ASHE_18-1018_CCEB_REV._01.pdf

PDF 392 KB Posted

Attached to
Repair HVAC Bldg 1442 Federal contract opportunity
Solicitation number
FA568218R0046
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

CCEB Rev. 01

View the file

Other files for this federal contract opportunity

Other files attached to Repair HVAC Bldg 1442, newest first.
File Type Posted
ASHE_18-1018_CCEB_R3.xlsx XLSX spreadsheet
FA568218R00460003.pdf PDF
Attachment_4_Master_Technical_Specs_Nov_2005_English.zip ZIP file
Attachment_3_Additional_Requirements,_May_2018.pdf PDF
ASHE_18-1018_CCEB_R2.xlsx XLSX spreadsheet
FA568218R00460002.pdf PDF
ASHE_18-1018_Tech_Specs_Rev.2.pdf PDF
FA568218R0046.pdf PDF
ASHE_18-1018_Tech_Specs_Rev.01.pdf PDF
FA568218R00460001.pdf PDF
ASHE_18-1018_CCEB_R2.xlsx XLSX spreadsheet
Drawings.zip ZIP file
ASHE_18-1018_TECH_SPECS.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON

31st CES/CENM PROJECT MANAGEMENT ELEMENT

Prepared and Submitted by:

Engineering Tools srl Via del Makò, 33 - 33084 Cordenons (PN)

Tel. +39 0434 536333; Fax +39 0434 542813 Email: info@engtools.eu

PROJECT ASHE 18-1018

A/E CONTRACT No. FA5682-17-D-0006; D.O. 0024

REPAIR HVAC SYSTEM FAC.1442

AREA F – AVIANO AB, ITALY

CONSTRUCTION COST ESTIMATE

SUBMITTAL: FINAL (100% design) – Rev.01

Date: July the 3rd, 2018

PROJECT: ASHE 18-1018

REPAIR HVAC SYSTEM FAC. 1442

FINAL (100%)

THIS PAGE LEFT INTENTIONNALLY BLANK

FOR OFFICIAL USE ONLY

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

A.

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ib Structural Demolitions - Ib Demolizioni Strutturali

DEMOLITION AND REMOVAL OF EXTERIOR WALL AT THE BACK OF THE

BUILDING. CANOPY INCLUDED

Demolizione e rimozione del muro esterno dietro l'edificio. Compresa la demolizione della passerella

IT. No.

Art. n.

1 LS/AC

Total Structural Demolitions - Totale Demolizioni Strutturali

Id Mechanical Demolitions - Id Demolizioni Meccaniche

REMOVAL OF EXISTING WATER CHILLERS (ABOUT 221KW AND 422KW)

AND DRY COOLER AND RELATED CHILLED WATER PIPEWORK,

CONTROLS ETC.

Rimozione dei chiller di circa 221kW e 422kW e del dry cooler e delle relative tubazioni, controlli, etc.

IT. No.

Art. n.

2 LS/AC

REMOVAL OF EXISTING PRIMARY PUMP FOR THE CHILLED WATER

CIRCUITS (P1A AND P1B) AND RELATED CHILLED WATER PIPEWORK,

AND ALL OTHER SYSTEM ACCESSORIES AND FITTINGS,

Rimozione delle esistenti pompe per il primario del cicuito chiller (P1A e P1B) e relative tubazioni ed ogni altro sistema ed accessorio

IT. No.

Art. n.

3 LS/AC

REMOVAL OF EXISTING CLOSE CONTROL UNITS (DX UNITS) IN THE

TELEPHONE SWITCH ROOM INCLUDED EVERY ASSOCIATED SYSTEM.

INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE

NECESSARY. CRACU-1 AND CRACU-2.

Rimozione delle esistenti unità di condizionamento ad espansione diretta nella telephone switch room inclusi ogni sistema associato. Incluso noleggio sistemi di raffreddamento ove necessario. CRACU-1 e CRACU-2

IT. No.

Art. n.

4 LS/AC

SUSTAIN WORKS / Lavori di Manutenzione Evolutiva

FOR OFFICIAL USE ONLY Sheet 1 of 14

GOVERNMENT COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

REMOVAL OF EXISTING CHILLED WATER CLOSE CONTROL UNITS IN

THE SIPRNET ROOM INCLUDED EVERY ASSOCIATED SYSTEM.

INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE

NECESSARY. CRACU-3 AND CRACU-4.

Rimozione delle esistenti unità di condizionamento ad acqua refrigerata nella

SIPRnet room. Inclusi ogni sistema associato. Incluso il noleggio di sistemi di raffreddamento ove necessario. CRACU-3 e CRACU-4

IT. No.

Art. n.

6 LS/AC

REMOVAL OF EXISTING CHILLED WATER CLOSE CONTROL UNITS IN

THE NIPRNET ROOM INCLUDED EVERY ASSOCIATED SYSTEM.

INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE

NECESSARY. CRACU-5 AND CRACU-6.

Rimozione delle esistenti unità di condizionamento ad acqua refrigerata nella

NIPRnet room. Inclusi ogni sistema associato. Incluso il noleggio di sistemi di raffreddamento ove necessario. CRACU-5 e CRACU-6

IT. No.

Art. n.

5 LS/AC

REMOVAL OF EXISTING DX UNITS IN UPS ROOM INCLUDED THE

RENTING OF COOLING EQUIPMENT WHERE NECESSARY

Rimozione delle esistenti unità di condizionamento ad espansione diretta nella

UPS room. Inclusi ogni sistema associato. Incluso il noleggio di sistemi di raffreddamento ove necessario.

IT. No.

Art. n.

7 LS/AC

REMOVAL OF CONTROLS (FOR REINSTALLATION AFTER EQUIPMENT

REPLACEMENT) ON THE CHILLERS EQUIPMENT, IN MECHANICAL

(PUMPS) ROOM AND IN THE TELEPHONE SWITCH, NIPRNET, SIPRNET

ROOMS

Rimozione dei controlli (per reinstallazione dopo sostituzione equipaggiamento) su chiller, in sala meccanica (pompe) e nelle stanze telephone switch, NIPRnet, SIPRnet .

IT. No.

Art. n.

8 LS/AC

Total Mechanical Demolitions - Totale Demolizioni Meccaniche

Ie Electrical Demolition - Ia Demolizioni Impianti Elettrici

REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE PUMPS

REPLACEMENT

Rimozione degli impianti elettrici esistenti per la sostituzione delle pompe (P1A

/ P1B )

IT. No.

Art. n.

9 LS/AC

FOR OFFICIAL USE ONLY Sheet 2 of 14

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CHILLERS

REPLACEMENT

Rimozione degli impianti elettrici esistenti per la sostituzione dei chillers

IT. No.

Art. n.

10 LS/AC

REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CRACU-1/2

REPLACEMENT

Rimozione degli impianti elettrici esistenti per la sostituzione dei cracu-1/2

IT. No.

Art. n.

11 LS/AC

REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CRACU-3/4

REPLACEMENT

Rimozione degli impianti elettrici esistenti per la sostituzione dei cracu-3/4

IT. No.

Art. n.

13 LS/AC

REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CRACU-5/6

REPLACEMENT

Rimozione degli impianti elettrici esistenti per la sostituzione dei cracu-5/6

IT. No.

Art. n.

12 LS/AC

REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE DX UNIT IN

THE UPS ROOM REPLACEMENT

Rimozione degli impianti elettrici esistenti per la sostituzione delle unita' ad espanzione diretta nel locale UPS

IT. No.

Art. n.

14 LS/AC

Total Electrical Demolitions - Totale Demolizioni Elettriche

TOTAL PART I / Totale Parte I

FOR OFFICIAL USE ONLY Sheet 3 of 14

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili

IIb Architectural - IIb Architettonico

SUPPLY AND INSTALLATION OF METAL FENCE

Fornitura ed installazione di recinzione metallica

IT. No.

Art. n.

1 LS/AC

SUPPLY AND INSTALLATION OF METAL FLASHINGS TO COVER THE NEW

PERIMETRAL WALL

Fornitura ed installazione di lattoneria per coprire il nuovo muretto perimetrale

IT. No.

Art. n.

2 LS/AC

REPAIR EXTERIOR PLASTER

Riparare intonaco esterno

IT. No.

Art. n.

4 LS/AC

PAINTING OF EXTERIOR WALL SURFACE

Pittura esterna

IT. No.

Art. n.

3 LS/AC

SUPPLY AND INSTALLATION OF POLYMERIC-BITUMINOUS

WATERPROOF SHEATH

Fornitura e posa in opera d guaina polimerico - bituminosa

IT. No.

Art. n.

5 LS/AC

Total Architectural - Totale Architettura

IIc Structural - IIc Strutturale

EXCAVATION TO ENLARGE THE AIR CONDESERS BASEMENT

Scavo per allargamento basamento dei condensatori ad aria

IT. No.

Art. n.

1 LS/AC

CONSTRUCTION REINFORCED CONCRETE BASEMENT AND PERIMETER

WALL

Costruzione del basamento in cemento armato e del muretto perimetrale

IT. No.

Art. n.

2 LS/AC

Total Structural - Totale Strutturale

TOTAL PART II / Totale Parte II

FOR OFFICIAL USE ONLY Sheet 4 of 14

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici

IIIa HVAC - IIIa HVAC

SUPPLY AND INSTALLATION OF OUTDOOR CHILLER CH-1 537kW

Fornitura ed installazione chiller CH-1 537kW

IT. No.

Art. n.

1 EA/NO

SUPPLY AND INSTALLATION OF OUTDOOR CHILLER CH-2 313kW WITH

FREE COOLING DEVICE

Fornitura ed installazione chiller CH-2 313kW WITH FREE COOLING DEVICE

IT. No.

Art. n.

2 EA/NO

CHILLERS PIPING CIRCUIT MODIFICATION, OUTSIDE THE MECHANICAL

ROOM. SUPPLY AND INSTALLATION OF SEAMLESS BLACK STEEL PIPES

UNI 10255 MEDIUM SERIES, HOT COATED WITH EPOXY POWDERS,

INSULATION ALUMINUM JACKET, GATE VALVES, BALANCING VALVE,

GLOBE CONTROL VALVE AND HEAT TRACE COMPLETATION.

Modifica delle tubazioni dei chiller fuori dalla centrale meccanica, con fornitura ed installazione di tubazione UNI 10255 serie media, verniciatura epossidica, completa di ogni accessorio isolamento e copertura in alluminio. Fornitura ed installazione di valvole manuali, valvole bilanciamento, valvola di controllo a globo e completamento di nastro scaldante

IT. No.

Art. n.

3 EA/NO

SUPPLY AND INSTALLATION OF CENTRIFUGAL PUMP P1A or P1B WITH

EXISTING PIPING SYSTEM ADJUSTMENT

Fornitura e posa in opera di pompa centrifuga P1A o P1B con adattamento delle tubazioni esistenti

IT. No.

Art. n.

4 EA/NO

SUPPLY AND INSTALLATION OF CRACU-1 OR CRACU-2 UNIT IN THE

TELEPHONE SWITCH ROOM, COMPLETE WITH INTERNAL AND

EXTERNAL CONDENSING UNIT

Fornitura ed installazione della CRACU-1 o CRACU-2 nella telephone room con unita' interna ed esterna

IT. No.

Art. n.

5 EA/NO

SUPPLY AND INSTALLATION OF CRACU-3 OR CRACU-4 UNIT IN THE

SIPRNET ROOM

Fornitura ed installazione della CRACU-3 o CRACU-4 nella SIPRnet room

IT. No.

Art. n.

6 EA/NO

SUPPLY AND INSTALLATION OF CRACU-5 OR CRACU-6 UNIT IN THE

NIPRNET ROOM

Fornitura ed installazione della CRACU-5 o CRACU-6 nella NIPRnet room

IT. No.

Art. n.

7 EA/NO

FOR OFFICIAL USE ONLY Sheet 5 of 14

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT

LINE COMPATIBLE FOR R410A REFRIGERANT GAS. INSULATED AND

COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE

BUILDING). DIAMETER 12,7MM

Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 12,7mm

IT. No.

Art. n.

8a LM/ML

FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT

LINE COMPATIBLE TO R410A REFRIGERANT GAS. INSULATED AND

COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE

BUILDING). DIAMETER 22,2MM

Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 22,2mm

IT. No.

Art. n.

8c LM/ML

FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT

LINE COMPATIBLE TO R410A REFRIGERANT GAS. INSULATED AND

COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE

BUILDING). DIAMETER 25,4MM

Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 25,4mm

IT. No.

Art. n.

8b LM/ML

FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT

LINE COMPATIBLE TO R410A REFRIGERANT GAS. INSULATED AND

COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE

BUILDING). DIAMETER 28,6MM

Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 28,6mm

IT. No.

Art. n.

8d LM/ML

GALVANIZED STEEL DUCT SYSTEM, SUPPORT SYSTEM INCLUDED.

Canalizzazioni in acciaio zincato compresi I supporti

IT. No.

Art. n.

9a

9b

9c

Kg/kg

FIBER GLASS DUCT SYSTEM INSULATION, 50mm, INCLUDING KRAFT

PAPERFIBER

Isolamento canalizzazioni con lana di vetro 50MM rivestita con carta kraft

IT. No.

Art. n.

10a

10b

10c

SM/MQ

ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 600X300

DiffusorI di mandata in alluminio compresi gli accessori 600x300

IT. No.

Art. n.

11a EA/NO

ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 600X200

DiffusorI di mandata in alluminio compresi gli accessori 600x200

IT. No.

Art. n.

11b EA/NO

FOR OFFICIAL USE ONLY Sheet 6 of 14

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 800X200

DiffusorI di mandata in alluminio compresi gli accessori 800x200

IT. No.

Art. n.

11c EA/NO

ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 750X300

DiffusorI di mandata in alluminio compresi gli accessori 750x300

IT. No.

Art. n.

11d EA/NO

AIR VOLUME DAMPERS SIZED UNTILL 800X300

Serranda di taratura dimensione fino a 800x300

IT. No.

Art. n.

12 EA/NO

CONFIGURATION AND VERIFICATION OF DDC SYSTEM FOR THE

EQUIPMENT REPLACED ACCORDING THE HONEYWELL SITUATION AND

DESIGN DRAWINGS AND TECHNICAL SPECIFICATION

Configurazione e verifica del sistema DDC per gli equipaggiamenti sostituiti in accordo con la situazione Honewywell, i disegni di progetto e specifiche

IT. No.

Art. n.

13 LS/AC

SUPPLY AND INSTALLATION OF EXHAUST FAN EF-1

Fornitura ed installazione dell'estrattore EF-1

IT. No.

Art. n.

14 LS/AC

SUPPLY AND INSTALLATION OF AC/CU UNIT IN THE UPS ROOM.

COOLING CAPACITY 25kW

Fornitura ed installazione di sistema AC/CU nel locale UPS

IT. No.

Art. n.

15 EA/NO

TESTING; ADJUSTING AND BALANCING OF THE HVAC SYSTEMS

Prove, tarature e bilanciamento impianti HVAC

IT. No.

Art. n.

16 LS/AC

Total HVAC - Totale HVAC

TOTAL PART III / Totale Parte III

FOR OFFICIAL USE ONLY Sheet 7 of 14

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART IV - ELECTRICAL WORK / Parte IV - Lavori Elettrici

SUPPLY AND INSTALLATION IN THE "TS" PANEL OF N.2 CIRCUIT

BREAKER 4P 125A- Idn 0,3A, AND #2 CIRCUIT BREAKERS 3P-4A WITH

THE GROUND FAULT PROTECTION 30mA

Fornitura ed intstallazione nel quadro "TS" di n°2 interruttori 125A 4P Idn 0,3A e di n°2 interruttori 3P-4A completi di protezione differenziale 30mA

IT. No.

Art. n.

1 EA/NO

CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING

LINE. CABLE FG16R16 0,6/1kV 1x240mmq

CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV

1x240mmq

IT. No.

Art. n.

2a LM/ML

CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING

LINE. CABLE FG16R16 0,6/1kV 1x120mmq

CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV

1x120mmq

IT. No.

Art. n.

2b

3a

LM/ML

CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING

LINE. CABLE FG16R16 0,6/1kV 1x70mmq

CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV

1x70mmq

IT. No.

Art. n.

3b LM/ML

CABLE TRAY 200x75MM WITH METALLIC COVER AND SUPPORT SYSTEM

FOR ELECTRICAL DISTRIBUTION.

Canalina elettrica metallica chiusa dimensioni 200x75mm con copertura metallica. Fornitura e posa in opera per la realizzazione della distribuzione impianti elettrici

IT. No.

Art. n.

2c

3c

7f

LM/ML

CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING

LINE. CABLE FG16M16 0,6/1kV 1x35mmq. CRACU1/2

CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV

1x35mmq. CRACU-1/2

IT. No.

Art. n.

7a LM/ML

CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING

LINE. CABLE FG16M16 0,6/1kV 1x16mmq. CRACU1/2

CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV

1x16mmq. CRACU1/2

IT. No.

Art. n.

7b LM/ML

SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.

CABLE FG16OM16 0,6/1kV 4x4mmq. EXT. CRACU-1/2

Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 4x4mmq.

EXT. CRACU-1/2

IT. No.

Art. n.

7c LM/ML

FOR OFFICIAL USE ONLY Sheet 8 of 14

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.

CABLE FG16OM16 0,6/1kV 3x2,5mmq.

Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 3x2,5mmq.

IT. No.

Art. n.

7d

7e

LM/ML

SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.

CABLE FG16OR16 0,6/1kV 5x4mmq.

Fornitura e posa in opera di cavi dorsali tipo FG16OR16 0.6/1 kV 5x4mmq.

AC/CU UNIT

IT. No.

Art. n.

4a LM/ML

SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.

CABLE FG16OM16 0,6/1kV 3x4mmq.

Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 3x4mmq.

AC/CU UNIT

IT. No.

Art. n.

4b LM/ML

SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.

CABLE FG16OR16 0,6/1kV 4x10mmq. PUMP P1A/P2A

Fornitura e posa in opera di cavi dorsali tipo FG16OR16 0.6/1 kV 4x10mmq

IT. No.

Art. n.

6a LM/ML

SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.

CABLE FG16OM16 0,6/1kV 5x6mmq. CRACU-3/4

Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 5x6mmq.

CRACU-3/4

IT. No.

Art. n.

9a LM/ML

SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.

CABLE FG16OM16 0,6/1kV 5x10mmq. CRACU-5/6

Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 5x10mmq.

CRACU-5/6

IT. No.

Art. n.

8a LM/ML

SUPPLY AND INSTALLATION OF EMT CONDUITS FOR ELECTRICAL

DISTRIBUTION D32. IP55

Fornitura e posa in opera di tubazioni ed accessori tubazioni metalliche per la realizzazione della distribuzione impianti elettrici. D32. IP55

IT. No.

Art. n.

4c

6b

7h

8b

9b

LM/ML

DISCONNECT SWITCH 4P-16A IP65

Sezionatore 4P-16A IP65

IT. No.

Art. n.

4d EA/NO

DISCONNECT SWITCH 3P-16A IP65

Sezionatore 3P-16A IP65

IT. No.

Art. n.

7g EA/NO

DISCONNECT SWITCH 2P-16A IP65

Sezionatore 2P-16A IP65

IT. No.

Art. n.

4e EA/NO

SUPPLY AND INSTALLATION IN THE "MRE" PANEL OF CIRCUIT BREAKER

, CONTACTORS, AND OTHER FOR PUMP P1A/P1B

Fornitura ed intstallazione nel quadro "MRE" di interruttori, contattori ed altro

IT. No.

Art. n.

5 LS/AC

FOR OFFICIAL USE ONLY Sheet 9 of 14

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

TESTING OF ELECTRIC, GROUNDING, EQUIPOTENTIAL, INSULATION OF

THE NEW SYSTEM

Test del sistema elettrico, messa a terra, continuità equipotenziale ed isolamento

IT. No.

Art. n.

10 LS/AC

TESTING OF FIRE ALARM SYSTEM ON THE CRACU. BEFORE AND AFTER

THE INSTALLATION

Test di funzionamento del sistema rilevazione incendi sulle CRACU prima e dopo l'intervento

IT. No.

Art. n.

2 LS/AC

Total electrical - Totale Elettrico

TOTAL PART IV / Totale Parte IV

SUSTAIN WORKS SUMMARY / Riepilogo Lavori di Manutenzione Evolutiva

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

PART III - MECHANICAL WORK

PART IV - ELECTRICAL WORK

TOTAL PRICE / Costo Totale

OR US DOLLARS (RATE 1$ = 0,9329€)

FOR OFFICIAL USE ONLY Sheet 10 of 14

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

B.

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Id Mechanical Demolitions - Id Demolizioni Meccaniche

REMOVAL OF EXISTING PRIMARY PUMP FOR THE CHILLED WATER

CIRCUITS (P2A AND P2B) AND RELATED CHILLED WATER PIPEWORK,

AND ALL OTHER SYSTEM ACCESSORIES AND FITTINGS,

Rimozione delle esistenti pompe per il primario del cicuito chiller (P2A e P2B) e relative tubazioni ed ogni altro sistema ed accessorio

IT. No.

Art. n.

1 LS/AC

REMOVAL OF CONTROLS IN MECHANICAL (PUMPS) ROOM AND IN THE

TELEPHONE SWITCH. NIPRNET, SIPRNET ROOMS

Rimozione dei controlli in sala meccanica (pompe) e nelle stanze telephone switch, NIPRnet, SIPRnet .

IT. No.

Art. n.

2 LS/AC

Total Mechanical Demolitions - Totale Demolizioni Meccaniche

Ie Electrical Demolition - Ia Demolizioni Impianti Elettrici

REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE PUMPS

REPLACEMENT

Rimozione degli impianti elettrici esistenti per la sostituzione delle pompe (P2A

/ P2B)

IT. No.

Art. n.

1 LS/AC

Total Electrical Demolitions - Totale Demolizioni Elettriche

TOTAL PART I / Totale Parte I

REPAIR WORKS / Lavori di Ristrutturazione

FOR OFFICIAL USE ONLY Sheet 11 of 14

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici

IIIa HVAC - IIIa HVAC

SUPPLY AND INSTALLATION OF CENTRIFUGAL PUMP P2A or P2B WITH

EXISTING PIPING SYSTEM ADJUSTMENT

Fornitura e posa in opera di pompa centrifuga P2A o P2B con adattamento delle tubazioni esistenti

IT. No.

Art. n.

1 EA/NO

SUPPLY AND INSTALLATION OF SPLIT SYSTEM FOR BATTERY ROOM.

24000 BTU/H

Fornitura ed installazione di split system per la battery room. 24000Btu/h

IT. No.

Art. n.

2 LS/AC

Total HVAC - Totale HVAC

TOTAL PART III / Totale Parte III

PART IV - ELECTRICAL WORK / Parte IV - Lavori Elettrici

SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE.

CABLE FG16OR16 0,6/1kV 4x10mmq. PUMPS P1A/P2A

Fornitura e posa in opera di cavi dorsali tipo FG16OR16 0.6/1 kV 4x10mmq.

Pompe P1A/P2A

IT. No.

Art. n.

2a LM/ML

SUPPLY AND INSTALLATION OF EMT CONDUITS FOR ELECTRICAL

DISTRIBUTION D32. IP55 (PUMPS P2A/2B)

Fornitura e posa in opera di tubazioni ed accessori tubazioni metalliche per la realizzazione della distribuzione impianti elettrici. D32. IP55. Pompe (P2A/2B)

IT. No.

Art. n.

2b LM/ML

FOR OFFICIAL USE ONLY Sheet 12 of 14

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

SUPPLY AND INSTALLATION IN THE "MRE" PANEL OF CIRCUIT BREAKER,

CONTACTORS, AND OTHER FO PUMPS P2A/P2B

Fornitura ed intstallazione nel quadro "MRE" di interruttori, contattori ed inverter

15Kw per pompe P2A e P2B

IT. No.

Art. n.

2c

LS/AC

Total electrical - Totale Elettrico

TOTAL PART IV / Totale Parte IV

REPAIR WORKS SUMMARY / Riepilogo Lavori di Ristrutturazione

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

PART III - MECHANICAL WORK

PART IV - ELECTRICAL WORK

TOTAL PRICE / Costo Totale

OR US DOLLARS (RATE 1$ = 0,9329€)

Total Summary / Riepilogo Complessivo

FOR OFFICIAL USE ONLY Sheet 13 of 14

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM FAC. 1442

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 18-1018 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

A.

B.

SUB TOTAL A / Subtotale A

OR US DOLLARS (RATE 1$ = 0,9329€)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

TOTAL PRICE / Costo Totale

PART IV - ELECTRICAL WORK

SUB TOTAL B / Subtotale B

SUSTAIN WORKS / Lavori di Manutenzione Evolutiva

REPAIR WORKS / Lavori di Ristrutturazione

PART III - MECHANICAL WORK

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

PART III - MECHANICAL WORK

PART IV - ELECTRICAL WORK

FOR OFFICIAL USE ONLY Sheet 14 of 14

ASHE 18-1025 - RENOVATE/EXPAD FAC.939 FOR EOD - AREA F

INSTRUCTIONS FOR COMPLETING AF FORM 3052

TOTAL MATERIAL COSTS € 0,00 $ 0,00

TOTAL LABOR COSTS € 0,00 $ 0,00

TOTAL OTHER DIRECT COSTS € 0,00 $ 0,00

TOTAL DIRECT COSTS € 0,00 $ 0,00

OVERHEAD % € 0,00 $ 0,00

SUBTOTAL € 0,00 $ 0,00

PROFIT % € 0,00 $ 0,00

TOTAL PRICE € 0,00 $ 0,00

DATE FIRM NAME

TITLE BY

INSTRUCTIONS TO OFFERORS

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.

Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

File details come from the government source that posted it.