CONSTRUCTION COST ESTIMATE BREAKDOWN

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Works

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RENOVATE BLDG 7300 FOR 56TH SQUADRON, FAC.7300
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1039 RAREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Civil Demolitions - Ia Demolizioni Civili
1CUT AND REMOVAL OF EXISTING ASPHALT PAVEMENT
Taglio e rimozione di pavimentazione in asfalto esistenteIT. No. Art. n.1SM/MQ
2SOIL EXCAVATION FOR NEW CONCRETE PAD FOUNDATION
Scavo nel terreno per fondazioni nuova pedana in cementoIT. No. Art. n.2CM/MC
3CUT AND REMOVAL OF EXISTING METAL FENCE PORTION
Taglio e rimozione di porzione di recinzione esistenteIT. No. Art. n.3SM/MQ
4TRENCH EXCAVATION FOR NEW PEDESTRIAN AND VEHICULAR ACCESS GATES FOUNDATIONS
Scavo a trincea per le fondazioni dei nuovi cancelli di accesso pedonale e carrabileIT. No. Art. n.4CM/MC
Total Civil Demolitions - Totale Demolizioni Civili
Ib Architectural Demolitions - Ib Demolizioni Architettoniche
5REMOVAL OF EXISTING INTERIOR DOORS
Rimozione di porte interne esistentiIT. No. Art. n.5EA/NO
6REMOVAL AND STORAGE OF EXISTING 60x60cm MINERAL FIBER PANELS OF SUSPENDED CEILING
Rimozione e conservazione di pannelli in fibra minerale 60X60cm del controsoffitto esistenteIT. No. Art. n.6SM/MQ
7REMOVAL OF ENTIRE PORTION OF EXISTING MINERAL FIBER PANELS SUSPENDED CEILING
Rimozione dell'intera porzione di controsoffitto esistente in pannelli di fibra mineraleIT. No. Art. n.7SM/MQ
8REMOVAL OF EXISTING VENTILATION METAL DUCTS
Rimozione di canali metallici di ventilazione esistentiIT. No. Art. n.8EA/NO
9DISASSEMBLY OF EXISTING INTERIOR DOORS
Smontaggio di porte interne esistentiIT. No. Art. n.9EA/NO
10REMOVAL OF EXISTING WINDOWS
Rimozione di finestre esistentiIT. No. Art. n.10EA/NO
11CUT AND REMOVAL OF EXISTING GYPSUM BOARD PARTITIONS FOR NEW OPENINGS
Taglio e rimozione di tramezzi in cartongesso esistenti per nuove apertureIT. No. Art. n.11SM/MQ
12DEMOLITION OF EXISTING GYPSUM BOARD PARTITIONS
Demolizione di tramezzi esistenti in cartongessoIT. No. Art. n.12SM/MQ
13REMOVAL OF FOLDING PARTITION WALL
Rimozione di parete mobileIT. No. Art. n.13LS/AC
14REMOVAL OF EXISTING FLOOR METAL GRATE
Rimozione di grata metallica a pavimentoIT. No. Art. n.14LS/AC
15PREPARATION OF EXISTING CONCRETE PAVEMENT
Preparazione di pavimento in cemento esistenteIT. No. Art. n.15SM/MQ
Total Architectural Demolitions - Totale Demolizioni Architettoniche
Id Mechanical Demolitions - Demolizioni Meccaniche0.000.000.00
16REMOVAL OF EXISTING DUCTWORKS AND ACCESSORIES AS SHOWN IN THE DESIGN DRAWINGS
Rimozione delle esistenti canalizzazioni ed accessori come indicato nei disegni di progettoIT. No. Art. n.16LS/AC
17REMOVAL OF EXISTING EXHAUST GAS FAN, DUCTWORK AND FITTINGS
Rimozione dell'esistente estrattore gas di scarico, canali e accessori.IT. No. Art. n.17LS/AC
18REMOVAL OF EXISTING AIR COMPRESSED PIPING AND FITTINGS
Rimozione dell'esistente tubazione dell'aria compressa e accessoriIT. No. Art. n.18LS/AC
19REMOVAL OF EXISTING EMERGENCY EYEWASH/SHOWER, PIPING AND FITTINGS
Rimozione dell'esistente lavaocchi/doccia di emergenza, tubazione e accessoriIT. No. Art. n.19LS/AC
Total Mechanical Demolitions - Totale Demolizioni Meccaniche
Ie Electrical Demolitions - Ie Demolizioni Elettriche
20REMOVE TELECOM OUTLETS
Rimozione PreseTelecomunicazioniIT. No. Art. n.20LS/AC
21REMOVE ELECTRICAL OUTLETS
Rimozione Prese ElettricheIT. No. Art. n.21LS/AC
Total Electrical Demolitions - Totale Demolizioni Elettriche0.000.000.00
TOTAL PART I - Totale Parte I0.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Civil - IIa Civile
22NEW REINFORCED CONCRETE PAD
Nuova pedana in cemento armatoIT. No. Art. n.1CM/MQ
23NEW SECURITY METAL FENCE WITH ACCESS GATE
Nuova recinzione metallica sicurezza con cancello accessoIT. No. Art. n.2SM/MQ
24NEW PEDESTRIAN ACCESS GATE WITH CIPHER LOCK
Nuovo cancello pedonale con serratura a tastieraIT. No. Art. n.3EA/NO
25NEW VEHICULAR SLIDING ACCESS GATE IN METAL FENCE
Nuovo cancello carrabile scorrevole nella recinzioneIT. No. Art. n.4EA/NO
26NEW REINFORCED CONCRETE FOUNDATION PLINTHS
Nuovi plinti di fondazione in cemento armatoIT. No. Art. n.5CM/MC
27NEW VEHICLE LIFTS INSTALLATION
Installazione di nuovi ponti sollevatoriIT. No. Art. n.6EA/NO
28BACKFILLING OF TRENCH EXCAVATION
Riempimento di scavo a trinceaIT. No. Art. n.7CM/MC
29RESTORATION OF ASPHALT PAVEMENT
Ripristino di pavimentazione in asfaltoIT. No. Art. n.8SM/MQ
Total Civil - Totale Civile
IIb Architectural - IIb Architettonico
30BLOCK-UP OF EXISTING DOOR OPENING
Chiusura di vani porta esistentiIT. No. Art. n.9SM/MQ
31NEW SOUNDPROOF GYPSUM BOARD PARTITIONS
Nuovi tramezzi in cartongesso fonoisolantiIT. No. Art. n.10SM/MQ
32NEW INTERIOR STC45 SOUNDPROOF DOOR
Nuova porta interna fonoisolata STC45IT. No. Art. n.11aEA/NO
33NEW SLIDING SOUNDPROOF DOOR
Nuova porta esterna fonoisolataIT. No. Art. n.11bEA/NO
34NEW STAINLESS STEEL COVER PLATE
Nuova piastra di copertura in acciaio inoxIT. No. Art. n.12EA/NO
35DOOR UPGRADE FOR ACCESS CONTROL SYSTEM
Adeguamento porta per impianto controllo accessiIT. No. Art. n.13EA/NO
36NEW GSA APPROVED COMBINATION LOCK
Nuova serratura a combinazione approvata dal GSAIT. No. Art. n.14EA/NO
37NEW MECHANICAL CIPHER LOCK
Nuova serratura a tastiera meccanicaIT. No. Art. n.15EA/NO
38NEW NO-SKID EPOXY RESIN PROTECTIVE TREATMENT
Nuovotrattamento protettivo antiscivolo in resina epossidicaIT. No. Art. n.16SM/MQ
39REINSTALLATION OF SUSPENDED CEILING PANELS
Reistallazione di pannelli controsoffittoIT. No. Art. n.17SM/MQ
40NEW MINERAL FIBER PANELS SUSPENDED CEILING
Nuovo controsoffitto in pannelli di fibra mineraleIT. No. Art. n.18SM/MQ
41BLOCK-UP OF EXISTING WINDOW OPENING
Chiusura di vani finestra esistentiIT. No. Art. n.19SM/MQ
42INTERIOR WALL PAINTING
Verniciatura pareti interneIT. No. Art. n.20SM/MQ
43EXTERIOR WALL PAINTING
Verniciatura pareti esterneIT. No. Art. n.21SM/MQ
44REINSTALLATION OF EXISTING MODIFIED INTERIOR DOOR
Reinstallazione di porta interna esistente modificataIT. No. Art. n.22EA/NO
45BLOCK-UP OF EXISTING VEHICLE INSPECTION PIT Chiusura di fossa ispezione veicoli esistenteIT. No. Art. n.23LS/AC
Total Architectural - Totale Architettonico
TOTAL PART II / Totale Parte II0.000.000.000.00
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
IIIa HVAC - IIIa HVAC
46HVAC HOT AND CHILLED WATER PIPEWORKSYSTEM UPGRADE, ON/OFF VALVES, CONTROL VALVES & FITT.
Modifica del sistema acqua calda/refrigerata HVAC in centrale, valvole on/off ed accessoriIT. No. Art. n.1LS/AC
47HVAC PIPEWORK FOR NEW FANCOILS AND ERU COIL AND FITTINGS
Rete di distribuzione HVAC per nuovi fan coil e batteria ERU e accessoriIT. No. Art. n.2LS/AC
48VERTICAL CABINET FANCOIL AND FITTINGS-TYPE FCU-V01
Ventilconvettore a pavimento e accessori-tipo FCU-V01IT. No. Art. n.3aEA/NO
49VERTICAL CABINET FANCOIL AND FITTINGS-TYPE FCU-V02
Ventilconvettore a pavimento e accessori-Tipo FCU-V02IT. No. Art. n.3bEA/NO
50FANCOIL CONTROL SYSTEM W/ 2-WAY MODUL. VALVE PRESSURE INDIPENDENT, VALVES, FILTER AND FITTINGS
Sistema di controllo ventilconvettore con valvola modulante 2-vie indipendente dalla pressione, valvole, filtro ed accessoriIT. No. Art. n.4aEA/NO
51FANCOIL CONTROL SYSTEM W/ 3-WAY MODUL. VALVE PRESSURE INDIPENDENT, VALVES, FILTER AND FITTINGS
Sistema di controllo ventilconvettore con valvola modulante 3-vie indipendente dalla pressione, valvole, filtro ed accessoriIT. No. Art. n.4bEA/NO
52UPGRADE EXISTING DDC SYSTEM, WIRING & FITTINGS
Modifica del sistema DDC esistente, collegamenti ed accessoriIT. No. Art. n.5LS/AC
53ERU-1 FOR FRESH AIR TREATMENT AND HEAT RECOVERY W/ CONTROLS,AND FITTINGS
ERU-1 per trattamento aria di rinnovo e recupero calore compresi controlli ed accessoriIT. No. Art. n.6EA/NO
54NEW FRESH/EXHAUST DUCTWORK, FITTINGS AND ACCESSORIES
Nuove canalizzazioni di rinnovo ed estrazione aria ed accessoriIT. No. Art. n.7LS/AC
55PVC HVAC CONDENSATE DRAIN PIPE AND FITTINGS
Linea di scarico condense in PVC per HVAC e accessoriIT. No. Art. n.8LS/AC
56MITIGATION OF VULNERABILITY IN MECH UTILITY PENETRATING THE WALL OF CLASSIFIED AREA
Mitigazione della vulnerabilità dei componenti meccanici che attraversano le pareti dell'area classificataIT. No. Art. n.9LS/AC
57TESTING; ADJUSTING AND BALANCING OF THE HVAC SYSTEMS
Prove, tarature e bilanciamento impianti HVACIT. No. Art. n.10LS/AC
Total HVAC - Totale HVAC
IIIb Plumbing - IIIb Idrico sanitario
58INSTALLATION AND CERTIFICATION OF A SCUBA AIR COMPRESSED STATION PROVIDED BY GOVERNMENT
Installazione e certificazione della stazione aria compressa per sub fornita dal governo (FURTHER ANALYSIS REQ.)IT. No. Art. n.1LS/AC
59NEW AIR COMPRESSED COPPER PIPING AND FITTINGS FOR SCUBA AIR COMPRESSED STATION
Nuova tubazione in rame e accessori per la nuova stazione aria compressa per subIT. No. Art. n.2LS/AC
60CONNECTION OF NEW CONDENSATE DRAIN PIPEWORK TO EXISTING BUILDING STORM WATER SYSTEM
Connessione delle nuove tubazioni di scarico condensa al sistema acque meteoriche dell'edificioIT. No. Art. n.3LS/AC
Total Plumbing - Totale Idrico sanitario
IIIc Fire Suppression - IIIc Spegnimento incendi
61SPRINKLER HEADS ADJUSTMENT IN ACCORDANCE WITH NEW ROOM LAYOUT AND DUCTS INTERFERENCES
Riposizionamento delle testine sprinkler in accordo con il nuovo layout e le interferenze dei nuovi canaliIT. No. Art. n.1LS/AC
Total Fire suppression - TotaleSpegnimento incendi
TOTAL PART III / Totale Parte III0.000.000.000.000.000.00
PART IV - ELECTRICAL WORK / Parte IV - Lavori Elettrici
62NEW BACKUP POWER GENERATOR 250 kVA
Nuovo gruppo elettrogeno da 250 kVAIT. No. Art. n.1aEA/NO
63New 4P-400 A CIRCUIT BREAKER
Nuovo interruttore 4P-400 AIT. No. Art. n.2EA/NO
64NEW CABLE FG16R16 3x120+70N+G70
Nuovo cavo FG16R16 3x120+70N+G70IT. No. Art. n.3LM/M
65New DB8A panel
Nuovo quadro DB8AIT. No. Art. n.4EA/NO
66FURNISHING AND INSTALL. OF ITALIAN STYLE OUTLETS
Fornitura e installazione Prese tipo italianoIT. No. Art. n.5EA/NO
67OUTLET POINT
Punto presaIT. No. Art. n.6EA/NO
68EXTERNAL OUTLET POSTS
Punti prese esterniIT. No. Art. n.7aEA/NO
69EXTERNAL OUTLETS
Punti prese esterniIT. No. Art. n.7bEA/NO
70DIAM. 110 MM PVC CABLEDUCT
Cavidotto in PVC diam. 110 mmIT. No. Art. n.8aLM/ML
71NEW 500x500x500 PRECAST CONCRETE MANHOLE
Nuovo pozzetti in cap 500x500x500IT. No. Art. n.8bEA/NO
722P-16A CIRCUIT BREAKER
INTERRUTTORI 2P-16 AIT. No. Art. n.9EA/NO
733G 1,5 SQMM FG16R16 CABLE
Cavo 3G1,5 mmq FG16R16IT. No. Art. n.10LM/ML
745G 4 SQMM FG16R16 CABLE
Cavo 5G4 mmq FG16R16IT. No. Art. n.11aLM/ML
753G 1,5 SQMM FG16R16 CABLE
Cavo 3G1,5 mmq FG16R16IT. No. Art. n.11b-11c-11dLM/ML
763G 1,5 SQMM FG16R16 CABLE
Cavo 3G1,5 mmq FG16R16IT. No. Art. n.12LM/ML
773G 1,5 SQMM FG16R16 CABLE
Cavo 3G1,5 mmq FG16R16IT. No. Art. n.13LM/ML
781P+N-6A CIRCUIT BREAKER
INTERRUTTORI 1P+N-6AIT. No. Art. n.14aEA/NO
793P+N-25A CIRCUIT BREAKER
INTERRUTTORI 3P+N-25AIT. No. Art. n.14bEA/NO
801P+N-6A CIRCUIT BREAKER
INTERRUTTORI 1P+N-6AIT. No. Art. n.15EA/NO
811P+N-6A CIRCUIT BREAKER
INTERRUTTORI 1P+N-6AIT. No. Art. n.16EA/NO
82NEW ELECTRONIC ACCESS CONTROL SYSTEM
Nuovo impianto controllo elettronicoIT. No. Art. n.17EA/NO
83ELECTRICAL SYSTEMS TESTS
Collaudo Impianti ElettriciIT. No. Art. n.18LS/AC
Total Power System - Totale Impianto Forza Motrice
IVb Lighting System System - Impianto Illuminazione
84LIGHTING POINT: LIGHTING SWITCH
Punto luce: Interruttore luceIT. No. Art. n.19EA/NO
85LIGHTING SIGN
Segnale luminosoIT. No. Art. n.20EA/NO
86ROTATING BLUE LIGHT
Luce blu rotanteIT. No. Art. n.21EA/NO
Total Ligting System System - Totale Impianto Illuminazione
IVc Communication SYSTEM - Impianto Comunicazioni
87COMMUNICATION OUTLETS
Prese per comunicazioniIT. No. Art. n.22EA/NO
88COMMUNICATION OUTLET POINT
Punto presa TVIT. No. Art. n.23EA/NO
89TV SAT OUTLETS
PresA TV SATIT. No. Art. n.24EA/NO
90TELECOMM SYSTEM TESTS
Collaudo Impianto TelefonicoIT. No. Art. n.25LS/AC
Total Communication SYSTEM - Totale Impianto Comunicazioni
IVd Antennas SYSTEM - Impianto Antenne
91Antenna system predisposition - Predisposizione impianto antenna
Collaudo Impianto TelefonicoIT. No. Art. n.A1LS/AC
Total Communication SYSTEM - Totale Impianto Comunicazioni
Total Electrical - Totale Elettrico
TOTAL PART IV / Totale Parte IV
SUMMARY
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS0.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORKS0.000.000.000.000.000.00
PART III - MECHANICAL WORK0.000.000.000.000.000.00
PART IV - ELECTRICAL WORK0.000.000.000.000.000.00
TOTAL PRICE / Costo Totale0.000.000.000.00

Page &P of &N

Grand Total

RENOVATE BLDG 7300 FOR 56TH SQUADRON, FAC.7300 - AREA F, AVIANO AB - ITALY
INSTRUCTIONS FOR COMPLETING
TOTAL MATERIAL COSTS€0.00
TOTAL LABOR COSTS€0.00
TOTAL OTHER DIRECT COSTS€0.00
TOTAL DIRECT COSTS€0.00
OVERHEAD%€0.00
SUBTOTAL€0.00
PROFIT%€0.00
TOTAL PRICE€0.00
DATEFIRM NAME
TITLEBY
INSTRUCTIONS TO OFFERORS

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on…