ASHE_19-1039_CCEB.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- FA568219RA020
About this file
CONSTRUCTION COST ESTIMATE BREAKDOWN
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASHE 19-1039
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |
| UPGRADE COMM NETWORK TO CORE DISTRIBUTION NODES |
USAF User: USAF User:
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||
| ASHE 19-1039 | AREA F, AVIANO AIR BASE, ITALY | ||||||||||
| MATERIAL COSTS | LABOR COSTS | ||||||||||
| LINE NO. | ITEM | IT.No. | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| WORKS (A) |
| 4.1 Ductbank infrastructure | ||||
| 1 | Ductbank Infrastructure 2x4" | it. 4.1.1 | L.S. | 1.00 |
| 4.2 Installation of a 12 strand single mode (SM) fiber optic cable (FOC) from B10293 to B1442 | ||||
| 2 | 144 strand S.M. Fiber Optic Cable (144L8.3F) from CN-10293 to CN-11341 | it. 4.2.1 | L.S. | 1.00 |
| 3 | 144 strand S.M. Fiber Optic Cable (144L8.3F) from CN-11341 to CN-1226 | it. 4.2.2 | L.S. | 1.00 |
| 4 | 144 strand S.M. Fiber Optic Cable (144L8.3F) from CN-1226 to CN-1442 | it. 4.2.3 | L.S. | 1.00 |
| TOTALS WORKS (A) |
WORKS (B)
| 5.1 Ductbank infrastructure | ||||
| 5 | Geotextile Infrastructure Maxcell three 3x3" | it. 5.1.1 | L.S. | 1.00 |
| 5.2 Installation of a 12 strand single mode (SM) fiber optic cable (FOC) from B1442 to B10293 | ||||
| 6 | 144 strand S.M. Fiber Optic Cable (144L8.3F) from CN-1442 to CN-1496 | it. 5.2.1 | L.S. | 1.00 |
| 7 | 144 strand S.M. Fiber Optic Cable (144L8.3F) from CN-1496 to CN-10293 | it. 5.2.2 | L.S. | 1.00 |
| 7 TESTING, AS BUILT, GEOSPATIAL SURVEY | ||||
| 8 | Testing, As built, Geospatial survey | it. 7.1 it. 7.2 it. 7.3 it. 7.4 | L.S. | 1.00 |
| TOTALS WORKS (B) |
TOTALS WORKS A+ B
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY Sheet &P of &N
Total
ASHE19-1039 UPGRADE COMM NETWORK TO CORE DISTRIBUTION NODES, AREA F, A.A.B
INSTRUCTIONS FOR COMPLETING AF FORM 3052
TOTAL MATERIAL COSTS €
TOTAL LABOR COSTS €
TOTAL OTHER DIRECT COSTS €
TOTAL DIRECT COSTS €
OVERHEAD % €
SUBTOTAL €
PROFIT % €
TOTAL PRICE €
DATE FIRM NAME
TITLE BY
INSTRUCTIONS TO OFFERORS
FOR OFFICIAL USE ONLY Sheet &P of &N
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
File details come from the government source that posted it.