ASHE_18-1018_CCEB_R3.xlsx

XLSX spreadsheet 81 KB Posted

Attached to
Repair HVAC Bldg 1442 Federal contract opportunity
Solicitation number
FA568218R0046
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

CCEB Revision 3

View the file

Other files for this federal contract opportunity

Other files attached to Repair HVAC Bldg 1442, newest first.
File Type Posted
FA568218R00460003.pdf PDF
Attachment_4_Master_Technical_Specs_Nov_2005_English.zip ZIP file
Attachment_3_Additional_Requirements,_May_2018.pdf PDF
ASHE_18-1018_CCEB_R2.xlsx XLSX spreadsheet
FA568218R00460002.pdf PDF
ASHE_18-1018_Tech_Specs_Rev.2.pdf PDF
FA568218R0046.pdf PDF
ASHE_18-1018_CCEB_REV._01.pdf PDF
ASHE_18-1018_Tech_Specs_Rev.01.pdf PDF
FA568218R00460001.pdf PDF
ASHE_18-1018_CCEB_R2.xlsx XLSX spreadsheet
Drawings.zip ZIP file
ASHE_18-1018_TECH_SPECS.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASHE 18-1018

CONSTRUCTION COST ESTIMATE BREAKDOWN REV 3
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR HVAC SYSTEM FAC. 1442
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1018AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
SUSTAIN WORKS / Lavori di Manutenzione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ib Architectural Demolition - Ib Demolizioni Architettoniche
1DEMOLITION AND REMOVAL OF EXTERIOR WALL AT THE BACK OF THE BUILDING. CANOPY INCLUDED
Demolizione e rimozione del muro esterno dietro l'edificio. Compresa la demolizione della passerellaIT. No. Art. n.1LS/AC1.00
Total Architectural Demolition - Totale Demolizioni Architettoniche
Id Mechanical Demolitions - Id Demolizioni Meccaniche
2REMOVAL OF EXISTING WATER CHILLERS (ABOUT 221KW AND 422KW) AND DRY COOLER AND RELATED CHILLED WATER PIPEWORK, CONTROLS ETC.
Rimozione dei chiller di circa 221kW e 422kW e del dry cooler e delle relative tubazioni, controlli, etc.IT. No. Art. n.2LS/AC1.00
3REMOVAL OF EXISTING PRIMARY PUMP FOR THE CHILLED WATER CIRCUITS (P1A AND P1B) AND RELATED CHILLED WATER PIPEWORK, AND ALL OTHER SYSTEM ACCESSORIES AND FITTINGS,
Rimozione delle esistenti pompe per il primario del cicuito chiller (P1A e P1B) e relative tubazioni ed ogni altro sistema ed accessorioIT. No. Art. n.3LS/AC1.00
4REMOVAL OF EXISTING CLOSE CONTROL UNITS (DX UNITS) IN THE TELEPHONE SWITCH ROOM INCLUDED EVERY ASSOCIATED SYSTEM. INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE NECESSARY. CRACU-1 AND CRACU-2.
Rimozione delle esistenti unità di condizionamento ad espansione diretta nella telephone switch room inclusi ogni sistema associato. Incluso noleggio sistemi di raffreddamento ove necessario. CRACU-1 e CRACU-2IT. No. Art. n.4LS/AC1.00
5REMOVAL OF EXISTING CHILLED WATER CLOSE CONTROL UNITS IN THE NIPRNET ROOM INCLUDED EVERY ASSOCIATED SYSTEM. INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE NECESSARY. CRACU-5 AND CRACU-6.
Rimozione delle esistenti unità di condizionamento ad acqua refrigerata nella NIPRnet room. Inclusi ogni sistema associato. Incluso il noleggio di sistemi di raffreddamento ove necessario. CRACU-5 e CRACU-6IT. No. Art. n.5LS/AC1.00
6REMOVAL OF EXISTING CHILLED WATER CLOSE CONTROL UNITS IN THE SIPRNET ROOM INCLUDED EVERY ASSOCIATED SYSTEM. INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE NECESSARY. CRACU-3 AND CRACU-4.
Rimozione delle esistenti unità di condizionamento ad acqua refrigerata nella SIPRnet room. Inclusi ogni sistema associato. Incluso il noleggio di sistemi di raffreddamento ove necessario. CRACU-3 e CRACU-4IT. No. Art. n.6LS/AC1.00
7REMOVAL OF EXISTING DX UNITS IN UPS ROOM INCLUDED THE RENTING OF COOLING EQUIPMENT WHERE NECESSARY
Rimozione delle esistenti unità di condizionamento ad espansione diretta nella UPS room. Inclusi ogni sistema associato. Incluso il noleggio di sistemi di raffreddamento ove necessario.IT. No. Art. n.7LS/AC1.00
8REMOVAL OF CONTROLS (FOR REINSTALLATION AFTER EQUIPMENT REPLACEMENT) ON THE CHILLERS EQUIPMENT, IN MECHANICAL (PUMPS) ROOM AND IN THE TELEPHONE SWITCH, NIPRNET, SIPRNET ROOMS
Rimozione dei controlli (per reinstallazione dopo sostituzione equipaggiamento) su chiller, in sala meccanica (pompe) e nelle stanze telephone switch, NIPRnet, SIPRnet .IT. No. Art. n.8LS/AC1.00
Total Mechanical Demolitions - Totale Demolizioni Meccaniche
Ie Electrical Demolition - Ia Demolizioni Impianti Elettrici
9REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE PUMPS REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione delle pompe (P1A / P1B )IT. No. Art. n.9LS/AC1.00
10REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CHILLERS REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione dei chillersIT. No. Art. n.10LS/AC1.00
11REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CRACU-1/2 REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione dei cracu-1/2IT. No. Art. n.11LS/AC1.00
12REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CRACU-5/6 REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione dei cracu-5/6IT. No. Art. n.12LS/AC1.00
13REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE CRACU-3/4 REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione dei cracu-3/4IT. No. Art. n.13LS/AC1.00
14REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE DX UNIT IN THE UPS ROOM REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione delle unita' ad espanzione diretta nel locale UPSIT. No. Art. n.14LS/AC1.00
Total Electrical Demolitions - Totale Demolizioni Elettriche

TOTAL PART I / Totale Parte I

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIb Architectural - IIb Architettonico
15SUPPLY AND INSTALLATION OF METAL FENCE
Fornitura ed installazione di recinzione metallicaIT. No. Art. n.1LS/AC1.00
16SUPPLY AND INSTALLATION OF METAL FLASHINGS TO COVER THE NEW PERIMETRAL WALL
Fornitura ed installazione di lattoneria per coprire il nuovo muretto perimetraleIT. No. Art. n.2LS/AC1.00
17PAINTING OF EXTERIOR WALL SURFACE
Pittura esternaIT. No. Art. n.3LS/AC1.00
18REPAIR EXTERIOR PLASTER
Riparare intonaco esternoIT. No. Art. n.4LS/AC1.00
19SUPPLY AND INSTALLATION OF POLYMERIC-BITUMINOUS WATERPROOF SHEATH
Fornitura e posa in opera d guaina polimerico - bituminosaIT. No. Art. n.5LS/AC1.00
Total Architectural - Totale Architettura
IIc Structural - IIc Strutturale
20EXCAVATION TO ENLARGE THE AIR CONDESERS BASEMENT
Scavo per allargamento basamento dei condensatori ad ariaIT. No. Art. n.6LS/AC1.00
21CONSTRUCTION REINFORCED CONCRETE BASEMENT AND PERIMETER WALL
Costruzione del basamento in cemento armato e del muretto perimetraleIT. No. Art. n.7LS/AC1.00
Total Structural - Totale Strutturale

TOTAL PART II / Totale Parte II

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
IIIa HVAC - IIIa HVAC
22SUPPLY AND INSTALLATION OF OUTDOOR CHILLER CH-1 537kW
Fornitura ed installazione chiller CH-1 537kWIT. No. Art. n.1EA/NO1.00
23SUPPLY AND INSTALLATION OF OUTDOOR CHILLER CH-2 313kW WITH FREE COOLING DEVICE
Fornitura ed installazione chiller CH-2 313kW WITH FREE COOLING DEVICEIT. No. Art. n.2EA/NO1.00
24CHILLERS PIPING CIRCUIT MODIFICATION, OUTSIDE THE MECHANICAL ROOM. SUPPLY AND INSTALLATION OF SEAMLESS BLACK STEEL PIPES UNI 10255 MEDIUM SERIES, HOT COATED WITH EPOXY POWDERS, INSULATION ALUMINUM JACKET, GATE VALVES, BALANCING VALVE, GLOBE CONTROL VALVE AND HEAT TRACE COMPLETATION.
Modifica delle tubazioni dei chiller fuori dalla centrale meccanica, con fornitura ed installazione di tubazione UNI 10255 serie media, verniciatura epossidica, completa di ogni accessorio isolamento e copertura in alluminio. Fornitura ed installazione di valvole manuali, valvole bilanciamento, valvola di controllo a globo e completamento di nastro scaldanteIT. No. Art. n.3EA/NO1.00
25SUPPLY AND INSTALLATION OF CENTRIFUGAL PUMP P1A or P1B WITH EXISTING PIPING SYSTEM ADJUSTMENT
Fornitura e posa in opera di pompa centrifuga P1A o P1B con adattamento delle tubazioni esistentiIT. No. Art. n.4EA/NO2.00
26SUPPLY AND INSTALLATION OF CRACU-1 OR CRACU-2 UNIT IN THE TELEPHONE SWITCH ROOM, COMPLETE WITH INTERNAL AND EXTERNAL CONDENSING UNIT
Fornitura ed installazione della CRACU-1 o CRACU-2 nella telephone room con unita' interna ed esternaIT. No. Art. n.5EA/NO2.00
27SUPPLY AND INSTALLATION OF CRACU-3 OR CRACU-4 UNIT IN THE SIPRNET ROOM
Fornitura ed installazione della CRACU-3 o CRACU-4 nella SIPRnet roomIT. No. Art. n.6EA/NO2.00
28SUPPLY AND INSTALLATION OF CRACU-5 OR CRACU-6 UNIT IN THE NIPRNET ROOM
Fornitura ed installazione della CRACU-5 o CRACU-6 nella NIPRnet roomIT. No. Art. n.7EA/NO2.00
29FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT LINE COMPATIBLE FOR R410A REFRIGERANT GAS. INSULATED AND COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE BUILDING). DIAMETER 15,9MM
Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 12,4mmIT. No. Art. n.8aLM/ML20.00
30FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT LINE COMPATIBLE TO R410A REFRIGERANT GAS. INSULATED AND COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE BUILDING). DIAMETER 25,4MM
Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 25,4mmIT. No. Art. n.8bLM/ML20.00
31FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT LINE COMPATIBLE TO R410A REFRIGERANT GAS. INSULATED AND COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE BUILDING). DIAMETER 22,2MM
Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 22,2mmIT. No. Art. n.8cLM/ML92.00
32FURNITURE AND INSTALLATION OF COPPER PIPE FOR REFRIGERANT LINE COMPATIBLE TO R410A REFRIGERANT GAS. INSULATED AND COVERED WITH PVC (INSIDE BLDG.) OR ALUMINUM (OUTSIDE BUILDING). DIAMETER 28,6MM
Fornitura ed installazione di tubazioni in rame per linee frigorifere compatibile per R410A ed isolato con PVC (all'interno) ed alluminio (all'esterno). 28,6mmIT. No. Art. n.8dLM/ML92.00
33GALVANIZED STEEL DUCT SYSTEM, SUPPORT SYSTEM INCLUDED.
Canalizzazioni in acciaio zincato compresi I supportiIT. No. Art. n.9Kg/kg765.00
34FIBER GLASS DUCT SYSTEM INSULATION, 50mm, INCLUDING KRAFT PAPERFIBER
Isolamento canalizzazioni con lana di vetro 50MM rivestita con carta kraftIT. No. Art. n.10SM/MQ124.00
35ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 600X300
DiffusorI di mandata in alluminio compresi gli accessori 600x300IT. No. Art. n.11aEA/NO24.00
36ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 600X200
DiffusorI di mandata in alluminio compresi gli accessori 600x200IT. No. Art. n.11bEA/NO9.00
37ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 800X200
DiffusorI di mandata in alluminio compresi gli accessori 800x200IT. No. Art. n.11cEA/NO4.00
38ALUMINUM AIR DIFFUSERS INCLUDING ACCESSORIES SIZE 750X300
DiffusorI di mandata in alluminio compresi gli accessori 750x300IT. No. Art. n.11dEA/NO6.00
39AIR VOLUME DAMPERS SIZED UNTILL 800X300
Serranda di taratura dimensione fino a 800x300IT. No. Art. n.12EA/NO11.00
40CONFIGURATION AND VERIFICATION FO DDC SYSTEM FOR THE EQUIPMENT REPLACED ACCORDING THE HONEYWELL SITUATION AND DESIGN DRAWINGS AND TECHNICAL SPECIFICATION
Configurazione e verifica del sistema DDC per gli equipaggiamenti sostituiti in accordo con la situazione Honewywell, i disegni di progetto e specificheIT. No. Art. n.13LS/AC1.00
41SUPPLY AND INSTALLATION OF EXHAUST FAN EF-1
Fornitura ed installazione dell'estrattore EF-1IT. No. Art. n.14EA/NO1.00
42SUPPLY AND INSTALLATION OF AC/CU UNIT IN THE UPS ROOM. COOLING CAPACITY 25kW
Fornitura ed installazione di sistema AC/CU nel locale UPSIT. No. Art. n.15EA/NO2.00
43TESTING; ADJUSTING AND BALANCING OF THE HVAC SYSTEMS
Prove, tarature e bilanciamento impianti HVACIT. No. Art. n.16LS/AC1.00
Total HVAC - Totale HVAC

TOTAL PART III / Totale Parte III

PART IV - ELECTRICAL WORK / Parte IV - Lavori Elettrici
44SUPPLY AND INSTALLATION IN THE "TS" PANEL OF N.2 CIRCUIT BREAKER 4P 125A- Idn 0,3A, AND #2 CIRCUIT BREAKERS 3P-4A WITH THE GROUND FAULT PROTECTION 30mA
Fornitura ed intstallazione nel quadro "TS" di n°2 interruttori 125A 4P Idn 0,3A e di n°2 interruttori 3P-4A completi di protezione differenziale 30mAIT. No. Art. n.1EA/NO1.00
45CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16R16 0,6/1kV 1x240mmq
CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV 1x240mmqIT. No. Art. n.2aLM/ML60.00
46CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16R16 0,6/1kV 1x120mmq
CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV 1x120mmqIT. No. Art. n.2b
3aLM/ML80.00
47CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16R16 0,6/1kV 1x70mmq
CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV 1x70mmqIT. No. Art. n.3bLM/ML20.00
48CABLE TRAY 200x75MM WITH METALLIC COVER AND SUPPORT SYSTEM FOR ELECTRICAL DISTRIBUTION. Canalina elettrica metallica chiusa dimensioni 200x75mm con copertura metallica. Fornitura e posa in opera per la realizzazione della distribuzione impianti elettriciIT. No. Art. n.2c

3c

7fLS/AC30.00
49CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16M16 0,6/1kV 1x35mmq. CRACU1/2
CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV 1x35mmq. CRACU-1/2IT. No. Art. n.7aLM/ML160.00
50CABLES. SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16M16 0,6/1kV 1x16mmq. CRACU1/2
CAVI. Fornitura e posa in opera di cavi dorsali tipo FG16R16 0.6/1 kV 1x16mmq. CRACU1/2IT. No. Art. n.7bLM/ML40.00
51SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OM16 0,6/1kV 4x4mmq. EXT. CRACU-1/2
Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 4x4mmq. EXT. CRACU-1/2IT. No. Art. n.7cLM/ML70.00
52SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OM16 0,6/1kV 3x2,5mmq.
Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 3x2,5mmq.IT. No. Art. n.7d
7eLM/ML50.00
53SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OR16 0,6/1kV 5x4mmq.
Fornitura e posa in opera di cavi dorsali tipo FG16OR16 0.6/1 kV 5x4mmq. AC/CU UNITIT. No. Art. n.4aLM/ML20.00
54SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OM16 0,6/1kV 3x4mmq.
Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 3x4mmq. AC/CU UNITIT. No. Art. n.4bLM/ML20.00
55SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OR16 0,6/1kV 4x10mmq. PUMP P1A/P2A
Fornitura e posa in opera di cavi dorsali tipo FG16OR16 0.6/1 kV 4x10mmqIT. No. Art. n.6aLM/ML30.00
56SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OM16 0,6/1kV 5x6mmq. CRACU-3/4
Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 5x6mmq. CRACU-3/4IT. No. Art. n.9aLM/ML30.00
57SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OM16 0,6/1kV 5x10mmq. CRACU-5/6
Fornitura e posa in opera di cavi dorsali tipo FG16OM16 0.6/1 kV 5x10mmq. CRACU-5/6IT. No. Art. n.8aLM/ML40.00
58SUPPLY AND INSTALLATION OF EMT CONDUITS FOR ELECTRICAL DISTRIBUTION D32. IP55
Fornitura e posa in opera di tubazioni ed accessori tubazioni metalliche per la realizzazione della distribuzione impianti elettrici. D32. IP55IT. No. Art. n.4c

6b 7h 8b

9bLM/ML80.00
59DISCONNECT SWITCH 4P-16A IP65 Sezionatore 4P-16A IP65IT. No. Art. n.4dEA/NO2.00
60DISCONNECT SWITCH 3P-16A IP65 Sezionatore 3P-16A IP65IT. No. Art. n.7gEA/NO2.00
61DISCONNECT SWITCH 2P-16A IP65 Sezionatore 2P-16A IP65IT. No. Art. n.4eEA/NO2.00
62SUPPLY AND INSTALLATION IN THE "MRE" PANEL OF CIRCUIT BREAKER , CONTACTORS, AND OTHER FOR PUMP P1A/P1B
Fornitura ed intstallazione nel quadro "MRE" di interruttori, contattori ed altroIT. No. Art. n.5LS/AC1.00
63TESTING OF ELECTRIC, GROUNDING, EQUIPOTENTIAL, INSULATION OF THE NEW SYSTEM Test del sistema elettrico, messa a terra, continuità equipotenziale ed isolamentoIT. No. Art. n.10LS/AC1.00
64TESTING OF FIRE ALARM SYSTEM ON THE CRACU. BEFORE AND AFTER THE INSTALLATION Test di funzionamento del sistema rilevazione incendi sulle CRACU prima e dopo l'interventoIT. No. Art. n.1
LS/AC1.00
Total electrical - Totale Elettrico

TOTAL PART IV / Totale Parte IV 0.00 0.00 0.00 0.00

SUSTAIN WORKS SUMMARY / Riepilogo Lavori di Manutenzione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS0.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK0.000.000.000.00
PART III - MECHANICAL WORK0.000.000.000.00
PART IV - ELECTRICAL WORK0.000.000.000.00
TOTAL PRICE / Costo Totale0.000.000.000.00

OR US DOLLARS (RATE 1$ = 0,9329€) 0.00 0.00 0.00 0.00

ADDITIONAL SUSTAIN WORKS / Lavori di Manutenzione AGGIUNTIVI
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Id Mechanical Demolitions - Id Demolizioni Meccaniche0.000.000.00
1REMOVAL OF EXISTING PRIMARY PUMP FOR THE CHILLED WATER CIRCUITS (P2A AND P2B) AND RELATED CHILLED WATER PIPEWORK, AND ALL OTHER SYSTEM ACCESSORIES AND FITTINGS,
Rimozione delle esistenti pompe per il primario del cicuito chiller (P2A e P2B) e relative tubazioni ed ogni altro sistema ed accessorioIT. No. Art. n.1LS/AC1.00
2REMOVAL OF CONTROLS IN MECHANICAL (PUMPS) ROOM AND IN THE TELEPHONE SWITCH. NIPRNET, SIPRNET ROOMS
Rimozione dei controlli in sala meccanica (pompe) e nelle stanze telephone switch, NIPRnet, SIPRnet .IT. No. Art. n.2LS/AC1.00
Total Mechanical Demolitions - Totale Demolizioni Meccaniche
Ie Electrical Demolition - Ia Demolizioni Impianti Elettrici
3REMOVAL OF THE EXISTING ELECTRICAL SYSTEM FOR THE PUMPS REPLACEMENT
Rimozione degli impianti elettrici esistenti per la sostituzione delle pompe (P1A / P1B / P2A / P2B)IT. No. Art. n.1LS/AC1.00
Total Electrical Demolitions - Totale Demolizioni Elettriche

TOTAL PART I / Totale Parte I

PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
IIIa HVAC - IIIa HVAC
4SUPPLY AND INSTALLATION OF CENTRIFUGAL PUMP P2A or P2B WITH EXISTING PIPING SYSTEM ADJUSTMENT
Fornitura e posa in opera di pompa centrifuga P2A o P2B con adattamento delle tubazioni esistentiIT. No. Art. n.1EA/NO2.00
5SUPPLY AND INSTALLATION OF SPLIT SYSTEM FOR BATTERY ROOM. 24000 BTU/H
Fornitura ed installazione di split system per la battery room. 24000Btu/hIT. No. Art. n.2LS/AC1.00
Total HVAC - Totale HVAC

TOTAL PART III / Totale Parte III

PART IV - ELECTRICAL WORK / Parte IV - Lavori Elettrici
6SUPPLY AND INSTALLATION IN THE "MRE" PANEL OF CIRCUIT BREAKER, CONTACTORS, AND OTHER FO PUMPS P2A/P2B
Fornitura ed intstallazione nel quadro "MRE" di interruttori, contattori ed inverter 15Kw per pompe P2A e P2BIT. No. Art. n.1
2cLS/AC2.00
7SUPPLY AND INSTALLATION OF NEW ELECTRICAL FEEDING LINE. CABLE FG16OR16 0,6/1kV 4x10mmq. PUMPS P1A/P2A
Fornitura e posa in opera di cavi dorsali tipo FG16OR16 0.6/1 kV 4x10mmq. Pompe P1A/P2AIT. No. Art. n.2aLM/ML40.00
8SUPPLY AND INSTALLATION OF EMT CONDUITS FOR ELECTRICAL DISTRIBUTION D32. IP55 (PUMPS P2A/2B)
Fornitura e posa in opera di tubazioni ed accessori tubazioni metalliche per la realizzazione della distribuzione impianti elettrici. D32. IP55. Pompe (P2A/2B)IT. No. Art. n.2bLM/ML20.00
Total electrical - Totale Elettrico

TOTAL PART IV / Totale Parte IV 0.00 0.00 0.00 0.00

ADDITIONAL SUSTAIN WORKS SUMMARY / Riepilogo Lavori di Manutenzione AGGIUNTIVI
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS0.000.000.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK0.000.000.000.000.000.00
PART III - MECHANICAL WORK0.000.000.000.000.000.00
PART IV - ELECTRICAL WORK0.000.000.000.000.000.00
TOTAL PRICE / Costo Totale0.000.000.000.00

OR US DOLLARS (RATE 1$ = 0,9329€) 0.00 0.00 0.00 0.00

Total Summary / Riepilogo Complessivo
SUSTAIN WORKS / Lavori di Manutenzione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS0.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK0.000.000.000.00
PART III - MECHANICAL WORK0.000.000.000.00
PART IV - ELECTRICAL WORK0.000.000.000.00
SUB TOTAL A / Subtotale A0.000.000.000.00
ADDITIONAL SUSTAIN WORKS SUMMARY / Riepilogo Lavori di Manutenzione AGGIUNTIVI
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS0.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK0.000.000.000.00
PART III - MECHANICAL WORK0.000.000.000.00
PART IV - ELECTRICAL WORK0.000.000.000.00
SUB TOTAL B / Subtotale B0.000.000.000.00
0.000.00
TOTAL PRICE / Costo Totale0.000.000.000.00

0.00 0.00 0.00 0.00

&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY

&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY Sheet &P of &N

GRAND TOTAL

ASHE 18-1018 RPR HVAC SYSTEM FAC.1442 0.9329

INSTRUCTIONS FOR COMPLETING THE FORM

TOTAL MATERIAL COSTS € 0.00

TOTAL LABOR COSTS € 0.00

TOTAL OTHER DIRECT COSTS € 0.00

TOTAL DIRECT COSTS € 0.00

OVERHEAD % € 0.00

SUBTOTAL € 0.00

PROFIT % € 0.00

TOTAL PRICE € 0.00

DATE FIRM NAME

TITLE BY

INSTRUCTIONS TO OFFERORS

&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY

&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

File details come from the government source that posted it.