ASHE_16_1030_SOW_Addendum_1.pdf
PDF 110 KB Posted
- Solicitation number
- FA5682-17-R-0036
About this file
ADDENDUM #1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDITIONAL_REQUIREMENTS_25_May_2017.pdf | ||
| ASHE_16_1030_CNS_Cost_Estimate_Breakdown_blank.xlsx | XLSX spreadsheet | |
| FA5682-17-R-0036-0001.pdf | ||
| ASHE16_1030_MATERIAL_SUBMITTAL_SCHEDULE__Rev.1.xlsx | XLSX spreadsheet | |
| ASHE_16_1030_CNS_Cost_Estimate_Breakdown_Blank.pdf | ||
| UFGS_BACnet_2015.docx | DOCX document | |
| FA5682-17-R-0036.pdf | ||
| ASHE_16_1030_Technical_Specifications_Rev3.pdf | ||
| 1478_MBF_&_P.O._honeywell.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project # ASHE 16-1030 ADD#1 Technical Specifications
DATE: JUNE 2017
31CES/CEMN 1
Date: JUNE 2017
U.S. AIR FORCE
31ST FIGHTER WING
31ST CES/CENM
AVIANO AIR BASE, ITALY
TECHNICAL SPECIFICATIONS FOR
ASHE 16-1030 REPAIR HVAC SYSTEM MULTI
AREA F, AVIANO AB, ITALY
ADDENDUM#1
Project # ASHE 16-1030 ADD#1 Technical Specifications
DATE: JUNE 2017
31CES/CEMN 2
1. Bldg 14671.
Paragraph “f” Pipeline, valves, Pressure and Temperature gauges .
• All valves must be heavy duty, total passage, PN50.
Qty: 6 Each
2. Bldg 1478 Upgrade DDC at Base Theatre & Post Office.
Paragraph b, Surge Protection devices (SPD).
Note: see attached reference Manual UFGS 23 09 23.13 20 BACnet DDC System for HVAC, Para 2.4.2, Surge and Transient Protection
• Furnishing and installation of SPD type 1, 2 and 3, type “DEHN Red Line” or equal approved.
Qty: 12 Each
3. Bldg 1204 Heavy Drop facility.
Paragraph c, Modification of existing Air Handling Unit (AHU1) with new cooled water coil
• Cooling capacity of new cooled water coil is 21 KW.