ASHE_18-1018_CCEB_R2.xlsx
XLSX spreadsheet 81 KB Posted
- Attached to
- Repair HVAC Bldg 1442 Federal contract opportunity
- Solicitation number
- FA568218R0046
About this file
CCEB Rev 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA568218R00460003.pdf | ||
| ASHE_18-1018_CCEB_R3.xlsx | XLSX spreadsheet | |
| Attachment_4_Master_Technical_Specs_Nov_2005_English.zip | ZIP file | |
| Attachment_3_Additional_Requirements,_May_2018.pdf | ||
| FA568218R00460002.pdf | ||
| ASHE_18-1018_Tech_Specs_Rev.2.pdf | ||
| ASHE_18-1018_Tech_Specs_Rev.01.pdf | ||
| FA568218R00460001.pdf | ||
| FA568218R0046.pdf | ||
| ASHE_18-1018_CCEB_REV._01.pdf | ||
| Drawings.zip | ZIP file | |
| ASHE_18-1018_TECH_SPECS.pdf | ||
| ASHE_18-1018_CCEB_R2.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASHE 18-1018
| CONSTRUCTION COST ESTIMATE BREAKDOWN REV 2 | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIR HVAC SYSTEM FAC. 1442 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| ASHE 18-1018 | AREA F, AVIANO AIR BASE, ITALY | |||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| SUSTAIN WORKS / Lavori di Manutenzione | ||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||
| Ib Architectural Demolition - Ib Demolizioni Architettoniche | ||||
| 1 | DEMOLITION AND REMOVAL OF EXTERIOR WALL AT THE BACK OF THE BUILDING. CANOPY INCLUDED | |||
| Demolizione e rimozione del muro esterno dietro l'edificio. Compresa la demolizione della passerella | IT. No. Art. n. | 1 | LS/AC | 1.00 |
| Total Architectural Demolition - Totale Demolizioni Architettoniche |
| Id Mechanical Demolitions - Id Demolizioni Meccaniche | ||||
| 2 | REMOVAL OF EXISTING WATER CHILLERS (ABOUT 221KW AND 422KW) AND DRY COOLER AND RELATED CHILLED WATER PIPEWORK, CONTROLS ETC. | |||
| Rimozione dei chiller di circa 221kW e 422kW e del dry cooler e delle relative tubazioni, controlli, etc. | IT. No. Art. n. | 1 | LS/AC | 1.00 |
| 3 | REMOVAL OF EXISTING PRIMARY PUMP FOR THE CHILLED WATER CIRCUITS (P1A AND P1B) AND RELATED CHILLED WATER PIPEWORK, AND ALL OTHER SYSTEM ACCESSORIES AND FITTINGS, | |||
| Rimozione delle esistenti pompe per il primario del cicuito chiller (P1A e P1B) e relative tubazioni ed ogni altro sistema ed accessorio | IT. No. Art. n. | 2 | LS/AC | 1.00 |
| 4 | REMOVAL OF EXISTING CLOSE CONTROL UNITS (DX UNITS) IN THE TELEPHONE SWITCH ROOM INCLUDED EVERY ASSOCIATED SYSTEM. INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE NECESSARY. CRACU-1 AND CRACU-2. | |||
| Rimozione delle esistenti unità di condizionamento ad espansione diretta nella telephone switch room inclusi ogni sistema associato. Incluso noleggio sistemi di raffreddamento ove necessario. CRACU-1 e CRACU-2 | IT. No. Art. n. | 3 | LS/AC | 1.00 |
| 5 | REMOVAL OF EXISTING CHILLED WATER CLOSE CONTROL UNITS IN THE SIPRNET ROOM INCLUDED EVERY ASSOCIATED SYSTEM. INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE NECESSARY. CRACU-3 AND CRACU-4. | |||
| Rimozione delle esistenti unità di condizionamento ad acqua refrigerata nella SIPRnet room. Inclusi ogni sistema associato. Incluso il noleggio di sistemi di raffreddamento ove necessario. CRACU-3 e CRACU-4 | IT. No. Art. n. | 4 | LS/AC | 1.00 |
| 6 | REMOVAL OF EXISTING CHILLED WATER CLOSE CONTROL UNITS IN THE NIPRNET ROOM INCLUDED EVERY ASSOCIATED SYSTEM. INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE NECESSARY. CRACU-5 AND CRACU-6. | |||
| Rimozione delle esistenti unità di condizionamento ad acqua refrigerata nella NIPRnet room. Inclusi ogni sistema associato. Incluso il noleggio di sistemi di raffreddamento ove necessario. CRACU-5 e CRACU-6 | IT. No. Art. n. | 5 | LS/AC | 1.00 |
| 7 | REMOVAL OF EXISTING DX UNITS IN UPS ROOM INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE NECESSARY | |||
| Rimozione delle esistenti unità di condizionamento ad espansione diretta nella UPS room. Inclusi ogni sistema associato. Incluso il noleggio di sistemi di raffreddamento ove necessario. | IT. No. Art. n. | 6 | LS/AC | 1.00 |
| 8 | REMOVAL OF CONTROLS (FOR REINSTALLATION AFTER EQUIPMENT REPLACEMENT) ON THE CHILLERS EQUIPMENT, IN MECHANICAL (PUMPS) ROOM AND IN THE TELEPHONE SWITCH, NIPRNET, SIPRNET ROOMS | |||
| Rimozione dei controlli (per reinstallazione dopo sostituzione equipaggiamento) su chiller, in sala meccanica (pompe) e nelle stanze telephone switch, NIPRnet, SIPRnet . | IT. No. Art. n. | 7 | LS/AC | 1.00 |
| Total Mechanical Demolitions - Totale Demolizioni Meccaniche |
| Ie Electrical Demolition - Ia Demolizioni Impianti Elettrici | ||||
| 9 | REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE PUMPS REPLACEMENT | |||
| Rimozione degli impianti elettrici esistenti per la sostituzione delle pompe (P1A / P1B / P2A / P2B) | IT. No. Art. n. | 1 | LS/AC | 1.00 |
| 10 | REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE PUMPS REPLACEMENT | |||
| Rimozione degli impianti elettrici esistenti per la sostituzione delle pompe (P1A / P1B / P2A / P2B) | IT. No. Art. n. | 2 | LS/AC | 1.00 |
| 11 | REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CHILLERS REPLACEMENT | |||
| Rimozione degli impianti elettrici esistenti per la sostituzione dei chillers | IT. No. Art. n. | 3 | LS/AC | 1.00 |
| 12 | REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CRACU-1/2 REPLACEMENT | |||
| Rimozione degli impianti elettrici esistenti per la sostituzione dei cracu-1/2 | IT. No. Art. n. | 4 | LS/AC | 1.00 |
| 13 | REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CRACU-3/4 REPLACEMENT | |||
| Rimozione degli impianti elettrici esistenti per la sostituzione dei cracu-3/4 | IT. No. Art. n. | 5 | LS/AC | 1.00 |
| 14 | REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CRACU-5/6 REPLACEMENT | |||
| Rimozione degli impianti elettrici esistenti per la sostituzione dei cracu-5/6 | IT. No. Art. n. | 6 | LS/AC | 1.00 |
| 15 | REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE DX UNIT IN THE UPS ROOM REPLACEMENT | |||
| Rimozione degli impianti elettrici esistenti per la sostituzione delle unita' ad espanzione diretta nel locale UPS | IT. No. Art. n. | 7 | LS/AC | 1.00 |
| 16 | REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE DX UNIT IN THE UPS ROOM REPLACEMENT | |||
| Rimozione degli impianti elettrici esistenti per la sostituzione delle unita' ad espanzione diretta nel locale UPS | IT. No. Art. n. | 8 | LS/AC | 1.00 |
| Total Electrical Demolitions - Totale Demolizioni Elettriche |
TOTAL PART I / Totale Parte I
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili | ||||
| IIb Architectural - IIb Architettonico | ||||
| 17 | SUPPLY AND INSTALLATION OF METAL FENCE | |||
| Fornitura ed installazione di recinzione metallica | IT. No. Art. n. | 1 | LS/AC | 1.00 |
| 18 | SUPPLY AND INSTALLATION OF METAL FLASHINGS TO COVER THE NEW PERIMETRAL WALL | |||
| Fornitura ed installazione di lattoneria per coprire il nuovo muretto perimetrale | IT. No. Art. n. | 2 | LS/AC | 1.00 |
| 19 | REPAIR EXTERIOR PLASTER | |||
| Riparare intonaco esterno | IT. No. Art. n. | 3 | LS/AC | 1.00 |
| 20 | PAINTING OF EXTERIOR WALL SURFACE | |||
| Pittura esterna | IT. No. Art. n. | 4 | LS/AC | 1.00 |
| 21 | SUPPLY AND INSTALLATION OF POLYMERIC-BITUMINOUS WATERPROOF SHEATH | |||
| Fornitura e posa in opera d guaina polimerico - bituminosa | IT. No. Art. n. | 5 | LS/AC | 1.00 |
| Total Architectural - Totale Architettura |
| IIc Structural - IIc Strutturale | ||||
| 22 | EXCAVATION TO ENLARGE THE AIR CONDESERS BASEMENT | |||
| Scavo per allargamento basamento dei condensatori ad aria | IT. No. Art. n. | 1 | LS/AC | 1.00 |
| 23 | CONSTRUCTION REINFORCED CONCRETE BASEMENT AND PERIMETER WALL | |||
| Costruzione del basamento in cemento armato e del muretto perimetrale | IT. No. Art. n. | 2 | LS/AC | 1.00 |
| Total Structural - Totale Strutturale |
TOTAL PART II / Totale Parte II
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||
| IIIa HVAC - IIIa HVAC | ||||
| 24 | SUPPLY AND INSTALLATION OF OUTDOOR CHILLER CH-1 537kW | |||
| Fornitura ed installazione chiller CH-1 537kW | IT. No. Art. n. | 1 | EA/NO | 1.00 |
| 25 | SUPPLY AND INSTALLATION OF OUTDOOR CHILLER CH-2 313kW WITH FREE COOLING DEVICE | |||
| Fornitura ed installazione chiller CH-2 313kW WITH FREE COOLING DEVICE | IT. No. Art. n. | 2 | EA/NO | 1.00 |
| 26 | CHILLERS PIPING CIRCUIT MODIFICATION, OUTSIDE THE MECHANICAL ROOM. SUPPLY AND INSTALLATION OF SEAMLESS BLACK STEEL PIPES UNI 10255 MEDIUM SERIES, HOT COATED WITH EPOXY POWDERS, INSULATION ALUMINUM JACKET, GATE VALVES, BALANCING VALVE, GLOBE CONTROL VALVE AND HEAT TRACE COMPLETATION. | |||
| Modifica delle tubazioni dei chiller fuori dalla centrale meccanica, con fornitura ed installazione di tubazione UNI 10255 serie media, verniciatura epossidica, completa di ogni accessorio isolamento e copertura in alluminio. Fornitura ed installazione di valvole manuali, valvole bilanciamento, valvola di controllo a globo e completamento di nastro scaldante | IT. No. Art. n. | 3 | EA/NO | 1.00 |
| 27 | SUPPLY AND INSTALLATION OF CENTRIFUGAL PUMP P1A or P1B WITH EXISTING PIPING SYSTEM ADJUSTMENT | |||
| Fornitura e posa in opera di pompa centrifuga P1A o P1B con adattamento delle tubazioni esistenti | IT. No. Art. n. | 4 | EA/NO | 2.00 |
| 28 | SUPPLY AND INSTALLATION OF CRACU-1 OR CRACU-2 UNIT IN THE TELEPHONE SWITCH ROOM, COMPLETE WITH INTERNAL AND EXTERNAL CONDENSING UNIT | |||
| Fornitura ed installazione della CRACU-1 o CRACU-2 nella telephone room con unita' interna ed esterna | IT. No. Art. n. | 5 | EA/NO | 2.00 |
| 29 | SUPPLY AND INSTALLATION OF CRACU-3 OR CRACU-4 UNIT IN THE SIPRNET ROOM | |||
| Fornitura ed installazione della CRACU-3 o CRACU-4 nella SIPRnet room | IT. No. Art. n. | 6 | EA/NO | 2.00 |
| 30 | SUPPLY AND INSTALLATION OF CRACU-5 OR CRACU-6 UNIT IN THE NIPRNET ROOM | |||
| Fornitura ed installazione della CRACU-5 o CRACU-6 nella NIPRnet room | IT. No. Art. n. | 7 | EA/NO | 2.00 |
| 31 | FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT LINE COMPATIBLE FOR R410A REFRIGERANT GAS. INSULATED AND COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE BUILDING). DIAMETER 15,9MM | |||
| Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 12,4mm | IT. No. Art. n. | 8 | LM/ML | 20.00 |
| 32 | FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT LINE COMPATIBLE TO R410A REFRIGERANT GAS. INSULATED AND COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE BUILDING). DIAMETER 22,2MM | |||
| Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 22,2mm | IT. No. Art. n. | 9 | LM/ML | 92.00 |
| 33 | FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT LINE COMPATIBLE TO R410A REFRIGERANT GAS. INSULATED AND COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE BUILDING). DIAMETER 25,4MM | |||
| Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 25,4mm | IT. No. Art. n. | 10 | LM/ML | 20.00 |
| 34 | FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT LINE COMPATIBLE TO R410A REFRIGERANT GAS. INSULATED AND COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE BUILDING). DIAMETER 28,6MM | |||
| Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 28,6mm | IT. No. Art. n. | 11 | LM/ML | 92.00 |
| 35 | GALVANIZED STEEL DUCT SYSTEM, SUPPORT SYSTEM INCLUDED. | |||
| Canalizzazioni in acciaio zincato compresi I supporti | IT. No. Art. n. | 12 | Kg/kg | 765.00 |
| 36 | FIBER GLASS DUCT SYSTEM INSULATION, 50mm, INCLUDING KRAFT PAPERFIBER | |||
| Isolamento canalizzazioni con lana di vetro 50MM rivestita con carta kraft | IT. No. Art. n. | 13 | SM/MQ | 124.00 |
| 37 | ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 600X300 | |||
| DiffusorI di mandata in alluminio compresi gli accessori 600x300 | IT. No. Art. n. | 14 | EA/NO | 24.00 |
| 38 | ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 600X200 | |||
| DiffusorI di mandata in alluminio compresi gli accessori 600x200 | IT. No. Art. n. | 15 | EA/NO | 9.00 |
| 39 | ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 800X200 | |||
| DiffusorI di mandata in alluminio compresi gli accessori 800x200 | IT. No. Art. n. | 16 | EA/NO | 4.00 |
| 40 | ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 750X300 | |||
| DiffusorI di mandata in alluminio compresi gli accessori 750x300 | IT. No. Art. n. | 17 | EA/NO | 6.00 |
| 41 | AIR VOLUME DAMPERS SIZED UNTILL 800X300 | |||
| Serranda di taratura dimensione fino a 800x300 | IT. No. Art. n. | 18 | EA/NO | 11.00 |
| 42 | CONFIGURATION AND VERIFICATION FO DDC SYSTEM FOR THE EQUIPMENT REPLACED ACCORDING THE HONEYWELL SITUATION AND DESIGN DRAWINGS AND TECHNICAL SPECIFICATION | |||
| Configurazione e verifica del sistema DDC per gli equipaggiamenti sostituiti in accordo con la situazione Honewywell, i disegni di progetto e specifiche | IT. No. Art. n. | 19 | LS/AC | 1.00 |
| 43 | SUPPLY AND INSTALLATION OF EXHAUST FAN EF-1 | |||
| Fornitura ed installazione dell'estrattore EF-1 | IT. No. Art. n. | 20 | LS/AC | 1.00 |
| 44 | SUPPLY AND INSTALLATION OF AC/CU UNIT IN THE UPS ROOM. COOLING CAPACITY 25kW | |||
| Fornitura ed installazione di sistema AC/CU nel locale UPS | IT. No. Art. n. | 21 | EA/NO | 2.00 |
| 45 | TESTING; ADJUSTING AND BALANCING OF THE HVAC SYSTEMS | |||
| Prove, tarature e bilanciamento impianti HVAC | IT. No. Art. n. | 22 | LS/AC | 1.00 |
| Total HVAC - Totale HVAC |
TOTAL PART III / Totale Parte III
| PART IV - ELECTRICAL WORK / Parte IV - Lavori Elettrici | ||||||
| 46 | SUPPLY AND INSTALLATION IN THE "TS" PANEL OF N.2 CIRCUIT BREAKER 4P 125A- Idn 0,3A, AND #2 CIRCUIT BREAKERS 3P-4A WITH THE GROUND FAULT PROTECTION 30mA | |||||
| Fornitura ed intstallazione nel quadro "TS" di n°2 interruttori 125A 4P Idn 0,3A e di n°2 interruttori 3P-4A completi di protezione differenziale 30mA | IT. No. Art. n. | 1 | EA/NO | 1.00 | ||
| 47 | CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16R16 0,6/1kV 1x240mmq | |||||
| CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV 1x240mmq | IT. No. Art. n. | 2 | LM/ML | 60.00 | ||
| 48 | CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16R16 0,6/1kV 1x120mmq | |||||
| CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV 1x120mmq | IT. No. Art. n. | 3 | LM/ML | 80.00 | ||
| 49 | CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16R16 0,6/1kV 1x70mmq | |||||
| CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV 1x70mmq | IT. No. Art. n. | 4 | LM/ML | 20.00 | ||
| 50 | CABLE TRAY 200x75MM WITH METALLIC COVER AND SUPPORT SYSTEM FOR ELECTRICAL DISTRIBUTION. Canalina elettrica metallica chiusa dimensioni 200x75mm con copertura metallica. Fornitura e posa in opera per la realizzazione della distribuzione impianti elettrici | IT. No. Art. n. | 5 | LS/AC | 30.00 | |
| 51 | CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16M16 0,6/1kV 1x35mmq. CRACU1/2 | |||||
| CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV 1x35mmq. CRACU-1/2 | IT. No. Art. n. | 6 | LM/ML | 160.00 | ||
| 52 | CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16M16 0,6/1kV 1x16mmq. CRACU1/2 | |||||
| CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV 1x16mmq. CRACU1/2 | IT. No. Art. n. | 7 | LM/ML | 40.00 | ||
| 53 | SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OM16 0,6/1kV 4x4mmq. EXT. CRACU-1/2 | |||||
| Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 4x4mmq. EXT. CRACU-1/2 | IT. No. Art. n. | 8 | LM/ML | 70.00 | ||
| 54 | SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OM16 0,6/1kV 3x2,5mmq. | |||||
| Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 3x2,5mmq. | IT. No. Art. n. | 9 | LM/ML | 50.00 | ||
| 55 | SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OR16 0,6/1kV 5x4mmq. | |||||
| Fornitura e posa in opera di cavi dorsali tipo FG16OR16 0.6/1 kV 5x4mmq. AC/CU UNIT | IT. No. Art. n. | 10 | LM/ML | 20.00 | ||
| 56 | SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OM16 0,6/1kV 3x4mmq. | |||||
| Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 3x4mmq. AC/CU UNIT | IT. No. Art. n. | 11 | LM/ML | 20.00 | ||
| 57 | SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OR16 0,6/1kV 4x10mmq. PUMP P1A/P2A | |||||
| Fornitura e posa in opera di cavi dorsali tipo FG16OR16 0.6/1 kV 4x10mmq | IT. No. Art. n. | 12 | LM/ML | 30.00 | ||
| 58 | SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OM16 0,6/1kV 5x6mmq. CRACU-3/4 | |||||
| Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 5x6mmq. CRACU-3/4 | IT. No. Art. n. | 13 | LM/ML | 30.00 | ||
| 59 | SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OM16 0,6/1kV 5x10mmq. CRACU-5/6 | |||||
| Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 5x10mmq. CRACU-5/6 | IT. No. Art. n. | 14 | LM/ML | 40.00 | ||
| 60 | SUPPLY AND INSTALLATION OF EMT CONDUITS FOR ELECTRICAL DISTRIBUTION D32. IP55 | |||||
| Fornitura e posa in opera di tubazioni ed accessori tubazioni metalliche per la realizzazione della distribuzione impianti elettrici. D32. IP55 | IT. No. Art. n. | 15 | LM/ML | 80.00 | ||
| 61 | DISCONNECT SWITCH 4P-16A IP65 Sezionatore 4P-16A IP65 | IT. No. Art. n. | 16 | EA/NO | 2.00 | |
| 62 | DISCONNECT SWITCH 3P-16A IP65 Sezionatore 3P-16A IP65 | IT. No. Art. n. | 17 | EA/NO | 2.00 | |
| 63 | DISCONNECT SWITCH 2P-16A IP65 Sezionatore 2P-16A IP65 | IT. No. Art. n. | 18 | EA/NO | 2.00 | |
| 64 | SUPPLY AND INSTALLATION IN THE "MRE" PANEL OF CIRCUIT BREAKER , CONTACTORS, AND OTHER FOR PUMP P1A/P1B | |||||
| Fornitura ed intstallazione nel quadro "MRE" di interruttori, contattori ed altro | IT. No. Art. n. | 19 | LS/AC | 1.00 | ||
| 65 | TESTING OF ELECTRIC, GROUNDING, EQUIPOTENTIAL, INSULATION OF THE NEW SYSTEM Test del sistema elettrico, messa a terra, continuità equipotenziale ed isolamento | IT. No. Art. n. | 20 | LS/AC | 1.00 | |
| 66 | TESTING OF FIRE ALARM SYSTEM ON THE CRACU. BEFORE AND AFTER THE INSTALLATION Test di funzionamento del sistema rilevazione incendi sulle CRACU prima e dopo l'intervento | IT. No. Art. n. | 21 | LS/AC | 1.00 | |
| Total electrical - Totale Elettrico |
TOTAL PART IV / Totale Parte IV 0.00 0.00 0.00 0.00
| SUSTAIN WORKS SUMMARY / Riepilogo Lavori di Manutenzione | ||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | 0.00 | 0.00 | 0.00 | 0.00 |
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | 0.00 | 0.00 | 0.00 | 0.00 |
| PART III - MECHANICAL WORK | 0.00 | 0.00 | 0.00 | 0.00 |
| PART IV - ELECTRICAL WORK | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL PRICE / Costo Totale | 0.00 | 0.00 | 0.00 | 0.00 |
OR US DOLLARS (RATE 1$ = 0,9329€) 0.00 0.00 0.00 0.00
| ADDITIONAL SUSTAIN WORKS / Lavori di Manutenzione AGGIUNTIVI | |||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | |||||||
| Id Mechanical Demolitions - Id Demolizioni Meccaniche | 0.00 | 0.00 | 0.00 | ||||
| 1 | REMOVAL OF EXISTING PRIMARY PUMP FOR THE CHILLED WATER CIRCUITS (P2A AND P2B) AND RELATED CHILLED WATER PIPEWORK, AND ALL OTHER SYSTEM ACCESSORIES AND FITTINGS, | ||||||
| Rimozione delle esistenti pompe per il primario del cicuito chiller (P2A e P2B) e relative tubazioni ed ogni altro sistema ed accessorio | IT. No. Art. n. | 1 | LS/AC | 1.00 | |||
| 2 | REMOVAL OF CONTROLS IN MECHANICAL (PUMPS) ROOM AND IN THE TELEPHONE SWITCH. NIPRNET, SIPRNET ROOMS | ||||||
| Rimozione dei controlli in sala meccanica (pompe) e nelle stanze telephone switch, NIPRnet, SIPRnet . | IT. No. Art. n. | 2 | LS/AC | 1.00 | |||
| Total Mechanical Demolitions - Totale Demolizioni Meccaniche |
| Ie Electrical Demolition - Ia Demolizioni Impianti Elettrici | ||||
| 3 | REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE PUMPS REPLACEMENT | |||
| Rimozione degli impianti elettrici esistenti per la sostituzione delle pompe (P1A / P1B / P2A / P2B) | IT. No. Art. n. | 1 | LS/AC | 1.00 |
| Total Electrical Demolitions - Totale Demolizioni Elettriche |
TOTAL PART I / Totale Parte I
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||
| IIIa HVAC - IIIa HVAC | ||||
| 4 | SUPPLY AND INSTALLATION OF CENTRIFUGAL PUMP P2A or P2B WITH EXISTING PIPING SYSTEM ADJUSTMENT | |||
| Fornitura e posa in opera di pompa centrifuga P2A o P2B con adattamento delle tubazioni esistenti | IT. No. Art. n. | 1 | EA/NO | 2.00 |
| 5 | SUPPLY AND INSTALLATION OF HVAC DDC CONTROL SYSTEM ACCORDING TO DESIGN DRAWINGS AND TECHNICAL SPECIFICATION | |||
| Fornitura ed installazione di sistema di controllo digitale e diretto come da progetto e specifiche | IT. No. Art. n. | 2 | LS/AC | 1.00 |
| 6 | SUPPLY AND INSTALLATION OF SPLIT SYSTEM FOR BATTERY ROOM. 24000 BTU/H | |||
| Fornitura ed installazione di split system per la battery room. 24000Btu/h | IT. No. Art. n. | 3 | LS/AC | 1.00 |
| Total HVAC - Totale HVAC |
TOTAL PART III / Totale Parte III
| PART IV - ELECTRICAL WORK / Parte IV - Lavori Elettrici | ||||
| 7 | SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OR16 0,6/1kV 4x10mmq. PUMPS P1A/P2A | |||
| Fornitura e posa in opera di cavi dorsali tipo FG16OR16 0.6/1 kV 4x10mmq. Pompe P1A/P2A | IT. No. Art. n. | 1 | LM/ML | 40.00 |
| 8 | SUPPLY AND INSTALLATION OF EMT CONDUITS FOR ELECTRICAL DISTRIBUTION D32. IP55 (PUMPS P2A/2B) | |||
| Fornitura e posa in opera di tubazioni ed accessori tubazioni metalliche per la realizzazione della distribuzione impianti elettrici. D32. IP55. Pompe (P2A/2B) | IT. No. Art. n. | 2 | LM/ML | 20.00 |
| 9 | SUPPLY AND INSTALLATION IN THE "MRE" PANEL OF CIRCUIT BREAKER , CONTACTORS, AND OTHER FO PUMPS P2A/P2B | |||
| Fornitura ed intstallazione nel quadro "MRE" di interruttori, contattori ed altro | IT. No. Art. n. | 3 | LS/AC | 1.00 |
| Total electrical - Totale Elettrico |
TOTAL PART IV / Totale Parte IV 0.00 0.00 0.00 0.00
| ADDITIONAL SUSTAIN WORKS SUMMARY / Riepilogo Lavori di Manutenzione AGGIUNTIVI | ||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| PART III - MECHANICAL WORK | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| PART IV - ELECTRICAL WORK | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL PRICE / Costo Totale | 0.00 | 0.00 | 0.00 | 0.00 |
OR US DOLLARS (RATE 1$ = 0,9329€) 0.00 0.00 0.00 0.00
| Total Summary / Riepilogo Complessivo | ||||
| SUSTAIN WORKS / Lavori di Manutenzione | ||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | 0.00 | 0.00 | 0.00 | 0.00 |
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | 0.00 | 0.00 | 0.00 | 0.00 |
| PART III - MECHANICAL WORK | 0.00 | 0.00 | 0.00 | 0.00 |
| PART IV - ELECTRICAL WORK | 0.00 | 0.00 | 0.00 | 0.00 |
| SUB TOTAL A / Subtotale A | 0.00 | 0.00 | 0.00 | 0.00 |
| ADDITIONAL SUSTAIN WORKS SUMMARY / Riepilogo Lavori di Manutenzione AGGIUNTIVI | ||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | 0.00 | 0.00 | 0.00 | 0.00 |
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | 0.00 | 0.00 | 0.00 | 0.00 |
| PART III - MECHANICAL WORK | 0.00 | 0.00 | 0.00 | 0.00 |
| PART IV - ELECTRICAL WORK | 0.00 | 0.00 | 0.00 | 0.00 |
| SUB TOTAL B / Subtotale B | 0.00 | 0.00 | 0.00 | 0.00 |
| 0.00 | 0.00 | |||
| TOTAL PRICE / Costo Totale | 0.00 | 0.00 | 0.00 | 0.00 |
0.00 0.00 0.00 0.00
&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY
&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY Sheet &P of &N
GRAND TOTAL
ASHE 18-1018 RPR HVAC SYSTEM FAC.1442 0.9329
INSTRUCTIONS FOR COMPLETING THE FORM
TOTAL MATERIAL COSTS € 0.00 $ 0.00
TOTAL LABOR COSTS € 0.00 $ 0.00
TOTAL OTHER DIRECT COSTS € 0.00 $ 0.00
TOTAL DIRECT COSTS € 0.00 $ 0.00
OVERHEAD % € 0.00 $ 0.00
SUBTOTAL € 0.00 $ 0.00
PROFIT % € 0.00 $ 0.00
TOTAL PRICE € 0.00 $ 0.00
DATE FIRM NAME
TITLE BY
INSTRUCTIONS TO OFFERORS
&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY
&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
File details come from the government source that posted it.