ASHE 181087 CCEB REV1 BLANK.pdf

PDF 267 KB Posted

Attached to
ASHE 18-1087 SUSTAIN HVAC SYSTEM MULTI, AREA F AND C, AVIANO AIR BASE, ITALY
Solicitation number
FA568220R0003
Issued by

About this file

This is a solicitation for the ASHE 18-1087 SUSTAIN HVAC SYSTEM MULTI project at Aviano Air Base in Italy. The project involves renovating and upgrading HVAC systems across multiple buildings in Areas F and C of the base. Work includes demolitions, mechanical and electrical installations and upgrades, architectural repairs, and balancing of new systems. Estimated value is between $500,000 to $1 million. Interested vendors must hold a current System for Award Management registration and Site Organization Authorization certification in category OG11. A site visit will be scheduled for interested firms. Proposals are due by the date specified in the solicitation. The work will be performed under host nation laws and the contract will be awarded on a lump sum basis.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Sheet 1 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN HVAC SYSTEM MULTI - BLDG 410 REV1

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA C, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ia Architectural Demolition - Ia Demolizioni Architettoniche

Not Applicable/Non applicabile

Ib Mechanical Demolitions - Demolizioni Meccaniche

REMOVAL OF EXISTING VERTICAL CABINET FANCOIL UNIT,

MECHANICAL & ELECTRICAL CONNECTIONS AND FITTINGS

Rimozione del ventilconvettore a mobiletto esistente, connessioni meccaniche ed elettriche ed accessori

IT. No.

Art. n. 1 LS/AC 11.00

REMOVAL OF EXISTING 4 WAY CASSETTE FANCOIL UNIT,

MECHANICAL & ELECTRICAL CONNECTIONS AND FITTINGS

Rimozione del ventilconvettore a cassetta a 4 vie esistente, connessioni meccaniche ed elettriche ed accessori

IT. No.

Art. n. 2 LS/AC 1.00

Total Mechanical - Totale Meccanico

Ic Electrical Demolitions - Ie Demolizioni Elettriche

3 REMOVE F/A SYSTEM

Rimozione Impianto Allarme Incendio

IT. No.

Art. n. 3 LS/AC 1.00

Total Electrical - Totale Elettrico

TOTAL PART I / Totale Parte I

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili

IIa Architectural - IIa Architettonico

REMOVAL AND REINSTALLATION OF SUSPENDED CEILING

PANELS

Rimozione e reinstallazione pannelli contrrosoffitto

IT. No.

Art. n. 1 LS/AC 1.00

5 PREPAINTED GALVANIZED STEEL PIPING COVER

Carter in accio zincato preverniciatpo per protezione tubi

IT. No.

Art. n. 2 EA/NO 11.00

Total Architectural - Totale Architettura

BLDG 410 (NO CHANGE)

FOR OFFICIAL USE ONLY Sheet 2 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN HVAC SYSTEM MULTI - BLDG 410 REV1

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA C, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

TOTAL PART II / Totale Parte II

FOR OFFICIAL USE ONLY Sheet 3 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN HVAC SYSTEM MULTI - BLDG 410 REV1

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA C, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici

NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING

MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY

ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF

VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-01

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-01

IT. No.

Art. n. 1a EA/NO 4.00

NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING

MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY

ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF

VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-02

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-02

IT. No.

Art. n. 1b EA/NO 3.00

NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING

MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY

ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF

VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-03

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-03

IT. No.

Art. n. 1c EA/NO 4.00

NEW 4 WAY CASSETTE ECM FANCOIL UNIT INCLUDING

MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY

ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF

VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCC-01

Nuovo ventilconvettore a cessetta ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori.FCC-01

IT. No.

Art. n. 2 EA/NO 1.00

10 SYSTEM BALANCING AND TECHNICAL TEST REPORT

bilanciamento del sistema e redazione report

IT. No.

Art. n. 3 LS/AC 1.00

Total Mechanical - Totale Meccanico

FOR OFFICIAL USE ONLY Sheet 4 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN HVAC SYSTEM MULTI - BLDG 410 REV1

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA C, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

TOTAL PART III - Totale Parte III

PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici

Fire Alarm System systems - Impianto Allarme Incedio

11 SMOKE DETECTORS

Rilevatori di fumo

IT. No.

Art. n. 1 EA/NO 40

12 HEAT DETECTORS

Rilevarori di Calore

IT. No.

Art. n. 2 EA/NO 25

13 RED PILOT LIGHT

Lampada spia rossa

IT. No.

Art. n. 3 EA/NO 30

14 PULL STATIONS

Stazioni manuali

IT. No.

Art. n. 4 EA/NO 20

FOR OFFICIAL USE ONLY Sheet 5 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

SUSTAIN HVAC SYSTEM MULTI - BLDG 410 REV1

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA C, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

15 Audio/video devices Dispositivi audio/video

IT. No.

Art. n. 5 EA/NO 18

16 ADDREASSABLE FIRE ALARM CONTROL PANEL

Centrale rivelazione incendi indirizzabile

IT. No.

Art. n. 6 EA/NO 1

17 ALARM BELL

Campana di allarme

IT. No.

Art. n. 7 EA/NO 1

18 FTE40HM1 2X2,5 MMQ CABLE

Cavo FTE40HM1 2X2,5 mmq

IT. No.

Art. n. 8 LM/ML 430

19 METAL CABLE TRAY 100x100 MM Canalina Metallica 100x100 mm

IT. No.

Art. n. 9 LM/ML 200

20 PVC RIGID CONDUIT DIAM. 40 MM

Tubazione Rigida in PVC Diam. 40 mm

IT. No.

Art. n. 10a LM/ML 60

21 PVC RIGID CONDUIT DIAM. 25 MM

Tubazione Rigida in PVC Diam. 25 mm

IT. No.

Art. n. 10b LM/ML 100

22 PVC FLEXIBLE CONDUIT DIAM. 25 MM

Tubazione Flesibile in PVC Diam. 25 mm

IT. No.

Art. n. 11 LM/ML 70

23 JUNCTION BOX 80X80X40 MM

Scatola di Derivazione 80x80x40 mm

IT. No.

Art. n. 12 LM/ML 77

24 F/A programmation Programmazione quadro F/A

IT. No.

Art. n. 13 LS/AC 1

Total Fire Alarm System - Totale Impianto Allarme Incendio

TOTAL PART IV - Totale Parte IV

PART III - MECHANICAL WORK

TOTAL PRICE / Costo Totale

SUMMARY / Riepilogo

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

PART IV - ELECTRICAL WORK

FOR OFFICIAL USE ONLY Sheet 6 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 416

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 AREA C, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ia Architectural Demolition - Ia Demolizioni Architettoniche

Not Applicable/Non applicabile

Ib Mechanical Demolitions - Demolizioni Meccaniche

REMOVAL OF EXISTING FANCOIL UNIT, MECHANICAL &

ELECTRICAL CONNECTIONS AND FITTINGS

Rimozione del ventilconvettore esistente, connessioni meccaniche ed elettriche ed accessori

IT. No.

Art. n. 1 LS/AC 8.00

REMOVAL OF DX UNIT, MECHANICAL & ELECTRICAL

CONNECTIONS AND FITTINGS

Rimozione dell'unità ad espansione diretta, connessioni meccaniche ed elettriche ed accessori

IT. No.

Art. n. 2 LS/AC 1.00

Total Mechanical - Totale Meccanico

Ic Electrical Demolitions - Ie Demolizioni Elettriche

3 REMOVE F/A SYSTEM

Rimozione Impianto Allarme Incendio

IT. No.

Art. n. 3 LS/AC 1.00

Total Electrical - Totale Elettrico

TOTAL PART I / Totale Parte I

BLDG 416 (NO CHANGE)

FOR OFFICIAL USE ONLY Sheet 7 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 416

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 AREA C, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili

IIa Architectural - IIa Architettonico

REMOVAL AND REINSTALLATION OF SUSPENDED CEILING

PANELS

Rimozione e reinstallazione pannelli contrrosoffitto

IT. No.

Art. n. 1 LS/AC 1.00

5 PREPAINTED GALVANIZED STEEL PIPING COVER

Carter in accio zincato preverniciatpo per protezione tubi

IT. No.

Art. n. 2 EA/NO 8.00

FOR OFFICIAL USE ONLY Sheet 8 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 416

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 AREA C, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici

NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING

MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY

ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF

VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-01

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-01

IT. No.

Art. n. 1a EA/NO 2.00

NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING

MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY

ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF

VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-02

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-02

IT. No.

Art. n. 1b EA/NO 1.00

NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING

MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY

ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF

VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-03

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-03

IT. No.

Art. n. 1c EA/NO 5.00

9 SYSTEM BALANCING AND TECHNICAL TEST REPORT

bilanciamento del sistema e redazione report

IT. No.

Art. n. 3 LS/AC 1.00

Total Mechanical - Totale Meccanico

TOTAL PART III - Totale Parte III

PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici

Fire Alarm System systems - Impianto Allarme Incedio

FOR OFFICIAL USE ONLY Sheet 9 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 416

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 AREA C, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

10 SMOKE DETECTORS

Rilevatori di fumo

IT. No.

Art. n. 1 EA/NO 28

11 HEAT DETECTORS

Rilevarori di Calore

IT. No.

Art. n. 2 EA/NO 8

12 RED PILOT LIGHT

Lampada spia rossa

IT. No.

Art. n. 3 EA/NO 18

13 PULL STATIONS

Stazioni manuali

IT. No.

Art. n. 4 EA/NO 8

14 Audio/video devices Dispositivi audio/video

IT. No.

Art. n. 5 EA/NO 8

15 CONVENTIONAL FIRE ALARM CONTROL PANEL

Centrale Rivelazione Incendi Convenzionale

IT. No.

Art. n. 6 EA/NO 1

16 FTE40HM1 2X1,5 MMQ CABLE

Cavo FTE40HM1 2X1,5 mmq

IT. No.

Art. n. 7 LM/ML 170

17 METAL CABLE TRAY 100x100 MM Canalina Metallica 100x100 mm

IT. No.

Art. n. 8 LM/ML 40

18 PVC RIGID CONDUIT DIAM. 40 MM

Tubazione Rigida in PVC Diam. 40 mm

IT. No.

Art. n. 9a LM/ML 35

19 PVC RIGID CONDUIT DIAM. 25 MM

Tubazione Rigida in PVC Diam. 25 mm

IT. No.

Art. n. 9b LM/ML 55

20 PVC FLEXIBLE CONDUIT DIAM. 25 MM

Tubazione Flesibile in PVC Diam. 25 mm

IT. No.

Art. n. 10 LM/ML 45

21 JUNCTION BOX 80X80X40 MM

Scatola di Derivazione 80x80x40 mm

IT. No.

Art. n. 11 LM/ML 42

22 F/A programmation Programmazione quadro F/A

IT. No.

Art. n. 12 LS/AC 1

Total Fire Alarm System - Totale Impianto Allarme Incendio

TOTAL PART IV - Totale Parte IV

FOR OFFICIAL USE ONLY Sheet 10 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 416

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 AREA C, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

TOTAL PRICE / Costo Totale

SUMMARY / Riepilogo

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

PART III - MECHANICAL WORK

FOR OFFICIAL USE ONLY Sheet 11 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 907 REV1

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ia Architectural Demolition - Ia Demolizioni Architettoniche

Not Applicable/Non applicabile

Ib Mechanical Demolitions - Demolizioni Meccaniche

REMOVAL OF EXISTING AIR HANDLING UNIT AHU-01,

INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS,

ACTUTATORS, SENSORS, DDC UNIT AND FITTINGS.

Rimozione dell'unità di trattamento aria esistente AHU-01, comprese le connessioni meccaniche ed elettriche, attuatori, sensori, unità DDC e accessori

IT. No.

Art. n. 1 LS/AC 1.00

REMOVAL OF EXISTING MINI AIR HANDLING UNIT

INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS,

THERMOSTAT, CONTROL VALVES AND FITTINGS

Rimozione della mini UTA esistente comprensiva di connessioni meccaniche ed elettriche, termostato, valvole di regolazione ed accessori

IT. No.

Art. n. 2 LS/AC 4.00

TEMPORARY REMOVAL AND RELOCATE OF EXISTING

WATER TREATMENT SYSTEM TO ALLOW NEW AHU

INSTALL.

Rimozione temporanea e riposizionamento dell'esistente sistema di trattametno acqua per consentire l'installazione della nuova

AHU

IT. No.

Art. n. 3 LS/AC 1.00

4 REMOVAL OF N°2 EXISTING AHU-02 HUMIDIFIER

Rimozione di n°2 umidificatore esistenti a servizio AHU-02

IT. No.

Art. n. 4 LS/AC 1.00

REMOVAL OF EXISTING CHILLER UNIT, MECHANICAL AND

ELECTRICAL CONNECTION AND FITTINGS

Rimozione del chiller esistente, connessioni meccaniche ed elettriche ed accessori

IT. No.

Art. n. 5 LS/AC 1.00

REMOVAL OF EXISTING CARRIER UNIT, MECHANICAL AND

ELECTRICAL CONNECTION AND FITTINGS

Rimozione del CARRIER esistente, connessioni meccaniche ed elettriche ed accessori

IT. No.

Art. n. 6 LS/AC 1.00

Total Mechanical - Totale Meccanico

Ic Electrical Demolitions - Ie Demolizioni Elettriche

Not Applicable/Non applicabile

BLDG 907 (CHANGE)

FOR OFFICIAL USE ONLY Sheet 12 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 907 REV1

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

TOTAL PART I / Totale Parte I

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili

IIa Architectural - IIa Architettonico

REMOVAL AND REINSTALLATION OF SUSPENDED CEILING

PANELS

Rimozione e reinstallazione pannelli contrrosoffitto

IT. No.

Art. n. 1 LS/AC 1.00

FOR OFFICIAL USE ONLY Sheet 13 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 907 REV1

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici

NEW AHU-01 INCLUDING MECHANICAL AND ELECTRICAL

CONNECTIONS, CONTROL AND SHUT OFF VALVES, PIPING

AND DUCTWORK FURNISHING AND ADJUSTMENT AND

FITTINGS

Nuova unità di trattamento aria AHU-01 comprensiva di connessioni meccaniche ed elettriche, valvole di regolazione e intercettazione, modifica e fornitura tubazioni e canalizzazioni e accessori

IT. No.

Art. n. 1 EA/NO 1.00

NEW DDC UNIT INCLUDING CONTROLLED POINTS AND

FIELD ELEMENTS, WIRING, PROGRAMMING, CONTROL

PANEL AND FITTINGS. REUSE AND REPROGRAM EXISTING

DDC UNIT FOR CONTROL OF AHU-02. CANCELED

IT. No.

Art. n. 2

NEW MINI AIR HANDLING UNIT INCLUDING MECHANICAL

AND ELECTRICAL CONNECTIONS, FRESH AIR INTAKE

GRILLE WITH G3 FILTER, BRACKETS, ROOM PANEL, 3 WAY

CONTROL VALVES, SILENCER, DUCTWORK ADJUSTMENT

AND FITTINGS. AHUM-01

Nuova mini unità di trattamento aria comprensiva di connessioni meccaniche ed elettriche, griglia di presa aria esterna con filtro G3, staffaggi, pannello ambiente, valvole di controllo a 3 vie, silenziatore, modifica canalizzazione e accessori. AHUM-01

IT. No.

Art. n. 3a EA/NO 1.00

NEW MINI AIR HANDLING UNIT INCLUDING MECHANICAL

AND ELECTRICAL CONNECTIONS, FRESH AIR INTAKE

GRILLE WITH G3 FILTER, BRACKETS, ROOM PANEL, 3 WAY

CONTROL VALVES, SILENCER, DUCTWORK ADJUSTMENT

AND FITTINGS. AHUM-03

Nuova mini unità di trattamento aria comprensiva di connessioni meccaniche ed elettriche, griglia di presa aria esterna con filtro G3, staffaggi, pannello ambiente, valvole di controllo a 3 vie, silenziatore, modifica canalizzazione e accessori. AHUM-03

IT. No.

Art. n. 3b EA/NO 1.00

NEW MINI AIR HANDLING UNIT INCLUDING MECHANICAL

AND ELECTRICAL CONNECTIONS, FRESH AIR INTAKE

GRILLE WITH G3 FILTER, BRACKETS, ROOM PANEL, 3 WAY

CONTROL VALVES, SILENCER, DUCTWORK ADJUSTMENT

AND FITTINGS. AHUM-04

Nuova mini unità di trattamento aria comprensiva di connessioni meccaniche ed elettriche, griglia di presa aria esterna con filtro G3, staffaggi, pannello ambiente, valvole di controllo a 3 vie, silenziatore, modifica canalizzazione e accessori. AHUM-04

IT. No.

Art. n. 3c EA/NO 1.00

FOR OFFICIAL USE ONLY Sheet 14 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 907 REV1

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

NEW MINI AIR HANDLING UNIT INCLUDING MECHANICAL

AND ELECTRICAL CONNECTIONS, BRACKETS, ROOM

PANEL, 3 WAY CONTROL VALVES, SILENCER, DUCTWORK

ADJUSTMENT AND FITTINGS. AHUM-02

Nuova mini unità di trattamento aria comprensiva di connessioni meccaniche ed elettriche, staffaggi, pannello ambiente, valvole di controllo a 3 vie, silenziatore, modifica canalizzazione e accessori.

AHUM-02

IT. No.

Art. n. 3d EA/NO 1.00

NEW BLUEBOX CHILLER UNIT WITH HYDRONIC MODULE

INCLUDING MECHANICAL AND ELECTRICAL CONNECTIONS

AND FITTINGS

Nuovo refrigeratore BLUEBOX e con modulo idronico comprensivo di connessioni meccaniche ed elettriche e accessori

IT. No.

Art. n. 4 LS/AC 1.00

NEW BLUEBOX CHILLER UNIT 205 KW, WITH HYDRONIC

MODULE INCLUDING MECHANICAL AND ELECTRICAL

CONNECTIONS AND FITTINGS

Nuovo refrigeratore BLUEBOX 205 kw e con modulo idronico comprensivo di connessioni meccaniche ed elettriche e accessori

IT. No.

Art. n. 5 LS/AC 1.00

14 NEW HUMIDIFIER FOR AHU-02

Nuovo umidificatore per AHU-2

IT. No.

Art. n. 6 LS/AC 1.00

15 SYSTEM BALANCING AND TECHNICAL TEST REPORT

bilanciamento del sistema e redazione report

IT. No.

Art. n. 7 LS/AC 1.00

Total Mechanical - Totale Meccanico

TOTAL PART III - Totale Parte III

FOR OFFICIAL USE ONLY Sheet 15 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 907 REV1

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

TOTAL PRICE / Costo Totale

SUMMARY / Riepilogo

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

FOR OFFICIAL USE ONLY Sheet 16 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1013 (NO CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ia Architectural Demolition - Ia Demolizioni Architettoniche

Not Applicable/Non applicabile

Ib Mechanical Demolitions - Demolizioni Meccaniche

REMOVAL OF EXISTING FANCOIL UNIT, MECHANICAL &

ELECTRICAL CONNECTIONS AND FITTINGS

Rimozione del ventilconvettore esistente, connessioni meccaniche ed elettriche ed accessori

IT. No.

Art. n. 1 LS/AC 4.00

REMOVAL OF EXISTING BURIED HOT WATER PIPES INSIDE

THE BUILDING

Rimozione delle tubazioni esistenti acqua calda all'interno del fabbricato

IT. No.

Art. n. 2 LS/AC 1.00

REMOVAL OF EXISTING BURIED HOT WATER PIPES FROM

BOILER ROOM FEEDING FANCOIL UNITS

Rimozione delle tubazioni esistenti interrate di acqua calda dalla centrale termica alimentanti i ventilconvettori

IT. No.

Art. n. 3 LS/AC 1.00

REMOVAL OF DX UNIT, MECHANICAL & ELECTRICAL

CONNECTIONS AND FITTINGS

Rimozione dell'unità ad espansione diretta, connessioni meccaniche ed elettriche ed accessori

IT. No.

Art. n. 4 EA/NO 2.00

Total Mechanical - Totale Meccanico

Ic Electrical Demolitions - Ie Demolizioni Elettriche

5 REMOVE F/A SYSTEM

Rimozione Impianto Allarme Incendio

IT. No.

Art. n. 5 LS/AC 1.00

Total Electrical - Totale Elettrico

BLDG 1013

FOR OFFICIAL USE ONLY Sheet 17 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1013 (NO CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili

IIa Architectural - IIa Architettonico

REMOVAL AND REINSTALLATION OF SUSPENDED CEILING

PANELS

Rimozione e reinstallazione pannelli contrrosoffitto

IT. No.

Art. n. 1 LS/AC 1.00

7 PREPAINTED GALVANIZED STEEL PIPING COVER

Carter in accio zincato preverniciatpo per protezione tubi

IT. No.

Art. n. 2 EA/NO 4.00

8 NEW CONCRETE PAD

Nuovo basamento in calcestruzzo

IT. No.

Art. n. 3 LS/AC 1.00

9 UTILITY TRENCHES

Trincee sottoservizi

IT. No.

Art. n. 4 LS/AC 1.00

FOR OFFICIAL USE ONLY Sheet 18 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1013 (NO CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici

NEW BURIED PIPES FROM BOILER ROOM FEEDING NEW

FANCOIL UNITS INCLUDING BACKFILLING

Nuove tubazioni interrate di acqua calda dalla centrale termica alimentanti i nuovi ventilconvettori compreso il rinterro

IT. No.

Art. n. 1 LS/AC 1.00

FURNISHING AND INSTALLATION OF NEW BLUEBOX

CHILLER UNIT CH-01 INCLUDING EXPANSION TANK,

INERTIAL TANK AND FITTINGS

Fornitura e posa in opera di nuovo refrigeratore BLUEBOX CH-01 comprensivo di vaso di espansione, serbatoio inerziale e accessori

IT. No.

Art. n. 2 LS/AC 1.00

NEW VERTICAL CABINET ECM FANCOIL UNIT INCLUDING

MECHANICAL AND ELECTRICAL CONNECTIONS,3-WAY

ON/OFF CONTROL VALVE WITH ACTUATOR, SHUT-OFF

VALVES, CONTROLLER, ROOM PANEL AND FITTINGS.

FCV-01

Nuovo ventilconvettore a mobiletto ecm comprensivo di connessioni meccaniche ed elettriche, valvola di regolazione ON/OFF a 3 vie con attuatore, valvole di intercettazione, controllore, pannello di controllo ed accessori. FCV-01

IT. No.

Art. n. 3a EA/NO 4.00

NEW CHILLED WATER PIPING FEEDING NEW FANCOIL

UNITS

Nuova tubazione acqua refrigerata per alimentazione nuovi ventilconvettori

IT. No.

Art. n. 4 LS/AC 1.00

14 NEW CONDENSATE DRAIN PIPING

Nuove linea di scarico condensa

IT. No.

Art. n. 5 LS/AC 1.00

15 NEW MAKE UP WATER LINE

Nuova linea di reintegro

IT. No.

Art. n. 6 LS/AC 1.00

Total Mechanical - Totale Meccanico

TOTAL PART III - Totale Parte III

Power System - Impianto Forza Motrice

FOR OFFICIAL USE ONLY Sheet 19 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1013 (NO CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

RES. CURR. MAGNETOT. CIRCUIT BREAKER AND FEEDING

LINE FG16OM16 3G4 MMQ CABLE FOR NEW CHILLER

Interruttore magnetot.diff.e linea di alimentazione con cavo FG16OM16 3G4 mmq del nuovo refrigeratore

IT. No.

Art. n. 1 LS/AC 1

Total Power System - Totale Impianto Forza Motrice

Fire Alarm System systems - Impianto Allarme Incedio

17 SMOKE DETECTORS

Rilevatori di fumo

IT. No.

Art. n. 2 EA/NO 9

18 RED PILOT LIGHT

Lampada spia rossa

IT. No.

Art. n. 3 EA/NO 5

19 PULL STATIONS

Stazioni manuali

IT. No.

Art. n. 4 EA/NO 2

20 Audio/video devices Dispositivi audio/video

IT. No.

Art. n. 5 EA/NO 2

21 ALARM BELL

Campana di allarme

IT. No.

Art. n. 6 EA/NO 1

22 CONVENTIONAL FIRE ALARM CONTROL PANEL

Centrale Rivelazione Incendi Convenzionale

IT. No.

Art. n. 7 EA/NO 1

23 FTE40HM1 2X1,5 MMQ CABLE

Cavo FTE40HM1 2X1,5 mmq

IT. No.

Art. n. 8 LM/ML 60

24 METAL CABLE TRAY 100x100 MM Canalina Metallica 100x100 mm

IT. No.

Art. n. 9 LM/ML 15

25 PVC RIGID CONDUIT DIAM. 40 MM

Tubazione Rigida in PVC Diam. 40 mm

IT. No.

Art. n. 10a LM/ML 15

26 PVC RIGID CONDUIT DIAM. 25 MM

Tubazione Rigida in PVC Diam. 25 mm

IT. No.

Art. n. 10b LM/ML 15

27 PVC FLEXIBLE CONDUIT DIAM. 25 MM

Tubazione Flesibile in PVC Diam. 25 mm

IT. No.

Art. n. 11 LM/ML 5

28 JUNCTION BOX 80X80X40 MM

Scatola di Derivazione 80x80x40 mm

IT. No.

Art. n. 12 LM/ML 11

29 F/A programmation Programmazione quadro F/A

IT. No.

Art. n. 13 LS/AC 1

FOR OFFICIAL USE ONLY Sheet 20 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1013 (NO CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

TOTAL PRICE / Costo Totale

SUMMARY / Riepilogo

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

FOR OFFICIAL USE ONLY Sheet 21 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1405 CANCELED

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

FOR OFFICIAL USE ONLY Sheet 22 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1407

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ia Architectural Demolition - Ia Demolizioni Architettoniche

1 REMOVAL OF WATERPROOFING MEMBRANE

Rimozione dui guaina impermeabilizzante

IT. No.

Art. n. 1 SM/MQ 81.60

Total Architectural - Totale Architettura

Ib Mechanical Demolitions - Demolizioni Meccaniche

REMOVAL OF EXISTING AIR HANDLING UNIT, INCLUDING

MECHANICAL AND ELECTRICAL CONNECTIONS,

DUCTWORK, ACTUTATORS, SENSORS, DDC UNIT AND

FITTINGS

Rimozione dell'esistente unità di trattamento aria esistente, comprese le connessioni meccaniche ed elettriche, canalizzazioni, attuatori, sensori, unità DDC e accessori

IT. No.

Art. n. 2 LS/AC 1.00

REMOVAL OF EXISTING HOT/CHILLED WATER PIPING,

CONTROL AND SHUTOFF VALVES AND FITTINGS

Rimozione delle tubazioni esistenti di acqua calda/refrigerata, valvole di controllo e regolazione e accessori

IT. No.

Art. n. 3 LS/AC 1.00

REMOVAL AND RELOCATION OF EXISTING DX CONDENSING

UNIT FOOR MOUNTED

Rimozione e riposizionamento di unità condensante DX installata a pavimento

IT. No.

Art. n. 4 LS/AC 1.00

REMOVAL AND RELOCATION OF EXISTING DX CONDENSING

UNIT WALL MOUNTED

Rimozione e riposizionamento di unità condensante DX installata a parete

IT. No.

Art. n. 5 LS/AC 1.00

Total Mechanical - Totale Meccanico

Ic Electrical Demolitions - Ie Demolizioni Elettriche

Not Applicable/Non applicabile

TOTAL PART I / Totale Parte I

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili

BLDG 1407 (NO CHANGE)

FOR OFFICIAL USE ONLY Sheet 23 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1407

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

IIa Architectural - IIa Architettonico

6 NEW WATERPROOFING MEMBRANE

Nuova Guaina Impermeabilizzante

IT. No.

Art. n. 1 SM/MQ 81.60

7 ROOF REPAIR

Ripristino copertura

IT. No.

Art. n. 2 LS/AC 1.00

8 PROTECTIVE CASES/FLASHINGS

Scossasline e involucri di protezione

IT. No.

Art. n. 3 LS/AC 1.00

FOR OFFICIAL USE ONLY Sheet 24 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1407

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici

COMPLETE REPLACEMENT OD DAMAGED PIPEWORK AND

DEVICES IN MECH ROOM

Sostituzione delle tubazioni e dispositivi danneggiati all'interno del locale meccanico

IT. No.

Art. n. 1 LS/AC 1.00

NEW CHEMICAL POT FEEDER AND DIRT/SLUDGE

SEPARATOR CPF-1

Nuovo filtro a masse chiarificatore e defangatore CPF-1

IT. No.

Art. n. 2 EA/NO 1.00

NEW ENERGY RECOVERY UNIT AHU-01 INCLUDING

MECHANICAL AND ELECTRICAL CONNECTIONS, NEW

DUCTWORK, 3-WAY CONTROL VALVE AND FITTINGS

Nuovo recuperatore AHU-01 comprensivo di connessioni meccaniche ed elettriche, nuova canalizzazione, valvola di controllo a 3 vie e accessori

IT. No.

Art. n. 3 EA/NO 1.00

NEW AHU-02 INCLUDING MECHANICAL AND ELECTRICAL

CONNECTIONS, NEW DUCTWORK, SENSORS AND FIELD

ELEMENTS, 3 WAY CONTROL VALVE AND FITTINGS

Nuova unità di trattamento aria AHU-02 comprensiva di connessioni meccaniche ed elettriche, nuove canalizzazioni, sensori ed elementi in campo, valvola di controllo a 3 vie e accessori

IT. No.

Art. n. 4 EA/NO 1.00

13 NEW DDC-1

Nuovo DDC-1

IT. No.

Art. n. 5 LS/AC 1.00

NEW HOT/CHILLED WATER PIPING INCLUDING BRACKETS,

SHUTOFF VALVES, INSULATION, ALUMINUM COVER AND

FITTINGS

Nuova tubazione di acqua calda/refrigerata compresi gli staffaggi, valvole di intercettazione, isolamento e lamierino e accessori

IT. No.

Art. n. 6 LS/AC 1.00

15 SYSTEM BALANCING AND TECHNICAL TEST REPORT

bilanciamento del sistema e redazione report

IT. No.

Art. n. 7 LS/AC 1.00

Total Mechanical - Totale Meccanico

TOTAL PART III - Totale Parte III

FOR OFFICIAL USE ONLY Sheet 25 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1407

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Power System - Impianto Forza Motrice

RES. CURR. MAGNETOT. CIRCUIT BREAKER FOR NEW AHU

FAN

Interruttore magnetot.diff. per ventilatore nuova UTA

IT. No.

Art. n. 1 EA/NO 1

Total Power System - Totale Impianto Forza Motrice

TOTAL PART IV - Totale Parte IV

TOTAL PRICE / Costo Totale

SUMMARY / Riepilogo

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

FOR OFFICIAL USE ONLY Sheet 26 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1434

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ia Architectural Demolition - Ia Demolizioni Architettoniche

Not Applicable/Non applicabile

Ib Mechanical Demolitions - Demolizioni Meccaniche

REMOVAL OF EXISTING CHILLER UNIT CANCELED,

work performed by CE personell

IT. No.

Art. n. 1

2 REMOVAL OF EXISTING CIRCULATING PUMP AND FITTINGS

Rimozione della pompa di circolazione esistente ed accessori

IT. No.

Art. n. 2 LS/AC 1.00

3 TEMPORARY REMOVAL OF EXISTING INERTIAL TANK IT-01

Rimozione temporanea del serbatoio inerziale esistente IT-01

IT. No.

Art. n. 3 LS/AC 1.00

REMOVAL OF EXISTING 3-WAY CONTROL VALVES OF AHU-

01 AND AHU-02 AT THE ATTIC LEVEL

Rimozione delle valvole di regolazione a tre vie delle AHU-01 ed AHU-02 installate nel sottotetto

IT. No.

Art. n. 4 LS/AC 1.00

Total Mechanical - Totale Meccanico

Ic Electrical Demolitions - Ie Demolizioni Elettriche

Not Applicable/Non applicabile

TOTAL PART I / Totale Parte I

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili

BLDG 1434 (CHANGE)

FOR OFFICIAL USE ONLY Sheet 27 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1434

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

IIa Architectural - IIa Architettonico

REMOVAL AND REINSTALLATION OF SUSPENDED CEILING

PANELS

Rimozione e reinstallazione pannelli contrrosoffitto

IT. No.

Art. n. 1 LS/AC 1.00

FOR OFFICIAL USE ONLY Sheet 28 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1434

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici

REMOVAL OF EXISTING CHILLER UNIT CANCELED,

work performed by CE personell

IT. No.

Art. n. 1

RE-INSTALLATION IN NEW POSITION OF EXISTING INERTIAL

TANK IT-01

Re-installazione in nuova posizione del serbatoio inerziale esistente IT-01

IT. No.

Art. n. 2 EA/NO 1.00

8 NEW CHILLED WATER PIPING

Nuove tubazioni acqua refrigerata

IT. No.

Art. n. 3 LS/AC 1.00

9 SYSTEM BALANCING AND TECHNICAL TEST REPORT

bilanciamento del sistema e redazione report

IT. No.

Art. n. 4 LS/AC 1.00

NEW CHECK VALVES AND BALL VALVES IN MECH ROOM

WITH PIPING ADJUSTMENT

Nuove valvole di ritegno e valvole a sfera nelal centrale meccanica con adeguamento tubazioni

IT. No.

Art. n. 5 LS/AC 1.00

11 PROVIDE COMPLETE REVISION OF AHUs Provvedere alla completa revisione delle UTA

IT. No.

Art. n. 6 LS/AC 1.00

Total Mechanical - Totale Meccanico

TOTAL PART III - Totale Parte III

FOR OFFICIAL USE ONLY Sheet 29 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1434

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

TOTAL PRICE / Costo Totale

OR US DOLLARS (RATE 1$ = 0,8582 €)

SUMMARY / Riepilogo

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

FOR OFFICIAL USE ONLY Sheet 30 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1483 (CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ia Architectural Demolition - Ia Demolizioni Architettoniche

Not Applicable/Non applicabile

Ib Mechanical Demolitions - Demolizioni Meccaniche

REMOVAL OF EXISTING CHILLER UNIT, MECHANICAL AND

ELECTRICAL CONNECTION AND FITTINGS

Rimozione del chiller esistente, connessioni meccaniche ed elettriche ed accessori

IT. No.

Art. n. 1 LS/AC 1.00

Total Mechanical - Totale Meccanico

Ic Electrical Demolitions - Ie Demolizioni Elettriche

Not Applicable/Non applicabile

TOTAL PART I / Totale Parte I

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili

BLDG 1483

FOR OFFICIAL USE ONLY Sheet 31 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1483 (CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

IIa Architectural - IIa Architettonico

FOR OFFICIAL USE ONLY Sheet 32 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1483 (CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici

ONLY INSTALLATION. CHILLER UNIT BLUEBOX, INCLUDING

MECHANICAL AND ELECTRICAL CONNECTIONS, PIPING

WITH INSULATION, ANTI VIBRATING JOINTS, CHECK AND

SHUTOFF VALVE AND FITTINGS

sola installazione chiller comprensivo di connessioni meccaniche ed elettriche, tubazione con isolamento, giunti antivibranti, valvole di ritegno e intercettazione e accessori

IT. No.

Art. n. 1

2 NEW INERTIAL TANK

Nuovo serbatoio inerziale

IT. No.

Art. n. 2 EA/NO 1.00

3 NEW CHILLED WATER PIPING

Nuove tubazioni acqua refrigerata

IT. No.

Art. n. 3 LS/AC 1.00

4 SYSTEM BALANCING AND TECHNICAL TEST REPORT

bilanciamento del sistema e redazione report

IT. No.

Art. n. 4 LS/AC 1.00

Total Mechanical - Totale Meccanico

TOTAL PART III - Totale Parte III

FOR OFFICIAL USE ONLY Sheet 33 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 1483 (CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Not Applicable/Non applicabile

TOTAL PRICE / Costo Totale

SUMMARY / Riepilogo

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

FOR OFFICIAL USE ONLY Sheet 34 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 10462 (CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ia Architectural Demolition - Ia Demolizioni Architettoniche

Not Applicable/Non applicabile

Ib Mechanical Demolitions - Demolizioni Meccaniche

REMOVAL OF EXISTING DUCTED DX UNIT AND EXTERNAL

UNIT CANCELED Rimozione dell'unità ad espansione diretta canalizzata esistente e la relativa unità esterna

CANCELLATO

IT. No.

Art. n. 1

Total Mechanical - Totale Meccanico

Ic Electrical Demolitions - Ie Demolizioni Elettriche

2 REMOVE F/A SYSTEM

Rimozione Impianto Allarme Incendio

IT. No.

Art. n. 2 LS/AC 1.00

Total Electrical - Totale Elettrico

BLDG 10462

FOR OFFICIAL USE ONLY Sheet 35 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 10462 (CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili

IIa Architectural - IIa Architettonico

REMOVAL AND REINSTALLATION OF SUSPENDED CEILING

PANELS

Rimozione e reinstallazione pannelli contrrosoffitto

IT. No.

Art. n. 1 LS/AC 1.00

FOR OFFICIAL USE ONLY Sheet 36 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 10462 (CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

CANCELED PART III - MECHANICAL WORK / Parte III - Lavori Meccanici

4 CANCELED FURNISHING AND INSTALLATION OF NEW

CHILLER UNIT CH-01

IT. No.

Art. n. 1

5 CANCELED. NEW MINI AIR HANDLING UNIT

IT. No.

Art. n. 2

Total Mechanical - Totale Meccanico

TOTAL PART III - Totale Parte III

PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici

Power System - Impianto Forza Motrice

RES. CURR. MAGNETOT. CIRCUIT BREAKER AND FEEDING

LINE FG16OM16 5G4 MMQ CABLE FOR NEW CHILLER

Interruttore magnetot.diff.e linea di alimentazione con cavo FG16OM16 5G4 mmq del nuovo refrigeratore

IT. No.

Art. n. 1 LS/AC 1

Total Power System - Totale Impianto Forza Motrice

Fire Alarm System systems - Impianto Allarme Incedio

FOR OFFICIAL USE ONLY Sheet 37 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 10462 (CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

7 SMOKE DETECTORS

Rilevatori di fumo

IT. No.

Art. n. 2 EA/NO 13

8 HEAT DETECTORS

Rilevarori di Calore

IT. No.

Art. n. 3 EA/NO 3

8 RED PILOT LIGHT

Lampada spia rossa

IT. No.

Art. n. 4 EA/NO 7

9 PULL STATIONS

Stazioni manuali

IT. No.

Art. n. 5 EA/NO 5

10 Audio/video devices Dispositivi audio/video

IT. No.

Art. n. 6 EA/NO 5

11 CONVENTIONAL FIRE ALARM CONTROL PANEL

Centrale Rivelazione Incendi Convenzionale

IT. No.

Art. n. 7 EA/NO 1

12 FTE40HM1 2X1,5 MMQ CABLE

Cavo FTE40HM1 2X1,5 mmq

IT. No.

Art. n. 8 LM/ML 60

13 PVC RIGID CONDUIT DIAM. 40 MM

Tubazione Rigida in PVC Diam. 40 mm

IT. No.

Art. n. 9a LM/ML 25

14 PVC RIGID CONDUIT DIAM. 25 MM

Tubazione Rigida in PVC Diam. 25 mm

IT. No.

Art. n. 9b LM/ML 50

15 PVC FLEXIBLE CONDUIT DIAM. 25 MM

Tubazione Flesibile in PVC Diam. 25 mm

IT. No.

Art. n. 10 LM/ML 10

16 JUNCTION BOX 80X80X40 MM

Scatola di Derivazione 80x80x40 mm

IT. No.

Art. n. 11 LM/ML 24

17 F/A programmation Programmazione quadro F/A

IT. No.

Art. n. 12 LS/AC 1

FOR OFFICIAL USE ONLY Sheet 38 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - BLDG 10462 (CHANGE)

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

TOTAL PRICE / Costo Totale

SUMMARY / Riepilogo

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

FOR OFFICIAL USE ONLY Sheet 39 of 40

CONTRACTOR COST ESTIMATE BREAKDOWN REV1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

DESIGN FOR SUSTAIN HVAC SYSTEM MULTI

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1087 REV1 AREA C - AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 BUILDING 410 - SHOPS

2 BUILDING 416 - WOOD CARPENTRY SHOP

3 BUILDING 907 - P.MEL LABORATORY

4 BUILDING 1013 - PETROL OPS

5 BUILDING 1405 - GYM CANCELED

6 BUILDING 1407 - SHOPPETTE

7 BUILDING 1434 - FIRE BRIGADE

8 BUILDING 1483 - TLF

9 BUILDING 10462 - BCE

BUILDING SUMMARY / Riepologo per Fabbricati

TOTAL PRICE / Costo Totale

ASHE 18-1087- DESIGN FOR SUSTAIN HVAC SYSTEM MULTI - AREA F AND AREA C, AVIANO AB, REV1

INSTRUCTIONS FOR COMPLETING AF FORM 3052

TOTAL MATERIAL COSTS €

TOTAL LABOR COSTS €

TOTAL OTHER DIRECT COSTS €

TOTAL DIRECT COSTS €

OVERHEAD % €

SUBTOTAL €

PROFIT % €

TOTAL PRICE €

DATE FIRM NAME

TITLE BY

INSTRUCTIONS TO OFFERORS

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.

Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .