in campo, valvola di controllo a 3 vie e accessori
IT. No.
Art. n. 4 EA/NO 1.00
13 NEW DDC-1
Nuovo DDC-1
IT. No.
Art. n. 5 LS/AC 1.00
NEW HOT/CHILLED WATER PIPING INCLUDING BRACKETS,
SHUTOFF VALVES, INSULATION, ALUMINUM COVER AND
FITTINGS
Nuova tubazione di acqua calda/refrigerata compresi gli staffaggi, valvole di intercettazione, isolamento e lamierino e accessori
IT. No.
Art. n. 6 LS/AC 1.00
15 SYSTEM BALANCING AND TECHNICAL TEST REPORT
bilanciamento del sistema e redazione report
IT. No.
Art. n. 7 LS/AC 1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III
FOR OFFICIAL USE ONLY Sheet 25 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1407
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Power System - Impianto Forza Motrice
RES. CURR. MAGNETOT. CIRCUIT BREAKER FOR NEW AHU
FAN
Interruttore magnetot.diff. per ventilatore nuova UTA
IT. No.
Art. n. 1 EA/NO 1
Total Power System - Totale Impianto Forza Motrice
TOTAL PART IV - Totale Parte IV
TOTAL PRICE / Costo Totale
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
FOR OFFICIAL USE ONLY Sheet 26 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1434
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche
REMOVAL OF EXISTING CHILLER UNIT CANCELED,
work performed by CE personell
IT. No.
Art. n. 1
2 REMOVAL OF EXISTING CIRCULATING PUMP AND FITTINGS
Rimozione della pompa di circolazione esistente ed accessori
IT. No.
Art. n. 2 LS/AC 1.00
3 TEMPORARY REMOVAL OF EXISTING INERTIAL TANK IT-01
Rimozione temporanea del serbatoio inerziale esistente IT-01
IT. No.
Art. n. 3 LS/AC 1.00
REMOVAL OF EXISTING 3-WAY CONTROL VALVES OF AHU-
01 AND AHU-02 AT THE ATTIC LEVEL
Rimozione delle valvole di regolazione a tre vie delle AHU-01 ed AHU-02 installate nel sottotetto
IT. No.
Art. n. 4 LS/AC 1.00
Total Mechanical - Totale Meccanico
Ic Electrical Demolitions - Ie Demolizioni Elettriche
Not Applicable/Non applicabile
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
BLDG 1434 (CHANGE)
FOR OFFICIAL USE ONLY Sheet 27 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1434
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
IIa Architectural - IIa Architettonico
REMOVAL AND REINSTALLATION OF SUSPENDED CEILING
PANELS
Rimozione e reinstallazione pannelli contrrosoffitto
IT. No.
Art. n. 1 LS/AC 1.00
FOR OFFICIAL USE ONLY Sheet 28 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1434
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
REMOVAL OF EXISTING CHILLER UNIT CANCELED,
work performed by CE personell
IT. No.
Art. n. 1
RE-INSTALLATION IN NEW POSITION OF EXISTING INERTIAL
TANK IT-01
Re-installazione in nuova posizione del serbatoio inerziale esistente IT-01
IT. No.
Art. n. 2 EA/NO 1.00
8 NEW CHILLED WATER PIPING
Nuove tubazioni acqua refrigerata
IT. No.
Art. n. 3 LS/AC 1.00
9 SYSTEM BALANCING AND TECHNICAL TEST REPORT
bilanciamento del sistema e redazione report
IT. No.
Art. n. 4 LS/AC 1.00
NEW CHECK VALVES AND BALL VALVES IN MECH ROOM
WITH PIPING ADJUSTMENT
Nuove valvole di ritegno e valvole a sfera nelal centrale meccanica con adeguamento tubazioni
IT. No.
Art. n. 5 LS/AC 1.00
11 PROVIDE COMPLETE REVISION OF AHUs Provvedere alla completa revisione delle UTA
IT. No.
Art. n. 6 LS/AC 1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III
FOR OFFICIAL USE ONLY Sheet 29 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1434
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
TOTAL PRICE / Costo Totale
OR US DOLLARS (RATE 1$ = 0,8582 €)
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
FOR OFFICIAL USE ONLY Sheet 30 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1483 (CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche
REMOVAL OF EXISTING CHILLER UNIT, MECHANICAL AND
ELECTRICAL CONNECTION AND FITTINGS
Rimozione del chiller esistente, connessioni meccaniche ed elettriche ed accessori
IT. No.
Art. n. 1 LS/AC 1.00
Total Mechanical - Totale Meccanico
Ic Electrical Demolitions - Ie Demolizioni Elettriche
Not Applicable/Non applicabile
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
BLDG 1483
FOR OFFICIAL USE ONLY Sheet 31 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1483 (CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
IIa Architectural - IIa Architettonico
FOR OFFICIAL USE ONLY Sheet 32 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1483 (CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
ONLY INSTALLATION. CHILLER UNIT BLUEBOX, INCLUDING
MECHANICAL AND ELECTRICAL CONNECTIONS, PIPING
WITH INSULATION, ANTI VIBRATING JOINTS, CHECK AND
SHUTOFF VALVE AND FITTINGS
sola installazione chiller comprensivo di connessioni meccaniche ed elettriche, tubazione con isolamento, giunti antivibranti, valvole di ritegno e intercettazione e accessori
IT. No.
Art. n. 1
2 NEW INERTIAL TANK
Nuovo serbatoio inerziale
IT. No.
Art. n. 2 EA/NO 1.00
3 NEW CHILLED WATER PIPING
Nuove tubazioni acqua refrigerata
IT. No.
Art. n. 3 LS/AC 1.00
4 SYSTEM BALANCING AND TECHNICAL TEST REPORT
bilanciamento del sistema e redazione report
IT. No.
Art. n. 4 LS/AC 1.00
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III
FOR OFFICIAL USE ONLY Sheet 33 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1483 (CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Not Applicable/Non applicabile
TOTAL PRICE / Costo Totale
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
FOR OFFICIAL USE ONLY Sheet 34 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 10462 (CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not Applicable/Non applicabile
Ib Mechanical Demolitions - Demolizioni Meccaniche
REMOVAL OF EXISTING DUCTED DX UNIT AND EXTERNAL
UNIT CANCELED Rimozione dell'unità ad espansione diretta canalizzata esistente e la relativa unità esterna
CANCELLATO
IT. No.
Art. n. 1
Total Mechanical - Totale Meccanico
Ic Electrical Demolitions - Ie Demolizioni Elettriche
2 REMOVE F/A SYSTEM
Rimozione Impianto Allarme Incendio
IT. No.
Art. n. 2 LS/AC 1.00
Total Electrical - Totale Elettrico
BLDG 10462
FOR OFFICIAL USE ONLY Sheet 35 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 10462 (CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
REMOVAL AND REINSTALLATION OF SUSPENDED CEILING
PANELS
Rimozione e reinstallazione pannelli contrrosoffitto
IT. No.
Art. n. 1 LS/AC 1.00
FOR OFFICIAL USE ONLY Sheet 36 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 10462 (CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
CANCELED PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
4 CANCELED FURNISHING AND INSTALLATION OF NEW
CHILLER UNIT CH-01
IT. No.
Art. n. 1
5 CANCELED. NEW MINI AIR HANDLING UNIT
IT. No.
Art. n. 2
Total Mechanical - Totale Meccanico
TOTAL PART III - Totale Parte III
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici
Power System - Impianto Forza Motrice
RES. CURR. MAGNETOT. CIRCUIT BREAKER AND FEEDING
LINE FG16OM16 5G4 MMQ CABLE FOR NEW CHILLER
Interruttore magnetot.diff.e linea di alimentazione con cavo FG16OM16 5G4 mmq del nuovo refrigeratore
IT. No.
Art. n. 1 LS/AC 1
Total Power System - Totale Impianto Forza Motrice
Fire Alarm System systems - Impianto Allarme Incedio
FOR OFFICIAL USE ONLY Sheet 37 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 10462 (CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
7 SMOKE DETECTORS
Rilevatori di fumo
IT. No.
Art. n. 2 EA/NO 13
8 HEAT DETECTORS
Rilevarori di Calore
IT. No.
Art. n. 3 EA/NO 3
8 RED PILOT LIGHT
Lampada spia rossa
IT. No.
Art. n. 4 EA/NO 7
9 PULL STATIONS
Stazioni manuali
IT. No.
Art. n. 5 EA/NO 5
10 Audio/video devices Dispositivi audio/video
IT. No.
Art. n. 6 EA/NO 5
11 CONVENTIONAL FIRE ALARM CONTROL PANEL
Centrale Rivelazione Incendi Convenzionale
IT. No.
Art. n. 7 EA/NO 1
12 FTE40HM1 2X1,5 MMQ CABLE
Cavo FTE40HM1 2X1,5 mmq
IT. No.
Art. n. 8 LM/ML 60
13 PVC RIGID CONDUIT DIAM. 40 MM
Tubazione Rigida in PVC Diam. 40 mm
IT. No.
Art. n. 9a LM/ML 25
14 PVC RIGID CONDUIT DIAM. 25 MM
Tubazione Rigida in PVC Diam. 25 mm
IT. No.
Art. n. 9b LM/ML 50
15 PVC FLEXIBLE CONDUIT DIAM. 25 MM
Tubazione Flesibile in PVC Diam. 25 mm
IT. No.
Art. n. 10 LM/ML 10
16 JUNCTION BOX 80X80X40 MM
Scatola di Derivazione 80x80x40 mm
IT. No.
Art. n. 11 LM/ML 24
17 F/A programmation Programmazione quadro F/A
IT. No.
Art. n. 12 LS/AC 1
FOR OFFICIAL USE ONLY Sheet 38 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 10462 (CHANGE)
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
TOTAL PRICE / Costo Totale
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
FOR OFFICIAL USE ONLY Sheet 39 of 40
CONTRACTOR COST ESTIMATE BREAKDOWN REV1
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
DESIGN FOR SUSTAIN HVAC SYSTEM MULTI
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1087 REV1 AREA C - AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 BUILDING 410 - SHOPS
2 BUILDING 416 - WOOD CARPENTRY SHOP
3 BUILDING 907 - P.MEL LABORATORY
4 BUILDING 1013 - PETROL OPS
5 BUILDING 1405 - GYM CANCELED
6 BUILDING 1407 - SHOPPETTE
7 BUILDING 1434 - FIRE BRIGADE
8 BUILDING 1483 - TLF
9 BUILDING 10462 - BCE
BUILDING SUMMARY / Riepologo per Fabbricati
TOTAL PRICE / Costo Totale
ASHE 18-1087- DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - AREA F AND AREA C, AVIANO AB, REV1
INSTRUCTIONS FOR COMPLETING AF FORM 3052
TOTAL MATERIAL COSTS €
TOTAL LABOR COSTS €
TOTAL OTHER DIRECT COSTS €
TOTAL DIRECT COSTS €
OVERHEAD % €
SUBTOTAL €
PROFIT % €
TOTAL PRICE €
DATE FIRM NAME
TITLE BY
INSTRUCTIONS TO OFFERORS
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.
Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment…