ASHE_18-1018_CCEB_REV._01.pdf
PDF 392 KB Posted
- Attached to
- Repair HVAC Bldg 1442 Federal contract opportunity
- Solicitation number
- FA568218R0046
About this file
CCEB Rev. 01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ASHE_18-1018_CCEB_R3.xlsx | XLSX spreadsheet | |
| FA568218R00460003.pdf | ||
| Attachment_4_Master_Technical_Specs_Nov_2005_English.zip | ZIP file | |
| Attachment_3_Additional_Requirements,_May_2018.pdf | ||
| ASHE_18-1018_CCEB_R2.xlsx | XLSX spreadsheet | |
| FA568218R00460002.pdf | ||
| ASHE_18-1018_Tech_Specs_Rev.2.pdf | ||
| FA568218R0046.pdf | ||
| ASHE_18-1018_Tech_Specs_Rev.01.pdf | ||
| FA568218R00460001.pdf | ||
| ASHE_18-1018_CCEB_R2.xlsx | XLSX spreadsheet | |
| Drawings.zip | ZIP file | |
| ASHE_18-1018_TECH_SPECS.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
Prepared and Submitted by:
Engineering Tools srl Via del Makò, 33 - 33084 Cordenons (PN)
Tel. +39 0434 536333; Fax +39 0434 542813 Email: info@engtools.eu
PROJECT ASHE 18-1018
A/E CONTRACT No. FA5682-17-D-0006; D.O. 0024
REPAIR HVAC SYSTEM FAC.1442
AREA F – AVIANO AB, ITALY
CONSTRUCTION COST ESTIMATE
SUBMITTAL: FINAL (100% design) – Rev.01
Date: July the 3rd, 2018
PROJECT: ASHE 18-1018
REPAIR HVAC SYSTEM FAC. 1442
FINAL (100%)
THIS PAGE LEFT INTENTIONNALLY BLANK
FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
A.
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ib Structural Demolitions - Ib Demolizioni Strutturali
DEMOLITION AND REMOVAL OF EXTERIOR WALL AT THE BACK OF THE
BUILDING. CANOPY INCLUDED
Demolizione e rimozione del muro esterno dietro l'edificio. Compresa la demolizione della passerella
IT. No.
Art. n.
1 LS/AC
Total Structural Demolitions - Totale Demolizioni Strutturali
Id Mechanical Demolitions - Id Demolizioni Meccaniche
REMOVAL OF EXISTING WATER CHILLERS (ABOUT 221KW AND 422KW)
AND DRY COOLER AND RELATED CHILLED WATER PIPEWORK,
CONTROLS ETC.
Rimozione dei chiller di circa 221kW e 422kW e del dry cooler e delle relative tubazioni, controlli, etc.
IT. No.
Art. n.
2 LS/AC
REMOVAL OF EXISTING PRIMARY PUMP FOR THE CHILLED WATER
CIRCUITS (P1A AND P1B) AND RELATED CHILLED WATER PIPEWORK,
AND ALL OTHER SYSTEM ACCESSORIES AND FITTINGS,
Rimozione delle esistenti pompe per il primario del cicuito chiller (P1A e P1B) e relative tubazioni ed ogni altro sistema ed accessorio
IT. No.
Art. n.
3 LS/AC
REMOVAL OF EXISTING CLOSE CONTROL UNITS (DX UNITS) IN THE
TELEPHONE SWITCH ROOM INCLUDED EVERY ASSOCIATED SYSTEM.
INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE
NECESSARY. CRACU-1 AND CRACU-2.
Rimozione delle esistenti unità di condizionamento ad espansione diretta nella telephone switch room inclusi ogni sistema associato. Incluso noleggio sistemi di raffreddamento ove necessario. CRACU-1 e CRACU-2
IT. No.
Art. n.
4 LS/AC
SUSTAIN WORKS / Lavori di Manutenzione Evolutiva
FOR OFFICIAL USE ONLY Sheet 1 of 14
GOVERNMENT COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
REMOVAL OF EXISTING CHILLED WATER CLOSE CONTROL UNITS IN
THE SIPRNET ROOM INCLUDED EVERY ASSOCIATED SYSTEM.
INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE
NECESSARY. CRACU-3 AND CRACU-4.
Rimozione delle esistenti unità di condizionamento ad acqua refrigerata nella
SIPRnet room. Inclusi ogni sistema associato. Incluso il noleggio di sistemi di raffreddamento ove necessario. CRACU-3 e CRACU-4
IT. No.
Art. n.
6 LS/AC
REMOVAL OF EXISTING CHILLED WATER CLOSE CONTROL UNITS IN
THE NIPRNET ROOM INCLUDED EVERY ASSOCIATED SYSTEM.
INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE
NECESSARY. CRACU-5 AND CRACU-6.
Rimozione delle esistenti unità di condizionamento ad acqua refrigerata nella
NIPRnet room. Inclusi ogni sistema associato. Incluso il noleggio di sistemi di raffreddamento ove necessario. CRACU-5 e CRACU-6
IT. No.
Art. n.
5 LS/AC
REMOVAL OF EXISTING DX UNITS IN UPS ROOM INCLUDED THE
RENTING OF COOLING EQUIPMENT WHERE NECESSARY
Rimozione delle esistenti unità di condizionamento ad espansione diretta nella
UPS room. Inclusi ogni sistema associato. Incluso il noleggio di sistemi di raffreddamento ove necessario.
IT. No.
Art. n.
7 LS/AC
REMOVAL OF CONTROLS (FOR REINSTALLATION AFTER EQUIPMENT
REPLACEMENT) ON THE CHILLERS EQUIPMENT, IN MECHANICAL
(PUMPS) ROOM AND IN THE TELEPHONE SWITCH, NIPRNET, SIPRNET
ROOMS
Rimozione dei controlli (per reinstallazione dopo sostituzione equipaggiamento) su chiller, in sala meccanica (pompe) e nelle stanze telephone switch, NIPRnet, SIPRnet .
IT. No.
Art. n.
8 LS/AC
Total Mechanical Demolitions - Totale Demolizioni Meccaniche
Ie Electrical Demolition - Ia Demolizioni Impianti Elettrici
REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE PUMPS
REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione delle pompe (P1A
/ P1B )
IT. No.
Art. n.
9 LS/AC
FOR OFFICIAL USE ONLY Sheet 2 of 14
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CHILLERS
REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione dei chillers
IT. No.
Art. n.
10 LS/AC
REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CRACU-1/2
REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione dei cracu-1/2
IT. No.
Art. n.
11 LS/AC
REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CRACU-3/4
REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione dei cracu-3/4
IT. No.
Art. n.
13 LS/AC
REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CRACU-5/6
REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione dei cracu-5/6
IT. No.
Art. n.
12 LS/AC
REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE DX UNIT IN
THE UPS ROOM REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione delle unita' ad espanzione diretta nel locale UPS
IT. No.
Art. n.
14 LS/AC
Total Electrical Demolitions - Totale Demolizioni Elettriche
TOTAL PART I / Totale Parte I
FOR OFFICIAL USE ONLY Sheet 3 of 14
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIb Architectural - IIb Architettonico
SUPPLY AND INSTALLATION OF METAL FENCE
Fornitura ed installazione di recinzione metallica
IT. No.
Art. n.
1 LS/AC
SUPPLY AND INSTALLATION OF METAL FLASHINGS TO COVER THE NEW
PERIMETRAL WALL
Fornitura ed installazione di lattoneria per coprire il nuovo muretto perimetrale
IT. No.
Art. n.
2 LS/AC
REPAIR EXTERIOR PLASTER
Riparare intonaco esterno
IT. No.
Art. n.
4 LS/AC
PAINTING OF EXTERIOR WALL SURFACE
Pittura esterna
IT. No.
Art. n.
3 LS/AC
SUPPLY AND INSTALLATION OF POLYMERIC-BITUMINOUS
WATERPROOF SHEATH
Fornitura e posa in opera d guaina polimerico - bituminosa
IT. No.
Art. n.
5 LS/AC
Total Architectural - Totale Architettura
IIc Structural - IIc Strutturale
EXCAVATION TO ENLARGE THE AIR CONDESERS BASEMENT
Scavo per allargamento basamento dei condensatori ad aria
IT. No.
Art. n.
1 LS/AC
CONSTRUCTION REINFORCED CONCRETE BASEMENT AND PERIMETER
WALL
Costruzione del basamento in cemento armato e del muretto perimetrale
IT. No.
Art. n.
2 LS/AC
Total Structural - Totale Strutturale
TOTAL PART II / Totale Parte II
FOR OFFICIAL USE ONLY Sheet 4 of 14
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
IIIa HVAC - IIIa HVAC
SUPPLY AND INSTALLATION OF OUTDOOR CHILLER CH-1 537kW
Fornitura ed installazione chiller CH-1 537kW
IT. No.
Art. n.
1 EA/NO
SUPPLY AND INSTALLATION OF OUTDOOR CHILLER CH-2 313kW WITH
FREE COOLING DEVICE
Fornitura ed installazione chiller CH-2 313kW WITH FREE COOLING DEVICE
IT. No.
Art. n.
2 EA/NO
CHILLERS PIPING CIRCUIT MODIFICATION, OUTSIDE THE MECHANICAL
ROOM. SUPPLY AND INSTALLATION OF SEAMLESS BLACK STEEL PIPES
UNI 10255 MEDIUM SERIES, HOT COATED WITH EPOXY POWDERS,
INSULATION ALUMINUM JACKET, GATE VALVES, BALANCING VALVE,
GLOBE CONTROL VALVE AND HEAT TRACE COMPLETATION.
Modifica delle tubazioni dei chiller fuori dalla centrale meccanica, con fornitura ed installazione di tubazione UNI 10255 serie media, verniciatura epossidica, completa di ogni accessorio isolamento e copertura in alluminio. Fornitura ed installazione di valvole manuali, valvole bilanciamento, valvola di controllo a globo e completamento di nastro scaldante
IT. No.
Art. n.
3 EA/NO
SUPPLY AND INSTALLATION OF CENTRIFUGAL PUMP P1A or P1B WITH
EXISTING PIPING SYSTEM ADJUSTMENT
Fornitura e posa in opera di pompa centrifuga P1A o P1B con adattamento delle tubazioni esistenti
IT. No.
Art. n.
4 EA/NO
SUPPLY AND INSTALLATION OF CRACU-1 OR CRACU-2 UNIT IN THE
TELEPHONE SWITCH ROOM, COMPLETE WITH INTERNAL AND
EXTERNAL CONDENSING UNIT
Fornitura ed installazione della CRACU-1 o CRACU-2 nella telephone room con unita' interna ed esterna
IT. No.
Art. n.
5 EA/NO
SUPPLY AND INSTALLATION OF CRACU-3 OR CRACU-4 UNIT IN THE
SIPRNET ROOM
Fornitura ed installazione della CRACU-3 o CRACU-4 nella SIPRnet room
IT. No.
Art. n.
6 EA/NO
SUPPLY AND INSTALLATION OF CRACU-5 OR CRACU-6 UNIT IN THE
NIPRNET ROOM
Fornitura ed installazione della CRACU-5 o CRACU-6 nella NIPRnet room
IT. No.
Art. n.
7 EA/NO
FOR OFFICIAL USE ONLY Sheet 5 of 14
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT
LINE COMPATIBLE FOR R410A REFRIGERANT GAS. INSULATED AND
COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE
BUILDING). DIAMETER 12,7MM
Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 12,7mm
IT. No.
Art. n.
8a LM/ML
FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT
LINE COMPATIBLE TO R410A REFRIGERANT GAS. INSULATED AND
COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE
BUILDING). DIAMETER 22,2MM
Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 22,2mm
IT. No.
Art. n.
8c LM/ML
FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT
LINE COMPATIBLE TO R410A REFRIGERANT GAS. INSULATED AND
COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE
BUILDING). DIAMETER 25,4MM
Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 25,4mm
IT. No.
Art. n.
8b LM/ML
FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT
LINE COMPATIBLE TO R410A REFRIGERANT GAS. INSULATED AND
COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE
BUILDING). DIAMETER 28,6MM
Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 28,6mm
IT. No.
Art. n.
8d LM/ML
GALVANIZED STEEL DUCT SYSTEM, SUPPORT SYSTEM INCLUDED.
Canalizzazioni in acciaio zincato compresi I supporti
IT. No.
Art. n.
9a
9b
9c
Kg/kg
FIBER GLASS DUCT SYSTEM INSULATION, 50mm, INCLUDING KRAFT
PAPERFIBER
Isolamento canalizzazioni con lana di vetro 50MM rivestita con carta kraft
IT. No.
Art. n.
10a
10b
10c
SM/MQ
ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 600X300
DiffusorI di mandata in alluminio compresi gli accessori 600x300
IT. No.
Art. n.
11a EA/NO
ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 600X200
DiffusorI di mandata in alluminio compresi gli accessori 600x200
IT. No.
Art. n.
11b EA/NO
FOR OFFICIAL USE ONLY Sheet 6 of 14
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 800X200
DiffusorI di mandata in alluminio compresi gli accessori 800x200
IT. No.
Art. n.
11c EA/NO
ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 750X300
DiffusorI di mandata in alluminio compresi gli accessori 750x300
IT. No.
Art. n.
11d EA/NO
AIR VOLUME DAMPERS SIZED UNTILL 800X300
Serranda di taratura dimensione fino a 800x300
IT. No.
Art. n.
12 EA/NO
CONFIGURATION AND VERIFICATION OF DDC SYSTEM FOR THE
EQUIPMENT REPLACED ACCORDING THE HONEYWELL SITUATION AND
DESIGN DRAWINGS AND TECHNICAL SPECIFICATION
Configurazione e verifica del sistema DDC per gli equipaggiamenti sostituiti in accordo con la situazione Honewywell, i disegni di progetto e specifiche
IT. No.
Art. n.
13 LS/AC
SUPPLY AND INSTALLATION OF EXHAUST FAN EF-1
Fornitura ed installazione dell'estrattore EF-1
IT. No.
Art. n.
14 LS/AC
SUPPLY AND INSTALLATION OF AC/CU UNIT IN THE UPS ROOM.
COOLING CAPACITY 25kW
Fornitura ed installazione di sistema AC/CU nel locale UPS
IT. No.
Art. n.
15 EA/NO
TESTING; ADJUSTING AND BALANCING OF THE HVAC SYSTEMS
Prove, tarature e bilanciamento impianti HVAC
IT. No.
Art. n.
16 LS/AC
Total HVAC - Totale HVAC
TOTAL PART III / Totale Parte III
FOR OFFICIAL USE ONLY Sheet 7 of 14
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART IV - ELECTRICAL WORK / Parte IV - Lavori Elettrici
SUPPLY AND INSTALLATION IN THE "TS" PANEL OF N.2 CIRCUIT
BREAKER 4P 125A- Idn 0,3A, AND #2 CIRCUIT BREAKERS 3P-4A WITH
THE GROUND FAULT PROTECTION 30mA
Fornitura ed intstallazione nel quadro "TS" di n°2 interruttori 125A 4P Idn 0,3A e di n°2 interruttori 3P-4A completi di protezione differenziale 30mA
IT. No.
Art. n.
1 EA/NO
CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING
LINE. CABLE FG16R16 0,6/1kV 1x240mmq
CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV
1x240mmq
IT. No.
Art. n.
2a LM/ML
CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING
LINE. CABLE FG16R16 0,6/1kV 1x120mmq
CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV
1x120mmq
IT. No.
Art. n.
2b
3a
LM/ML
CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING
LINE. CABLE FG16R16 0,6/1kV 1x70mmq
CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV
1x70mmq
IT. No.
Art. n.
3b LM/ML
CABLE TRAY 200x75MM WITH METALLIC COVER AND SUPPORT SYSTEM
FOR ELECTRICAL DISTRIBUTION.
Canalina elettrica metallica chiusa dimensioni 200x75mm con copertura metallica. Fornitura e posa in opera per la realizzazione della distribuzione impianti elettrici
IT. No.
Art. n.
2c
3c
7f
LM/ML
CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING
LINE. CABLE FG16M16 0,6/1kV 1x35mmq. CRACU1/2
CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV
1x35mmq. CRACU-1/2
IT. No.
Art. n.
7a LM/ML
CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING
LINE. CABLE FG16M16 0,6/1kV 1x16mmq. CRACU1/2
CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV
1x16mmq. CRACU1/2
IT. No.
Art. n.
7b LM/ML
SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.
CABLE FG16OM16 0,6/1kV 4x4mmq. EXT. CRACU-1/2
Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 4x4mmq.
EXT. CRACU-1/2
IT. No.
Art. n.
7c LM/ML
FOR OFFICIAL USE ONLY Sheet 8 of 14
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.
CABLE FG16OM16 0,6/1kV 3x2,5mmq.
Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 3x2,5mmq.
IT. No.
Art. n.
7d
7e
LM/ML
SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.
CABLE FG16OR16 0,6/1kV 5x4mmq.
Fornitura e posa in opera di cavi dorsali tipo FG16OR16 0.6/1 kV 5x4mmq.
AC/CU UNIT
IT. No.
Art. n.
4a LM/ML
SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.
CABLE FG16OM16 0,6/1kV 3x4mmq.
Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 3x4mmq.
AC/CU UNIT
IT. No.
Art. n.
4b LM/ML
SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.
CABLE FG16OR16 0,6/1kV 4x10mmq. PUMP P1A/P2A
Fornitura e posa in opera di cavi dorsali tipo FG16OR16 0.6/1 kV 4x10mmq
IT. No.
Art. n.
6a LM/ML
SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.
CABLE FG16OM16 0,6/1kV 5x6mmq. CRACU-3/4
Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 5x6mmq.
CRACU-3/4
IT. No.
Art. n.
9a LM/ML
SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.
CABLE FG16OM16 0,6/1kV 5x10mmq. CRACU-5/6
Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 5x10mmq.
CRACU-5/6
IT. No.
Art. n.
8a LM/ML
SUPPLY AND INSTALLATION OF EMT CONDUITS FOR ELECTRICAL
DISTRIBUTION D32. IP55
Fornitura e posa in opera di tubazioni ed accessori tubazioni metalliche per la realizzazione della distribuzione impianti elettrici. D32. IP55
IT. No.
Art. n.
4c
6b
7h
8b
9b
LM/ML
DISCONNECT SWITCH 4P-16A IP65
Sezionatore 4P-16A IP65
IT. No.
Art. n.
4d EA/NO
DISCONNECT SWITCH 3P-16A IP65
Sezionatore 3P-16A IP65
IT. No.
Art. n.
7g EA/NO
DISCONNECT SWITCH 2P-16A IP65
Sezionatore 2P-16A IP65
IT. No.
Art. n.
4e EA/NO
SUPPLY AND INSTALLATION IN THE "MRE" PANEL OF CIRCUIT BREAKER
, CONTACTORS, AND OTHER FOR PUMP P1A/P1B
Fornitura ed intstallazione nel quadro "MRE" di interruttori, contattori ed altro
IT. No.
Art. n.
5 LS/AC
FOR OFFICIAL USE ONLY Sheet 9 of 14
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
TESTING OF ELECTRIC, GROUNDING, EQUIPOTENTIAL, INSULATION OF
THE NEW SYSTEM
Test del sistema elettrico, messa a terra, continuità equipotenziale ed isolamento
IT. No.
Art. n.
10 LS/AC
TESTING OF FIRE ALARM SYSTEM ON THE CRACU. BEFORE AND AFTER
THE INSTALLATION
Test di funzionamento del sistema rilevazione incendi sulle CRACU prima e dopo l'intervento
IT. No.
Art. n.
2 LS/AC
Total electrical - Totale Elettrico
TOTAL PART IV / Totale Parte IV
SUSTAIN WORKS SUMMARY / Riepilogo Lavori di Manutenzione Evolutiva
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale
OR US DOLLARS (RATE 1$ = 0,9329€)
FOR OFFICIAL USE ONLY Sheet 10 of 14
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
B.
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Id Mechanical Demolitions - Id Demolizioni Meccaniche
REMOVAL OF EXISTING PRIMARY PUMP FOR THE CHILLED WATER
CIRCUITS (P2A AND P2B) AND RELATED CHILLED WATER PIPEWORK,
AND ALL OTHER SYSTEM ACCESSORIES AND FITTINGS,
Rimozione delle esistenti pompe per il primario del cicuito chiller (P2A e P2B) e relative tubazioni ed ogni altro sistema ed accessorio
IT. No.
Art. n.
1 LS/AC
REMOVAL OF CONTROLS IN MECHANICAL (PUMPS) ROOM AND IN THE
TELEPHONE SWITCH. NIPRNET, SIPRNET ROOMS
Rimozione dei controlli in sala meccanica (pompe) e nelle stanze telephone switch, NIPRnet, SIPRnet .
IT. No.
Art. n.
2 LS/AC
Total Mechanical Demolitions - Totale Demolizioni Meccaniche
Ie Electrical Demolition - Ia Demolizioni Impianti Elettrici
REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE PUMPS
REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione delle pompe (P2A
/ P2B)
IT. No.
Art. n.
1 LS/AC
Total Electrical Demolitions - Totale Demolizioni Elettriche
TOTAL PART I / Totale Parte I
REPAIR WORKS / Lavori di Ristrutturazione
FOR OFFICIAL USE ONLY Sheet 11 of 14
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
IIIa HVAC - IIIa HVAC
SUPPLY AND INSTALLATION OF CENTRIFUGAL PUMP P2A or P2B WITH
EXISTING PIPING SYSTEM ADJUSTMENT
Fornitura e posa in opera di pompa centrifuga P2A o P2B con adattamento delle tubazioni esistenti
IT. No.
Art. n.
1 EA/NO
SUPPLY AND INSTALLATION OF SPLIT SYSTEM FOR BATTERY ROOM.
24000 BTU/H
Fornitura ed installazione di split system per la battery room. 24000Btu/h
IT. No.
Art. n.
2 LS/AC
Total HVAC - Totale HVAC
TOTAL PART III / Totale Parte III
PART IV - ELECTRICAL WORK / Parte IV - Lavori Elettrici
SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.
CABLE FG16OR16 0,6/1kV 4x10mmq. PUMPS P1A/P2A
Fornitura e posa in opera di cavi dorsali tipo FG16OR16 0.6/1 kV 4x10mmq.
Pompe P1A/P2A
IT. No.
Art. n.
2a LM/ML
SUPPLY AND INSTALLATION OF EMT CONDUITS FOR ELECTRICAL
DISTRIBUTION D32. IP55 (PUMPS P2A/2B)
Fornitura e posa in opera di tubazioni ed accessori tubazioni metalliche per la realizzazione della distribuzione impianti elettrici. D32. IP55. Pompe (P2A/2B)
IT. No.
Art. n.
2b LM/ML
FOR OFFICIAL USE ONLY Sheet 12 of 14
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUPPLY AND INSTALLATION IN THE "MRE" PANEL OF CIRCUIT BREAKER,
CONTACTORS, AND OTHER FO PUMPS P2A/P2B
Fornitura ed intstallazione nel quadro "MRE" di interruttori, contattori ed inverter
15Kw per pompe P2A e P2B
IT. No.
Art. n.
2c
LS/AC
Total electrical - Totale Elettrico
TOTAL PART IV / Totale Parte IV
REPAIR WORKS SUMMARY / Riepilogo Lavori di Ristrutturazione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale
OR US DOLLARS (RATE 1$ = 0,9329€)
Total Summary / Riepilogo Complessivo
FOR OFFICIAL USE ONLY Sheet 13 of 14
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
A.
B.
SUB TOTAL A / Subtotale A
OR US DOLLARS (RATE 1$ = 0,9329€)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
TOTAL PRICE / Costo Totale
PART IV - ELECTRICAL WORK
SUB TOTAL B / Subtotale B
SUSTAIN WORKS / Lavori di Manutenzione Evolutiva
REPAIR WORKS / Lavori di Ristrutturazione
PART III - MECHANICAL WORK
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
FOR OFFICIAL USE ONLY Sheet 14 of 14
ASHE 18-1025 - RENOVATE/EXPAD FAC.939 FOR EOD - AREA F
INSTRUCTIONS FOR COMPLETING AF FORM 3052
TOTAL MATERIAL COSTS € 0,00 $ 0,00
TOTAL LABOR COSTS € 0,00 $ 0,00
TOTAL OTHER DIRECT COSTS € 0,00 $ 0,00
TOTAL DIRECT COSTS € 0,00 $ 0,00
OVERHEAD % € 0,00 $ 0,00
SUBTOTAL € 0,00 $ 0,00
PROFIT % € 0,00 $ 0,00
TOTAL PRICE € 0,00 $ 0,00
DATE FIRM NAME
TITLE BY
INSTRUCTIONS TO OFFERORS
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.
Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
File details come from the government source that posted it.