F1F3A18101A001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make changes as indicated below and in the follow ing pages:

Section A/Standard Form 1442, block 13A: change the closing date for receipt of offers.

Section A/Standard Form 1442, block 13D: change the calendar days for Government acceptance after the date offers are due.

Section B/extended description of items: replace the technical specif ications w ith Rev. 1 Section J: Attachment 2, replace the technical specif ications w ith Rev. 1; Attachment 3, replace draw ings C2, C3, S4, S5 and S6 w ith Rev. 1 and incorporate Sketch 1; change Attachment 5 incorporating the safety plan Section L: Change the Government f ill-ins and make miscellaneous changes to provision L-01 Offer Preparation Instructions Section M, provisions M-01 and M-02: make miscellaneous changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jul-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA568218R0031

X 9B. DATED (SEE ITEM 11)

20-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jul-2018

CODE

31 CONS/LGC

VIA PORDENONE, AREA "E" EDIF. 600

BASE AEREA DI AVIANO

33081 AVIANO (PN)

FA5682 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA568218R0031

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 19-Jul-2018 04:00 PM to 23-Jul-2018 04:00 PM.

The offeror acceptance period has decreased by 4 from 167 to 163.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS FOR ASHE 11-1091 CONSTRUCT ADDITION

REPAIR CORROSION CONTROL FAC. 9109 AND DEMO FAC. 973 AND 974, AREA F, AVIANO AB,

ITALY DATED JAN 2018FOR THE PURPOSES OF PROVISION 252.236-7006 OF SECTION L, THE

CONSTRUCTION WORK UNDER THIS ITEM IS SUBJECT TO THE STATUTORY COST LIMITATION OF

$1,000,000 FOR UNSPECIFIED MINOR MILITARY CONSTRUCTION (10 USC 2805)

To:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS FOR ASHE 11-1091 CONSTRUCT ADDITION

REPAIR CORROSION CONTROL FAC. 9109 AND DEMO FAC. 973 AND 974, AREA F, AVIANO AB,

ITALY REV.1 DATED 12 JUL 2018FOR THE PURPOSES OF PROVISION 252.236-7006 OF SECTION L, THE

CONSTRUCTION WORK UNDER THIS ITEM IS SUBJECT TO THE STATUTORY COST LIMITATION OF

$1,000,000 FOR UNSPECIFIED MINOR MILITARY CONSTRUCTION (10 USC 2805)

CLIN 0002

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS FOR ASHE 11-1091 CONSTRUCT ADDITION

REPAIR CORROSION CONTROL FAC. 9109 AND DEMO FAC. 973 AND 974, AREA F, AVIANO AB,

ITALY DATED JAN 2018

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS FOR ASHE 11-1091 CONSTRUCT ADDITION

REPAIR CORROSION CONTROL FAC. 9109 AND DEMO FAC. 973 AND 974, AREA F, AVIANO AB,

ITALY REV.1 DATED 12 JUL 2018

CLIN 0003

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS FOR ASHE 11-1091 CONSTRUCT ADDITION

REPAIR CORROSION CONTROL FAC. 9109 AND DEMO FAC. 973 AND 974, AREA F, AVIANO AB,

ITALY DATED JAN 2018

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS FOR ASHE 11-1091 CONSTRUCT ADDITION

REPAIR CORROSION CONTROL FAC. 9109 AND DEMO FAC. 973 AND 974, AREA F, AVIANO AB,

ITALY REV.1 DATED 12 JUL 2018

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS

The following documents are an integral part of this contract:

a. Attachment 1:

Master Technical Specifications for Construction Projects Aviano Air Base, Aviano, Italy, dated November

b. Attachment 2:

Technical Specifications ASHE 11-1091 Construct Addition Repair Corrosion Control Fac. 9109 and Demo Fac.

973 and 974, Area F, Aviano Air Base, Italy Rev.1 dated 12 Jul 2018

-230 pages

c. Attachment 3:

Drawings - drawings C2, C3, S4, S5 and S6: Rev. 1 and Sketch 1 -61 sheets

d. Attachment 4:

Additional Requirements, dated June 2018 -5 pages

e. Attachment 5:

Safety plan entitled Piano di Sicurezza e Coordinamento dated February 2018

- 152 pages

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

L-01. PROPOSAL PREPARATION INSTRUCTIONS

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors.

Failure to meet a requirement may result in an offer being ineligible for award.

In order to be determined responsive, an offeror must submit all documentation to demonstrate the following:

1. Acknowledgement of compliance with all solicitation terms and conditions.

2. Acknowledgement of all solicitation amendments

3. Current Societa’ Organismi di Attestazione (SOA) certification for category OG1 as well as classification adequate to cover offeror’s proposed amount for project performance.

4. Current Documento Unico di Regolarita’ Contributiva (DURC) certifying the payment of host social security benefits. This document must not be older than 120 days from date of proposal.

B. In addition to the requirements outlined above required to determine responsiveness of prospective offerors, the proposal shall consist of two additional separate parts;

Part I - Price Part II - Technical

C. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional data will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists, offerors may be required to submit cost data to the extent necessary for the contracting officer to determine the reasonableness of the price.

D. Specific Instructions:

1. PART I – PRICE PROPOSAL

The offeror shall provide a price breakdown for the project in accordance with the Construction Cost Estimate Breakdown Rev.1 provided. Proposed amounts shall be limited to 2 digits after the decimal. All prices shall be submitted in EURO currency. Offers not submitted in EURO currency will not be considered for award. Offers shall be complete, accurate, and sufficiently detailed to demonstrate a clear understanding of the requirement, and be consistent with the offeror’s technical proposal. The burden of proof for credibility of proposed pricing rests with the offeror.

(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the RFP Section A, SF1442. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.

(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate breakdown Rev.1 form(s). The extended amount must equal the whole Euro unit price multiplied by the number of units.

(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J Attachment 4 “Additional Requirements”.

(d) The entire solicitation Sections A through M as well as the Construction Cost Estimate Breakdown Rev.1 shall be returned in their entirety.

2. PART II – TECHNICAL PROPOSAL - Limited to no more than 12 pages (excluding Government released documents which are not subject to any page limitation restriction). Submit original only.

(a) Subfactor 1 - Qualification Certification: Submit current Societa’ Organismi di Attestazione (SOA) certification for category OG1 and classification adequate to cover offeror’s proposed amount for project performance.

(b) Subfactor 2 – Legal Standing: Submit documentation that satisfies offeror capacity to comply with law requirements concerning payments and social insurance requirements: the acceptable documentation is represented by a copy of the “Documento Unico di Regolarita’ Contributiva (DURC)” for personnel (direct hire and/or self-employed/subcontractors). The document’s issuance date must not be older than 120 calendar days from the date of the offer.

(c) Subfactor 3 – Experience: Submit offeror’s experience with the same work/trades, magnitude and complexity of this requirement. The offeror must submit evidence of at least two (2) similar projects successfully performed within the last five (5) years from the date of proposal where the offeror was solely responsible for the entire project performance that involved substantially the same work and principal trades, magnitude and complexity of this requirement.

E. Documents submitted in response to this RFP must be fully responsive to and consistent with the following:

1. Requirements of the RFP (CLINs & Technical Specifications) and government standards and regulations pertaining to the Technical Specifications.

2. Evaluation Factors for Award in Section M of this RFP.

3. Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this Section L will not be read or evaluated, and will be removed from the proposal.

4. Format for proposal Parts I and II shall be as follows:

(a) The proposals will be no bigger than A4 size paper except for fold-outs used for charts, tables, or diagrams, which may not exceed A3 size paper.

(b) A page is defined as one face of a sheet of paper containing information.

(c) Typing shall not be less than 12 pitch.

(d) Elaborate formats, bindings or color presentations are not desired or required.

GOVERNMENT FILL-INs

252.215-7010 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN

CERTIFIED COST OR PRICING DATA--ALTERNATE I (JAN 2018)

(d)(3) CONSTRUCTION COST ESTIMATE BREAKDOWN REV.1

SECTION M - EVALUATION FACTORS FOR AWARD

M-02. EVALUATION FACTORS

a. Evaluation Factors and Subfactors The following evaluation factors and subfactors will be used to evaluate proposals. The Government will evaluate the first two lowest priced proposals for technical acceptability, but will not rank the proposals by the non-price factors or subfactors.

Factor 1: Price Factor 2: Technical Subfactor 1: Qualification Certification Subfactor 2: Legal Standing Subfactor 3: Experience

b. Factor 1: Price For the purpose of conducting evaluations, the Government will first rank all proposals by Total Price (TP).

Technical evaluation will then be conducted on the two lowest priced proposals. If the lowest priced proposal of the two is evaluated as technically acceptable, that proposal represents the best value for the Government and the evaluation process stops at this point. This proposal will then be evaluated for price reasonableness and balanced pricing in accordance with FAR 15.404-1.

If the lowest priced offer is rated unacceptable, unreasonable or unbalanced the Government will then evaluate the proposals of the next two lowest proposals using the same process as outlined in the paragraph above. This process will repeat until a proposal is evaluated as technically acceptable and has both reasonable and balanced pricing.

Offerors whose price is determined to be unreasonable or unbalanced may not be considered for award.

(1) The offeror’s price proposal will be evaluated for award purposes, based upon reasonableness of the total price proposed for performance of the requirement.

(2) Unbalanced Pricing: The Government will analyze proposals to determine whether they are unbalanced with respect to prices, and separately priced line items, in accordance with FAR 15.404-1. An offer may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government.

c. Factor 2: Technical The Government’s technical evaluation team shall evaluate the technical proposals on an acceptable or unacceptable basis, assigning one of the ratings described below for each subfactor. Any subfactor evaluated as “Unacceptable” will render the entire proposal unacceptable and, therefore, unawardable. Only those proposals determined to be technically acceptable, either initially or as a result of discussions, will be considered for award. However, the offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.

TABLE 2 - TECHNICAL RATINGS

Rating Description

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

The proposals shall be evaluated against the following technical subfactors:

Subfactor 1: Qualification Certification Description: This subfactor evaluates offeror’s Societa’ Organismi di Attestazione (SOA) certification for category OG1 and classification adequate to cover offeror’s proposed amount for project performance.

Measure of Merit: This requirement is met when the offeror’s proposal provides a copy of a current SOA certification for category OG1 and classification adequate to cover offeror’s proposed amount for project performance.

Subfactor 2: Legal Standing Description: This subfactor evaluates offerors capacity to comply with law requirements concerning payments and social insurance requirements.

Measure of Merit: This requirement is met when the offeror’s proposal includes a copy of the “Documento Unico di Regolarita’ Contributiva (DURC)” for personnel (direct hire and/or self employed/subcontractors). The document’s issuance date must not be older than 120 calendar days from the date of the offer.

Subfactor 3: Experience Description: This subfactor evaluates offeror’s experience with the same work/trades, magnitude and complexity of this requirement.

Measure of Merit: This requirement is met when the offeror’s proposal includes evidence of at least two (2) similar projects successfully performed within the last five (5) years from the date of proposal where the offeror was solely responsible for the entire project performance that involved substantially the same work and principal trades, magnitude and complexity of this requirement.

M-01. SOURCE SELECTION

a. Basis for Contract Award This is a Lowest Price Technically Acceptable (LPTA) source selection conducted in accordance with Federal Acquisition Regulation (FAR) 15, Contracting by Negotiation, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS), DoD Source Selection Procedures, Appendix C, 31 March 2016 and Air Force Mandatory Procedures 5315.3 25 May 2018. These regulations are available electronically at the Air Force (AF) FARSite, http://farsite.hill.af.mil.

Contract(s) may be awarded to the offeror who is deemed responsible in accordance with the FAR Part 9.1, as supplemented, whose proposal conforms to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation) and is judged, based on the evaluation factors and subfactors, to represent the lowest price technically acceptable proposal. While the Government will strive for maximum objectivity, the source selection process, by its nature, is subjective and therefore, professional judgment is implicit throughout the entire process.

Proposals received will be ranked first by price and then evaluated for technical acceptability. The technical evaluation team will evaluate the lowest 2 (two) priced offers for technical acceptability. Upon identifying the two lowest price technically acceptable proposals evaluations will terminate. The lowest price technically acceptable offer will then be evaluated for price reasonableness and balanced pricing. The lowest price technically acceptable offer whose price is determined reasonable and balanced will be selected.

b. Number of Contracts to be Awarded The Government intends to award one contract for the performance of Project ASHE 11-1091 Construct Addition Repair Corrosion Control Fac. 9109 and Demo Fac. 973 and 974, Area F, Aviano Air Base, Italy Rev.1.

c. Discussions The Government reserves the right to award without discussions. If, during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, the procedures outlined in FAR 15.306 will be used.

d. Solicitation Requirements, Terms and Conditions Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors or subfactors. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable.

(End of Summary of Changes)