ATCH_1_ASHE_19-1039_Schedule_of_Material_Submittals_(Rev.2.0).doc

DOC document 60 KB Posted

Attached to
ASHE 19-1039 UPGRADE COMM NETWORK TO CORE DISTRIBUTION NODES, AREA F, AVIANO AB
Solicitation number
FA568219RA020
Issued by

About this file

ATTACHMENT #1 (SCHEDULE OF MATERIAL SUBMITTALS)

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

ASHE 19-1039

PROJECT TITLE

UPGRADE COMM NETWORK TO CORE DISTRIBUTION NODE, AREA F, A.A.B

AB

SOLICITATION CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER
TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

REQUIRED SUBMISSION DATE
DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENSE

DATE

SUBMITTAL NUMBERS

CONTRACTOR RESUBMITTAL
FINAL APPROVAL

LINE NUMBER

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
CERTIFICATION OF COMPLIANCE
SHOP DRAWING
SAMPLES
COLOR SELECTION
MANUFACTURER’S RECOMMENDATIONS
MANUFACTURER’S WARRANTY
CATALOG DATA
OPERATING INSTRUCTIONS
STRUCTURAL CALCULATION

DATE CONTRACTOR

NOTIFIED

REMARKS

APPROVED
DIS-APPROVED

PART 4.1 INSTALLATION

1
3x3”-Cell with Colour Coded Pull Tape as per SOW, para. 5.1.1
1
1
2
144 strands SM FOC as per SOW, para. 4.2 and 5.2
1
1
3
144-port FODP fusion splice to pigtails kit as per SOW, para. 4.2 and 5.2
1
1
4
42U full size 19’ rack type as per SOW, para. 4.2 and 5.2
1
1

- IX -

AFForm 66, OCT 89

AFForm 66, OCT 89