U.S. AIR FORCE
31ST FIGHTER WING
31ST CES/CENM
AVIANO AIR BASE, ITALY
33100 UDINE (I) – VIA DEL PARTIDOR, 7
tel. 0432/601860, fax 0432/601822 mailto:studio@contiassociati.it
PROJECT : ASHE11-1091
SUBMITTAL : 100%
SUBMITTAL DATE : JAN. 2018
Technical Specifications
Project : ASHE 11-1091 CONSTRUCT ADDITION REPAIR CORROSION CONTROL FAC. 9109
AND DEMO FAC.973 AND 974, AREA F, AVIANO AB, ITALY.
Location : FAC. 9109, Area F Air Base, Aviano, Italy
Project Phase:
100%
Date:
JAN. 2018
““HAVING REVIEWED THE DEFINITIVE AND DETAILED PROJECT ASHE 11-1091 PERTAINING TO CNS
ADDITION REPAIR CORROSION CONTROL FACILITY, FAC.9109, AREA F AVIANO AIR BASE, I DECLARE
THAT I HAVE ACCERTAINED THAT THE STRUCTURES AND THE TECHNOLOGICAL SYSTEMS INCLUDED
THEREIN COMPLY WITH THE APPLICABILE ITALIAN NORMS.
DATE: JAN. 2018
SIGNATURE
mailto:studio@contiassociati.it
ASHE 11-1091_AC1_100%EN
Page left intentionally blank
ASHE 11-1091_AC1_100%EN
Summary:
AC1 - 1 SCOPE OF PROJECT
AC1 - 2 AC1-2 LEED CERTIFICATION
AC1 - 3 SUBMITTAL OF MATERIALS
AC1 - 4 CONSTRUCTION AREA SCREENING
AC1 - 5 PROJECT SIGN
AC1 - 6 JOB SITE MOBILIZATION
AC1 - 7 SAFETY
AC1 - 8 HAZMAT/HAZWASTE HOUSEKEEPING
AC1 - 9 PRESERVATION OF EXISTING CONDITIONS
AC1 - 10 WORK SITE CONDITIONS
AC1 - 11 AIRFIELD SAFETY TRAINING
AC1 - 12 PARKING
AC1 - 13 ACCESS ROUTES
AC1 - 14 TRUCKING AND ROADS
AC1 - 15 NOISE CONTROL
AC1 - 16 EXCAVATIONS
AC1 - 17 LAWN MAINTENANCE
AC1 - 18 LAWN ESTABLISHMENT
AC1 - 19 CONSTRUCTION SITE RESTORATION
AC1 - 20 PROCEDURES AND WORK PHASES
AC1 - 21 SALVAGEABLE MATERIALS
AC1 - 22 CONSTRUCTION DRAWINGS
AC1 - 23 TECHNICAL SPECIFICATION
AC1 - 24 ADDITIONAL SPECIFICATIONS
AC1 - 25 REVISED MASTER SPECIFICATIONS
AC1 - 26 ADDITIONAL NORMS AND STANDARDS
AC1 - 27 FINAL ACCEPTANCE TEST, CERTIFICATIONS AND OTHER REQUIREMENTS
ASHE 11-1091 CONSTRUCT ADDITION REPAIR CORROSION CONTROL FAC. 9109 AND DEMO FAC.973 AND 974, AREA F, AVIANO AB, ITALY. 1
AC1 - 1 SCOPE OF PROJECT
The Scope of this project is to construct a 16.78 m by 13.00 m addition to Bldg. 9109 to be used for small parts paint booth and a new bulk paint storage. Project includes also systems renovation and upgrade of facility 9109. Project includes also enclosing the aircraft wash rack facility 9110 with pre-painted insulated metal panels, front metal sliding gates and new systems to support such area: heating system, fire detection//power/lighting/etc, new compressed air system, new fire extinguishing system (sprinkler), eyewash/shower.
Finally project include demolition of Fac.973 and 974. Works will be listed in the following parts:
FAC.9109
Part. A - NEW WORKS.
Part. B - REPAIR WORKS.
Part. D - DEMO WORKS.
FAC.9110
Part. A - NEW WORKS.
AREA F, AVIANO AB, ITALY. 2
FAC.9109 PART A - NEW WORKS
FAC.9109 A.I DEMOLITION AND REMOVAL WORKS
- Demolition and Removal of concrete pavement, wall and curb;
- All demolished items shall be removed, transported, and disposed to authorized public dump site.
- Demolition, Removal and fix of existing electrical system, into office ;
Fac.9109 A.II ARCHITECTURAL/STRUCTURAL/CIVIL WORKS
Fac.9109 A.IIa Architectural works
- New concrete LECA block;
- New internal/external walls plastering;
- New internal walls painting;
- New concrete industrial paved area, including resin treatment;
- New roof insulation package, including thermal panel, vapor barrier, and double bituminous membrane;
- New Gutters, flashing and downspouts;
- New metal doors and roll-up gates;
- All other items of work as indicated on drawings and Schedule of Work Items.
FAC.9109 A.IIb Structural works
- Excavation for foundations;
- New lean concrete for foundations;
- New concrete for foundations, vertical walls and columns, beams and roof slab;
- New Pre-Cast Roof Slab;
- New steel for reinforced concrete;
FAC.9109 A.IIc Civil works
- External concrete pavement restoration;
- External asphalt pavement restoration;
- Upgrade existing utility pipes, pits and manholes;
- Area restoration and landscaping;
FAC. 9109 A.III MECHANICAL WORKS
- Not applicable
AREA F, AVIANO AB, ITALY. 3
FAC.9109 A.IV ELECTRICAL WORKS
Furnishing and installation of new electric feeding lines for the panel QN1, panel Q11 and panel UPS. The new electric feeding lines shall be installed in underground cable duct and in new tray cable. Work items include also the furnishing and installation of a new circuit breakers in existing electrical panel Q0.
- Furnishing and installation of a grounding system;
- Furnishing ant installation of lighting protection system as indicated in the project with cupper conductor. The job includes the connection to the existing grounding ring, accessories and any other work to provide a job in a workmanlike manner.
- Furnishing and installation of new area electrical panels, metalwork fabrication, moulded-case circuit breakers for lighting system and power control.
- Furnishing and installation of main electrical distribution system, Item includes: electrical conduits made of or galvanized steel conduits; galvanized steel raceways; conductors shall be flexible fireproof and explosion proof cable type (CPR certification) complete with insulated pressure wire terminals, circuit indicating tags and all accessories necessary for the proper execution of connections and necessary junction and pull boxes;
- Furnishing and installation of new tray cable for distribution system;
- Furnishing and installation of lighting fixtures and emergency and; including all necessary accessories to perform the work in a workmanlike manner and in accordance with governing regulations. Feeding shall be 230
Volt, 50 Hz;
- Furnishing and installation of lighting fixtures and emergency, including all necessary accessories to perform the work in a workmanlike manner and in accordance with governing regulations.Feeding shall be 400/230 Volt, 50 Hz;
- Furnishing and installation of electrical outlets, including all necessary accessories required for their installation.
Item includes: electrical receptacles; metal support box voltage and frequency shall be shown on aluminum tag or if tag are missing, engraved on laminate plastic labels screwed on the outlets;
- Furnishing and installation of manual and automatic fire detection and alarm system , complete with auxiliary devices and accessories necessary for the system installation and setting into operation.
- Installation/upgrading on above mentioned systems of dedicate Surge Protection device on all incoming feeder lines;
- Restoration/upgrading of equipotential grounding connections, internal metallic masses and new equipment equi-potential grounding connections; communications equi-potential grounding systems;
AREA F, AVIANO AB, ITALY. 4
FAC.9109 PART B - REPAIR WORKS
FAC.9109 B.I DEMOLITION AND REMOVAL WORKS
- Demolition and Removal of internal partitions, ceramic floor and wall tiles, sinks, shower, etc;
- All demolished items shall be removed, transported, and disposed to authorized public dump site.
FAC.9109 B.II ARCHITECTURAL/STRUCTURAL/CIVIL WORKS
FAC.9109 B.IIa Architectural works
- New dry walls 13cm thick partitions in accordance with new rooms layout;
- New internal doors with hardware and locks;
- New internal walls painting;
- New Shower and Sink areas
FAC.9109 B.IIb Structural works
- Not Applicable
FAC.9109 B.IIc Civil works
- Not Applicable
FAC.9109 B.III MECHANICAL WORKS
- New gas system for heat generator;
- New fresh air and exhaust ducts;
- New compressed air system;
- New sprinkler system.
FAC.9109 B.IV ELECTRICAL WORKS
- Furnishing ant installation of new equipments emergency power back (CPSS and GENERATING SETS) up to support the fire suppression planel and including all necessary accessories to perform the work in a workmanlike manner and in accordance with governing regulations. Feeding shall be 400 Volt, 50 Hz;
- Furnishing and installation of new tray cable for distribution system;
- Furnishing and installation of lighting fixtures and emergency;
- Furnishing and installation of new CPR cables;
http://www.visa.it/en/page-products
AREA F, AVIANO AB, ITALY. 5
Part. D - DEMO WORKS.
Demolition of facilities 973 and 974, including roofs metal panels, flashing, gutters, downspouts, side metal panels, metal structure, concrete foundations, concrete flooring, external concrete sidewalk, external grounding system, roof lighting protection system, underground utilities and any other item installed into the facilities and/or serving the facilities. Item includes area restoration as per surrounding conditions.
AREA F, AVIANO AB, ITALY. 6
FAC.9110 PART A - NEW WORKS
FAC.9110 A.I DEMOLITION AND REMOVAL WORKS
- Demolition and Removal of concrete pavement, wall and curb;
- All demolished items shall be removed, transported, and disposed to authorized public dump site.
- Demolition, Removal existing electrical system;
Fac.9110 A.II ARCHITECTURAL/STRUCTURAL/CIVIL WORKS
A.IIa Architectural works
- New pre-painted insulated metal sandwich panel for wash rack walls;
- Concrete industrial floor touch up;
- New metal doors and windows;
- New metal front sliding gates;
- Fire-rated REI 60’ painting for metal structure;
FAC.9110 A.IIb Structural works
- Excavation for foundations;
- New lean concrete for foundations;
- New concrete for foundations and vertical walls;
- New steel for reinforced concrete;
- New steel profiles for columns and sliding gates;
FAC.9110 A.IIc Civil works
- External concrete pavement restoration;
- External asphalt pavement restoration;
- Upgrade existing utility pipes, pits and manholes;
- Area restoration and landscaping;
FAC. 9110 A.III MECHANICAL WORKS
- Heating system: boiler room, ceiling radiant panels, piping, gas system;
- Emergency station: shower and eye-wash;
- Sprinkler system.
AREA F, AVIANO AB, ITALY. 7
FAC.9110 A.IV ELECTRICAL WORKS
- Furnishing and installation new electrical panels, metalwork fabrication, moulded-case circuit breakers for mechanical system and power control
- Furnishing and installation of main electrical distribution system. Item includes electrical conduits made of or galvanized steel conduits for ATEX type. Conductors shall be flexible fireproof and explosion proof cable type, as CPR norm, complete with insulated pressure wire terminals, circuit indicating tags and all accessories necessary for the proper execution of connections; the necessary junction and pull boxes,
- Furnishing and installation of lighting fixtures and emergency and explosion proof lighting fixtures, including all necessary accessories to perform the work in a workmanlike manner and in accordance with governing regulations. Feeding shall be 230/400 Volt, 50 Hz.
- Furnishing and installation of manual and automatic fire detection and alarm system, atex type, complete with auxiliary devices and accessories necessary for the system installation and setting into operation
AREA F, AVIANO AB, ITALY. 8
AC1 - 2 AC1-2 LEED CERTIFICATION
Not Required
AC1 - 3 SUBMITTAL OF MATERIALS
In accordance with Paragraph 2.5 of the technical specification No. 01100/R, entitled “GENERAL CONDITIONS” of the
Master Specifications, the materials listed in MATERIAL SUBMITTAL SCHEDULE shall be submitted as required by the time schedule indicated, for the approval by the Contracting Officer’s Technical Representative. The Contractor shall provide, for all the materials that will be furnished and installed, a written certification, completed with catalog data from which shall be clear the total absence of toxic-noxious materials. The number of copies will be as required on MATERIAL
SUBMITTAL SCHEDULE.
AC1 - 4 CONSTRUCTION AREA SCREENING
All construction sites and material storage areas shall be securely fenced around the entire perimeter within an area defined by the Contracting Officer’s (C.O.) Technical Representative. Bilingual signs, "VIETATO L'INGRESSO - LAVORI
IN CORSO / WORK AREA - NO ENTRY" shall be placed at the work area entry and along each side of the fencing.
Fence type, height, and screening color should also be specified by the Base Civil Engineering (BCE). Fencing shall be completely secured at top and bottom to prevent access. Fences shall be screened with opaque screening material to prevent visibility inside the fenced area. Fences and screens shall be adequately staked and/or anchored to prevent blowing over during high wind conditions. Contractor shall not start installation of area screening until approved, in writing, by Contracting Officer (C.O.). Contractor shall submit photos or samples of the screening material for approval by C.O.. The Contractor shall replace or repair in a timely manner, as determined by C.O., all fences and screening sections that have damage or develop unsightly rips or holes. It is strictly forbidden to install advertisement signs and/or logos including contractor’s along the construction site fence. At the end of the work or when exterior work requires it, temporary fencing shall be removed. Night warning lights shall be installed to illuminate the work area, from sunset to dawn.
AC1 - 5 PROJECT SIGN
The Contractor shall furnish a project sign on site in accordance with Section 01101/R. The sign shall be made of a durable material and maintained in good condition. Lettering is to be white gloss, exterior-type enamel. The sign and posts shall be given one prime coat and two finish coats of dark brown gloss exterior enamel paint. The sign shall be erected at the designated location and shall be maintained in good condition by the Contractor until completion of the contract. The sign shall remain the property of the Contractor and shall be removed from the site upon final inspection and acceptance of the facility. Contractor identification and logo shall be allowed only on this sign and nowhere else on the exterior of the job site, with the exception of company vehicles. There should be no signs for the purpose of advertising anywhere on the site. Contractors shall submit sign proposal to C.O. for approval.
AC1 - 6 JOB SITE MOBILIZATION
The Contractor shall submit a proposal to C.O. diagramming their construction site and all material storage areas in locations separate from a construction site. The Contractor shall submit this plan 14 calendar days prior to the start of
AREA F, AVIANO AB, ITALY. 9
construction. Material mobilization and construction execution cannot begin until the plan has been approved by the base. Jobsite utility connections are the responsibility of the Contractor and shall be coordinated through BCE.
Temporary overhead utility runs are prohibited. Contractor shall include a plan for supplying required utilities to their site in their proposal.
AC1 - 7 SAFETY
Contractor shall provide barricades, traffic control signs and construction safety signs that meet installation standards and comply with all applicable laws. Actual location, size and final arrangement of these items shall be discussed and approved by the C.O. prior to installation. Such approved items shall be of uniform size, design and color. All cones, barricades, warning lights, temporary signs and protective devices shall conform to the current host nation requirements
(D.M. 81/08) and other applicable norms.
AC1 - 8 HAZMAT/HAZWASTE HOUSEKEEPING
Prior to bringing any hazardous material onto the base, the Contractor must contact BCE to coordinate the storage and handling of all hazardous materials. Contractor is responsible for complying with all applicable environmental regulations and laws pertaining to the storage, handling, and transportation of hazardous materials and hazardous waste.
Hazardous materials: The Contractor shall identify all hazardous materials required for completion of the project.
Material Safety Data Sheets: The Contractor shall furnish English language versions of the Material Safety Data Sheets
(MSDS) of hazardous materials, chemical, toxic, and noxious, that will be used in the construction work, to 31st
CES/CEAV for approval and coordination through SEG and SGPB. The Contracting Officer will provide sample of the
MSDS form to the Contractor.
Hazardous Waste Management Plan: The Contractor shall provide an hazardous waste management plan.
Chemicals Materials: The Contractor shall ensure that hazardous materials utilized during construction do not contain any chemicals listed as EPA 17 toxins. A list of the EPA 17 toxins con be obtained from the 31st CES/CEAV office.
Liquid, flammable or toxic substances: Any liquid, flammable, or any other toxic substances that are required for the execution of the works, shall be kept in properly labeled, special containers. Relative data (quantity, characteristics and location) shall be transmitted to 31st CES/CEF or 31st CES/CEAV.
AC1 - 9 PRESERVATION OF EXISTING CONDITIONS
The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized by C.O. to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound. The Contractor shall return all areas disturbed during construction to their original condition before final acceptance by the base.
AC1 - 10 WORK SITE CONDITIONS
The work areas shall be made available to the Contractor as follows:
AREA F, AVIANO AB, ITALY. 10
a) Building interior area: The Contractor shall remove and dispose, if not otherwise directed by the
Contracting Officer’s Technical Representative, all the floor and/or wall fastened furniture items from the rooms interested by the works. Movable furniture items will be by Government personnel removed prior commencement of the work.
b) Building Location: The project site is not located in a restricted area. Contractor shall strictly comply with the Contracting Officer’s instructions. Delays may happen when the Contractor will enter the areas due to military operations or exercises. In this case the unproductive time will not be at the expense of the
USA Government.
c) Administrative Containers: Containers required on site for administrative reasons (office space, conference space, break room) must be in like new condition and painted a color which coordinates with the base architectural plan and is approved by C.O., unless it is hidden by the opaque fencing material.
Administrative containers in need of painting and / or repairs or that are in an unsightly condition will not be allowed at the project site. A nameplate, no greater than 0.5 meters X 0.5 meters in size, shall be displayed on the exterior of all trailers which lists the name of the Contractor’s company, 24-hour
Contractor’s point(s) of contact (POC) and telephone number where they can be reached.
d) Material Storage: Storage containers will be in like new condition, and painted a color which coordinates with the base architectural plan and is approved by C.O., if it is not hidden by the opaque fencing material. Contractor shall display a nameplate on the exterior of all storage units with the name of the
Contractor’s company, the Contractor’s point(s) of contact (POC) and telephone number where they can be reached. Storage of materials at the work site is at the Contractor’s risk. The use of private security guards on a job site shall be coordinated with base Security Forces and approved by the installation commander. The Contractor shall not use any area(s) for material or equipment storage that has not been approved by C.O.
e) Loading and Unloading of Construction Materials and Equipment: Unloading of materials will be allowed within the fenced work area. Contractor's personnel, vehicles and equipment must not obstruct access roads to other buildings. Temporary parking of vehicles, for loading or unloading materials and equipment is permitted in the proximity of the work area; unless such operations will obstruct traffic flow.
f) Housekeeping and Site Cleanup: At the end of each working day, the Contractor shall be responsible for cleaning the area surrounding the building involved in the work. Since the adjacent buildings are used every day, the Contractor shall provide that the surrounding areas are kept constantly clean and accessible, completely safe, and that the facilities are not in any way aesthetically damaged, even temporarily. Such functions include disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times. Grass within the construction sites and material storage areas shall never exceed 10 cm in height. All rubbish and waste materials shall be placed in Contractor furnished containers. Contractors shall ensure all light weight debris at the construction site is properly secured in waste receptacles so that it does not blow to another area or onto the airfield. During the laying of asphalt roads, streets and/or parking surfaces, areas soiled by residual asphalt shall be cleaned the same day.
AC1 - 11 AIRFIELD SAFETY TRAINING
Work site area is outside Airfield Area. Contractor shall contact the office “Airfield Management” before installing/using
AREA F, AVIANO AB, ITALY. 11
special tools and equipment (cranes, truck with tall arms, lifters, etc).
AC1 - 12 PARKING
Contractor or Contractor’s employees, including subcontractors, shall obey all traffic laws on installation.
The Contractor shall park all vehicles, including heavy equipment vehicles, only in unobtrusive locations within the fence line of the construction site or lay-down areas. Every effort must be made to avoid parking vehicles or heavy equipment where it can be easily observed by the public. The Contractor shall not park outside the construction zone unless approved through C.O. The Contractor shall clearly identify their vehicles through the use of company logos or signs on their vehicles.
AC1 - 13 ACCESS ROUTES
The project site is not located within a restricted area.
The Contractor shall provide a haul route plan for approval by C.O.
For road detour/closures the Contractor shall submit a written request to the Contracting Officer or his authorized representative for approval four (4) weeks prior to his scheduled starting of work.
AC1 - 14 TRUCKING AND ROADS
Trucks loaded with loose material that can create a dust, debris or falling hazard shall be secured and covered. Fasten suitable cover, such as tarpaulin, over the load before entering surrounding streets. The Contractor is solely responsible for spillage from their vehicles and such spillage shall be cleaned up immediately. All roads shall be maintained free of debris at all times. The Contractor is responsible for ensuring all haul routes and site access areas are maintained in a clean and orderly fashion, free from mud, debris and clutter at all times. Special consideration must be given to haul routes that cross active taxiways. No amount of debris at these locations shall be tolerated. The Contractor shall sweep these areas continuously as long as material deliveries are being made.
AC1 - 15 NOISE CONTROL
The Contractor shall comply with all applicable country, local, and installation laws, ordinances, and regulations relative to noise control, to include applicable base quiet hours.
AC1 - 16 EXCAVATIONS
Every trench/excavation shall be returned to its original condition within ten days of the original excavation; this may be extended to 30 days if approved by the BCE. Contractor shall phase trenching and excavation operations in order to comply. At minimum, Contractor shall restore the site to pre-excavation conditions. All soil stockpiles shall be hidden from view to the maximum extent possible. Prior approval by BCE is required if soil stockpiles are to remain exposed for long periods of time. Dust control measures are the responsibility of the Contractor and shall be implemented as directed by BCE. All road cuts must be approved by BCE prior to execution.
AREA F, AVIANO AB, ITALY. 12
AC1 - 17 LAWN MAINTENANCE
Grassy areas disturbed by any type of construction work including storage, equipment staging, and material delivery areas shall be sodded, or hydro-seeded, where required by BCE. Sodding, or seeding, damaged areas should be accomplished at the earliest planting season possible. Contractor shall be responsible for the successful growth and maintenance of all sodded, or seeded, areas under this contract for a period of thirty (30) days or three mowings after final acceptance of the work. All grass, shrubbery, and ornamental plants fenced by the construction site shall be maintained to base standards by the Contractor.
AC1 - 18 LAWN ESTABLISHMENT
Within seven (7) workdays of actual completion of work at contract site, the Contractor shall prepare all disturbed areas inside and outside of the fenced site for sodding, or hydro-seeding, as provided in contract specifications. Contractor shall restore the site to a condition and appearance equal to or better than existing before the work occurred. Such restoration work will not be considered complete, and the facility not accepted, until approved by BCE. Additionally, no seeding shall be authorized for lawn establishment, whether new, or for restoration purposes unless specifically authorized by C.O.
AC1 - 19 CONSTRUCTION SITE RESTORATION
All Contractor owned items such as, but not limited to, stakes, traffic/safety cones, barriers, warning tape, erosion control fences, that are erected during construction, shall be removed entirely after completion of project and within five
(5) days of Government acceptance of the project site. The Contractor, at his own expense, shall return to the site to remove any items left at or near the project site after this time period. All trailers, equipment/storage units, residual construction materials shall be removed also within five (5) days of Government acceptance of the project site.
AC1 - 20 PROCEDURES AND WORK PHASES
Prior to starting any work the Contractor shall submit a Work Plan for approval by the Contracting Officer.
AC1 - 21 SALVAGEABLE MATERIALS
In this contract are indicated materials and equipment to be removed, stored and subsequently reinstalled. It shall be the responsibility of the Contractor to remove salvageable items with maximum care to avoid any damages; and to transport them to the storage areas as indicated by the Contracting Officer’s Technical Representative. It shall be the responsibility of the Contractor to provide containers for material disposal and/or transportation of the salvageable items.
All discarded materials shall be transported to an authorized public dump site by the Regional and National Regulation according to the typology of the related material. Transportation of discarded materials shall be extended, to an authorized dump site, even if the dump site is located outside the authority limits of the Aviano City Council Territory.
AC1 - 22 CONSTRUCTION DRAWINGS
The following Construction Drawings complement this Technical Specification and are an integral part of the project documents:
SHEET SEQUENTIAL n° DESCRIPTION
AREA F, AVIANO AB, ITALY. 13
GENERAL
T-1 1 PROJECT TITLE SHEET AND MAPS
T-2 2 LIST OF DRAWINGS AND LEGENDS
CIVIL
C-1 3 EXISTING CONDITION – FAC.973 974 DEMOLITION PLAN
C-2 4 EXISTING CONDITION – FAC.9109 EXTERNAL DEMOLITION PLAN
C-3 5 NEW CONDITION – EXTERNAL PLAN
C-4 6 NEW CONDITION – DETAILS
ARCHITECTURAL
A-1 7 EXISTING CONDITION – GROUND FLOOR AND ROOF PLANS
A-2 8 EXISTING CONDITION – VIEWS AND SECTION
A-3 9 NEW CONDITION – GROUND FLOOR AND ROOF PLAN
A-4 10 NEW CONDITION – VIEWS AND SECTION
A-5 11 NEW CONDITION – DOORS AND WINDOWS SCHEDULE
A-6 12 NEW CONDITION – CONSTRUCTION DETAILS
A7 13 NEW CONDITION – CONSTRUCTION DETAILS
A8 14 NEW CONDITION – SAND SHOP CAT-WALK
A9 15 EXISTING AND NEW CONDITION – PAINTING BAY PLAN
STRUCTURAL
S-1 16 GENERAL NOTES AND LEGEND
S-2 17 NEW CONDITION – FAC.9109 ADDITION STRUCTURE PLANS
S-3 18 NEW CONDITION – FAC.9109 ADDITION STRUCTURE SECTIONS
AND DETAILS
S-4 19 NEW CONDITION - WASH RACK ENCLOUSER STRUCTURES
S-5 20 NEW CONDITION – WASH RACK SLIDING GATES FOUNDATION
S-6 21 NEW CONDITION – WASH RACK SLIDING GATES VERTICAL FRAME
S7 22 NEW CONDITION – STRUCTURES PLANS, SECTIONS AND DETAILS
FOR PAINT-BOOTH SETTING
PAINT BOOTH
CV-1 23 PAINT BOOTH - NEW CONDITION - GENERAL PLAN
MECHANICAL
M-1 24 NEW CONDITION – GENERAL PLAN
M-2 25 NEW CONDITION – CEILING RADIANT PANELS SYSTEM
M-3 26 WASH RACK- BOILER ROOM – FLOW DIAGRAM
M-4 27 SPRINKLER SYSTEM – PLAN AND SECTION
M-5 8 SPRINKLER SYSTEM – DETAILS
AREA F, AVIANO AB, ITALY. 14
M-6 29 NEW CONDITION – WASH RACK – SPRINKLER SYSTEM – PLAN AND
SECTION
M-7 30 NEW CONDITION - WASH RACK - SPRINKLER SYSTEM - DETAILS
FIRE DETECTION
F-01 31 FIRE DETECTION - LEGEND
F-02 32 EXISTING CONDITION GROUND FLOOR - FIRE DET. AND EM
F-03 33 NEW CONDITION GROUND FLOOR - FIRE DETECTION
F-04 34 EXISTING CONDITION FIRST FLOOR - FIRE DET. AND EM
F-05 35 NEW CONDITION ADDITION - FIRE DETECTION SYSTEM
F-06 36 NEW CONDITION WASH RACK - GROUND FLOOR AND ROOF PLAN
F-07 37 NEW CONDITION -NEW FIRE ALARM DIAGRAM
ELECTRICAL
E-1 38 ELECTRICAL LEGEND
E-2 39 EXISTING CONDITION-LIGHTNING AND COPPER GROUNDING-
DRAWING 1
E-3 40 EXISTING CONDITION-LIGHTNING AND COPPER GROUNDING-
DRAWING 2
E-4 41 EXISTING CONDITION - ELECTRICAL SYSTEM
E-5 42 EXISTING CONDITION GROUND FLOOR - POWER ELECTRICAL
SYSTEM
E-6 43 EXISTING CONDITION ELECTRICAL SYSTEM P1, AND NEW SONIC
BIRD SYSTEM
E-7 44 EXITING CONDITION GROUND FLOOR - LIGTHING SYSTEM
E-8 45 NEW CONDITION GROUND FLOOR - LIGTHING SYSTEM
E-9 46 EXITING E NEW CONDITION GROUND FLOOR- LIGHTING SYSTEM
E-10 47 NEW CONDITION- ELECTRICAL SYSTEM
E-11 48 NEW POWER BACK UP AND NEW FIRE SYSTEM FOR MECHANICAL
ROOM
E-12 49 NEW CONDITION-LIGHTNING PROTECTION SYSTEM AND NEW
COPPER GROUNDING
E-13 50 NEW CONDITION WASH RACK - GROUND FLOOR AND ROOF PLAN
E-14 51 DETAIL-LIGHTNING PROTECTION SYSTEM AND NEW COPPER
GROUNDING
E-15 52 DETAIL - GENERAL NOTE E SPD SYSTEM
E-16 53 DETAIL - LIGHTING AND POWER SYSTEM
EP-01 54 EXISTING CONDITION - ELECTRICAL PANELS QO Q1
EP-02 55 EXISTING CONDITION - ELECTRICAL PANELS Q11 BRP
EP-03 56 NEW CONDITION - ELECTRICAL PANEL Q0
AREA F, AVIANO AB, ITALY. 15
EP-04 57 NEW CONDITION - ELECTRICAL PANELS Q11- EP
EP-05 58 NEW CONDITION - ELECTRICAL PANEL QN1
EP-06 59 NEW CONDITION - ELECTRICAL PANEL QN2-Q5-Q6
HYDRANT SYSTEM
H-01 60 NEW CONDITION GENERAL PLAN
AC1 - 23 TECHNICAL SPECIFICATION
The following Sections of the Master Specifications for construction projects of the Air Base in Aviano (PN), Italy, dated
November 2005 and applicable modification, shall be applicable to the present project, together with the List of Work
Items to be performed:
02315 EXCAVATION AND FILL
02579 PRECAST CONCRETE PAVING BLOCKS FOR SIDEWALKS
02724 AGGREGATE AND SAND BASE COURSES
02921 TURF
02935 LANDSCAPE MAINTENANCE
05500 METAL FABRICATIONS
07231 WALL INSULATION
08210 WOOD DOORS
16050 BASIC ELECTRICAL MATERIALS AND METHODS
16303 UNDERGROUND TRANSMISSION AND DISTRIBUTION LINES
16316 SWITCHBOARDS
16402 INTERIOR DISTRIBUTION SYSTEMS
16510 INTERIOR LIGHTING
16530 EXTERIOR LIGHTING
16710 STRUCTURED TELECOMMUNICATIONS CABLING AND PATHWAY SYSTEM
See Paragraphs AC1-24 and AC1-25 and AC1-26 for the other applicable specifications.
AC1 - 24 ADDITIONAL SPECIFICATIONS
In addition to the Norms and Specifications contained in the Master Specifications as noted in Section AC1-23 of these
Technical Specifications, the following Additional Specifications shall apply to this project:
UFC 4-211-02 3-5.2.8.2
AC1 - 25 REVISED MASTER SPECIFICATIONS
In addition to the Norms and Specifications contained in the Master Specifications as noted in Section AC1-23 of these
Technical Specifications, the following Revised Master Specifications shall apply to this project
AREA F, AVIANO AB, ITALY. 16
01100/R GENERAL CONDITIONS
01101/R PROJECT SHEET
02220/R SITE DEMOLITION
02510/R WATER DISTRIBUTION
02551/R NATURAL GAS DISTRIBUTION
02630/R STORM DRAINAGE
03300/R CAST-IN-PLACE CONCRETE
04200/R MASONRY
05120/R STRUCTURAL STEEL
05500/R METAL FABRICATIONS
07600/R FLASHING AND SHEET METAL
07840/R FIRE STOPPING
07920/R JOINT SEALANTS
08110/R STEEL DOORS AND STEEL FRAMES
08120/R ALUMINUM DOORS, FRAMES AND SIDELIGHTS
09510/R ACOUSTICAL CEILING
09900/R PAINTS AND COATINGS
13856/N GAS LEAK DETECTION AND PREVENTION SYSTEM
15050/R BASIC MECHANICAL MATERIALS AND METHODS
15070/R MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
15080/R INSULATION FOR MECHANICAL EQUIPMENT
15181/R CHILLED WATER AND HOT WATER PIPING
15810/R DUCTWORK AND DUCTWORK ACCESSORIES
16050/R BASIC ELECTRICAL MATERIALS AND METHODS
16303/R UNDERGROUND TRANSMISSION AND DISTRIBUTION LINES
16316/R SWITCHBOARDS
16402/R INTERIOR DISTRIBUTION SYSTEMS
16510/R INTERIOR LIGHTING
16530/R EXTERIOR LIGHTING
264100/R LIGHTNING PROTECTION SYSTEM
AC1 - 26 ADDITIONAL NORMS AND STANDARDS
Furthermore the works included in this project shall be in accordance, when applicable norms like Aviano Design Guide
2011 Revision, NFPA, ASTM, UL, HANDBOOKS, Norms and Standards, whose manuals and regulations are available for review at the Contracting Officer.
AREA F, AVIANO AB, ITALY. 17
AC1 - 27 FINAL ACCEPTANCE TEST, CERTIFICATIONS AND OTHER REQUIREMENTS
1. Once issued NTP, Contractor is required to contact CEAOR (Ms. Cristina Rossetto 0434-305691) and schedule a meeting to fill Form DD1354 with appropriate project data for real property capitalization (blank
DD1354 and category codes list CATCODE_LIST_2010 are available at 31CES/CENM office during duty hours). Contractor is required to provide final Form DD1354 for 31CES/CD signature before contract close out;
2. All installed mechanical and electrical equipment shall have the required Italian Mark of Quality and shall conform to D.P.R. No. 459, dated 24 July 1996, with "C.E." Mark; and three copies of relevant certificates shall be furnished to the Contracting Officer for each item of equipment installed. Furthermore the electric equipment shall be in compliance with the Legislative Decree No. 626/96 and subsequent modifications which apply the Directive 93/68/CEE.
3. Contractor is required to perform F/A systems testing in accordance with CEF close out check list (see attachment BUILDING ACCEPTANCE CHECKLIST 01 Feb 2011);
4. At the end of the work, the Contractor shall provide the Government with three copies of the following documents:
- Certificate of Compliance with Law No. No. 37 dated 22 January 2008, for the installation of the electrical and mechanical systems in a workmanlike manner, signed by the
Contractor.
- Final Acceptance Test Certifications for electrical and mechanical systems signed by a
Registered Engineer to be selected among three candidates proposed by the Contractor to the Contracting Officer in accordance with Law No. 37 dated 22 January 2008.
- Certificate of Static Test of the structure in accordance with D.M. 14/2008, signed by a
Registered Engineer authorized to perform tests in seismic area, selected among three candidates proposed by the Contractor to the Contracting Officer.
- For warranty call purpose, 3 copies of letter identifying project number, item, company address, phone number, point of contact, item warranty expiration date, etc. One copy of the letter will be installed next the item for immediate consultation;
- 3 set of AS BUILT drawings signed and stamped by qualified engineer and CD with
AutoCAD and pdf electronic version of same drawings (AutoCAD Release 2007 for drawings. Drawings shall be geospatially referenced using real world coordinates WGS-
1984 UTM 33N. 31CEP/CEPT section (0434-305488) will provide an AutoCAD drawing that is geospatially referenced for the contractor to use as a background);
- 3 copies of O&M manuals and CD with pdf electronic version of same documentation.
Section 01100/R 20
REVISED MASTER SPECIFICATIONS
SECTION 01100/R GENERAL CONDITIONS
SECTION 01101/R PROJECT SIGN
SECTION 02220/R SITE DEMOLITION
SECTION 02510R WATER DISTRIBUTION
SECTION 02551/R NATURAL GAS DISTRIBUTION
SECTION 02630/R STORM DRAINAGE
SECTION 03300/R CAST-IN-PLACE CONCRETE
SECTION 04200/R MASONRY
SECTION 05120/R STRUCTURAL STEEL
SECTION 05500/R METAL FABRICATIONS
SECTION 07600/R FLASHING AND SHEET METAL
SECTION 07840/R FIRESTOPPING
SECTION 07920/R JOINT SEALANTS
SECTION 08110/R STEEL DOORS AND STEEL FRAMES
SECTION 08120/R ALUMINUM DOORS, FRAMES AND SIDELIGHTS
SECTION 09510/R ACOUSTICAL CEILING
SECTION 09900/R PAINTS AND COATINGS
SECTION 13856/N GAS LEAK DETECTION AND PREVENTION SYSTEM
SECTION 15050R BASIC MECHANICAL MATERIALS AND METHODS
SECTION 15070R MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
SECTION 15080R INSULATION FOR MECHANICAL SYSTEMS
SECTION 15181/R CHILLED WATER AND HOT WATER PIPING
SECTION 15810R DUCTWORK AND DUCTWORK ACCESSORIES
SECTION 16050/R 141
BASIC ELECTRICAL MATERIALS AND METHODS
SECTION 16303/R UNDERGROUND TRANSMISSION AND DISTRIBUTION LINES
SECTION 16316/R SWITCHBOARDS
SECTION 16402/R INTERIOR DISTRIBUTION SYSTEMS
SECTION 16510/R INTERIOR LIGHTING
SECTION 16530/R EXTERIOR LIGHTING
SECTION 244100/R LIGHTNING PROTECTION SYSTEM
Section 01100/R 21
SECTION 01100/R
GENERAL CONDITIONS
Revise Paragraph "3.2 UTILITY CUT-OFF" as follows:
Delete "ten (10) days" and insert "three (3) weeks" .
-- End of Section -
Section 01101/R 22
SECTION 01101/R
PROJECT SIGN
PART 1 - PROJECT SIGN
1.1 Scope
Furnish labor and material required for the construction and painting of a sign as shown on the attached sketch.
PART 2 - GENERAL
The Contractor shall identify the project by means of an appropriate sign mounted in a conspicuous area of the work site, as indicated by the Contracting Officer or his designated representative. The sign shall be erected within 10 days of initiation of work at the job site.
The sign shall contain the following information in English:
a. Project No.
b. Project description
c. Constructed under Supervision of Base Civil Engineering
d. Contracted by 31st Contracting Squadron
e. Contractor
f. Design Engineer
g. Inspector
h. Contract Management: 31 CONS Construction Flight
i. ERP Coordinates
Lettering of the sign will be as shown on the following sketch, and may be painted or stenciled directly on sign. The sign will remain the property of the Contractor, and shall be promptly removed upon completion of the project.
Section 01101/R 23
-- End of Section –-
ASHE 11-1091 CONSTRUCT ADDITION REPAIR
CORROSION CONTROL FAC.9109 AND DEMO FAC 973
AND 974
,AREA F
AREA F, AVIANO AIR BASE ITALY
SECTION 02220/R
SITE DEMOLITION
Add the following paragraph:
1.1.5 Electrical and Electronic Equipment Waste Disposal (RAEE)
Disposal of the Electrical and Electronic Equipment Waste (RAEE) shall be in compliance with
Legislative Decree No. 151 dated 25 July 2005: Accomplishment of the European Directive Relevant to the Electrical and Electronic Equipment Waste.
SECTION 02510R
WATER DISTRIBUTION
PART 1 - GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
ITALIAN NATIONAL INSTITUTE FOR THE UNIFICATION OF STANDARDS (UNI, UNI ISO)
UNI EN 1452-2 (2001) Plastics piping systems for water supply -
Unplasticized polyvinyl chloride) (PVC-U) – Pipes.
UNI 12201-1 (2004) Plastics piping systems for water supply -
Polyethylene (PE) – General.
UNI 12201-2 (2004) Plastic piping systems for water supply -
Polyethylene (PE) – Pipes.
UNI 12201-3 (2004) Plastics piping systems for water supply -
Polyethylene (PE) – Fittings.
UNI 9485 (1989) Fire fighting equipment - Cast iron stand pipe hydrants.
EUROPEAN COMMITTEE FOR STANDARDIZATION (CEN)
UNI EN 558-1 (2001) Industrial valves - Face-to-face and center-to-face dimensions of metal valves for use in flanged pipe systems - PN-Designated Valves.
UNI EN 558-2 (2001) Industrial valves - Face-to-face and centre-to-face dimensions of metal valves for use in flanged pipe systems - Class-Designated Valves.
1.2 DESIGN REQUIREMENTS
Delete.
1.3 SUBMITTALS
1.3.1 Product Data
a. Water service line piping, fittings, joints, valves, and coupling
Manufacturer's data and certificates for equipment, materials, finish and pertinent details for each system shall be submitted and approved before procurement, fabrication or delivery of such items to the job site. Partial submission will not be acceptable. Descriptive data shall be annotated to show the specific model, type and size of each item the Contractor proposes to furnish.
1.3.2 Manufacturer’s Instructions
a. Installation procedures for water piping
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery and Storage
Inspect materials delivered to site for damage. Unload and store with minimum handling. Store materials on site in enclosures or under protective covering. Store plastic piping under cover out of direct sunlight. Do not store materials directly on the ground. Keep inside of pipes, fittings, valves and hydrants free of dirt and debris.
1.4.2 Handling
Handle pipe, fittings, valves, hydrants, and other accessories in a manner to ensure delivery to the trench in sound undamaged condition. Take special care to avoid injury to coatings and linings on pipe and fittings; make satisfactory repairs if coatings or linings are damaged. Carry, do not drag pipe to the trench. Store plastic piping that are not to be installed immediately, under cover out of direct sunlight.
PART 2 - PRODUCTS
2.1 WATER DISTRIBUTION MAIN AND WATER SERVICE LINE MATERIALS
Delete
PART 3 - EXECUTION
3.1 INSTALLATION OF PIPELINES
3.1.5 Disinfection
Before acceptance for domestic use each unit of completed water line and distribution system shall be flushed and disinfected with sterilizing material before acceptance for domestic operation. One of the following materials shall be used for disinfecting the Water System by chlorinating:
3.1.5.1 Liquid Chlorine
Liquid chlorine shall be 99.5 percent pure by volume as obtained from vaporized liquid chlorine and suitable for use in water pipe sterilization. A certificate from the manufacturer shall be furnished to indicate the results of tests to determine the percent of chlorine.
3.1.5.2 Hypochlorite
3.1.5.2.1 Chlorinated Lime
For decontamination use shall conform to the requirements listed in Table I.
TABLE I
Chlorinated Lime
Available chlorine, min. % 30
Moisture, max % 3
Practicable size:
Retained on 100-mesh, min. % 0
Through 30-mesh, min. % 60
Through 14-mesh, min. % 98
Loss of available chlorine on heat, max. % 25
Total mixed oxides of heavy metal, plus
AL2)O3, max. % 50
Iron, max. % 25
Calcium hydroxide, min. % 15
Calcium hydroxide, max. % 35
Bulk density, min. grams/cm3 0.80
A certificate from the manufacturer shall be furnished to indicate the results of tests to determine the conformance with Table I above.
3.1.5.3 Sodium Hypochlorite
May be used for decontamination in place of chlorinated lime. The material shall be clear greenish-yellow liquid free from sediment or suspended matter. Available chlorine in the solution shall be not less than 10 percent and free alkali shall be not more than 1.5 percent by weight, calculated as
NaOH. A certificate from the manufacturer shall be furnished to indicate the results of tests to determine the percent of available chlorine and of free alkali.
3.1.5.4 Disinfection Method
Disinfection shall be accomplished as described below. After pressure tests have been completed and approved, the piping system to be disinfected shall be thoroughly flushed with water until all entrained dirt and mud have been removed before introducing the chlorinating material. The amount of chlorine applied shall be such as to provide a dosage of not less than 50 parts per million. The chlorinating material shall be introduced to the water lines and distribution system in a manner approved by the Contracting Officer’s Technical Representative. If possible to do so, the lines shall be thoroughly flushed before introducing of the chlorinating materials. After a contact period of not less than 24 hours, the system shall be flushed with clean water until the residual chlorine content is not greater than 1.0 part per million. All valves in the lines being disinfected shall be opened and closed several times during the contact period. From several points in the system, testing laboratory shall take at least three (3) samples of water utilizing sterilized containers for bacterial examination/analysis. The local Italian testing laboratory utilized to perform the test must be duly certified by the Italian state to perform such services. The disinfection procedure shall be repeated as many times as is necessary until test indicates compliance to the above specified requirements and the absence of bacterial pollutants for at least two (2) full days (48 hour period). The units will not be accepted until satisfactory bacteriological test results have been attained and a certified test result forwarded in writing to the Contracting Officer.
3.2 FIELD QUALITY CONTROL
3.2.1 Field Tests and Inspections
The Contracting Officer’s Technical Representative will conduct field inspections and witness field tests specified in this section. The Contractor shall perform field tests, and provide labor, equipment, and incidentals required for testing. The Contractor shall produce evidence, when required, that any item of work has been constructed in accordance with the drawings and specifications. Do not begin testing on any section of a pipeline where concrete thrust blocks have been provided until at least 5 days after placing of the concrete.
3.2.2 Pressure and Leakage Tests
Test water mains and water service lines in accordance with the following testing procedures and applicable specified requirements. On those distribution systems utilized for fire hydrants, sprinkler systems or other fire protection purposes, hydrostatic pressure for pressure test shall be 345 kPa in excess of the maximum working pressure of the system, but shall be not less than 1380 kPa and shall be held for a period of not less than two hours. On those water lines not utilized for fire protection purposes, the hydrostatic pressure for the pressure test shall be 345 kPa in excess of the maximum working pressure of the system. The hydrostatic pressure for the pressure test shall not be less than 1030 kPa and shall be held for a period of not less than two hours. Prior to the pressure test, that portion of the water line being treated shall be filled with water for a period of not less than 24 hours. Hydrostatic pressure for leakage test for all systems shall be the maximum working pressure of the system. Leakage test may be performed at the same time and at the same test pressure as the pressure test. Pipe, joints, valves and fittings in the test section shall be examined. Equipment shall be tested in operation to demonstrate compliance with specification requirements. Each hydrant and all control valves shall be fully opened and closed under water pressure. The duration of each leakage test shall be two hours, and during the test, the pipe shall be subjected to the normal working pressure for the section of line being tested. These pressures will be based upon the lowest point of the section of line being tested.
3.2.3 Special Testing Requirements
For pressure test, use a hydrostatic pressure 375 kPa greater than the maximum working pressure of the system, except that for those portions of the system having pipe size larger than 50 mm in diameter, hydrostatic test pressure shall be not less than 1400 kPa. Hold this pressure for not less than 2 hours. Prior to the pressure test, fill that portion of the pipeline being tested with water for a soaking period of not less than 24 hours. For leakage test, use a hydrostatic pressure not less than the maximum working pressure of the system. Leakage test may be performed at the same time and at the same test pressure as the pressure test.
3.2.4 Allowable Leakage
No leakage will be allowed.
3.2.5 Repair
Should any test on pipe laid disclose leakage greater than specified above, the Contractor shall, at his own expense, locate and repair the line.
-- End of Section --
Section 02579/R 31
SECTION 02551/R
NATURAL GAS DISTRIBUTION
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B31.8 Gas Transmission and Distribution Systems.
ITALIAN NORMS AND CODES
Ministerial Decree (37/2008) Plant Safety.
Law No. 1083 (6 Dec. 1971) Gas Distribution Safety Norms.
Norm P11724/4134 Gas Distribution.
Ministerial Decree (12 Apr. 1996) Approval of the Fire Prevention Technical
Norm for Design, Construction and Operation of Gas
Fired Thermal Plants.
D.P.R. No. 412 (26 August 1993) Regulation for Design, Construction, Operation and Maintenance of Thermal Plants in
Execution of Law No. 10, Art.4, Paragraph 4, dated 9
January 1991.
Legislative Decree No. 493 (14 August 1996)Execution of 92/58/CEE
Regulation Concerning Minimum Requirement for Signs.
ITALIAN NATIONAL INSTITUTE FOR THE UNIFICATION OF STANDARDS (UNI)
PUBLICATIONS
Section 02220/R 32
UNI 5634 (1997)Identification colors for pipes conveying liquid or gaseous fluids.
UNI 7129 (2008) Gas plants for domestic use fed by network distribution. Design, installation and maintenance.
UNI 7615 (1976) High Density Polyethylene Pipes. Test Methods.
UNI 7616 (1976) High density polyethylene fittings for pipes under pressure. Test methods.
UNI 9860 (1991) Gas service pipes. Design, construction and testing.
UNI EN 10208-1 (1999) Steel pipes for pipelines for combustible fluids -
Technical delivery conditions - Pipes of requirement class A.
UNI EN 10208-2 (1998) Steel pipes for pipelines for combustible fluids -
Technical delivery conditions - Pipes of requirement class B.
UNI 9034 (2004) Gas distribution pipelines with maximum operating pressure < or = 5 bar. Materials and joining systems.
UNI 9165 (2004) Gas distribution networks. Pipeworks with maximum operating pressures up to 5 bar. Design, construction, testing, operation, and rehabilitation.
UNI 9860 (1998)Gas service pipes. Design, construction and testing.
UNI EN 1555 (2004) Plastic piping systems for the supply of gaseous fuels.
1.2 RELATED REQUIREMENTS
Section 02579/R 33
Section 15050, entitled…