ASHE_16_1030_CNS_Cost_Estimate_Breakdown_Blank.pdf

PDF 21 KB Posted

Attached to
REPAIR HVAC SYSTEM MULTI AREA F, AVIANO AB, ITALY
Solicitation number
FA5682-17-R-0036
Issued by

About this file

CONSTRUCTION COST ESTIMATE BREAKDOWN

View the file

Other files

File Type Posted
ADDITIONAL_REQUIREMENTS_25_May_2017.pdf PDF
ASHE_16_1030_SOW_Addendum_1.pdf PDF
ASHE_16_1030_CNS_Cost_Estimate_Breakdown_blank.xlsx XLSX spreadsheet
FA5682-17-R-0036-0001.pdf PDF
ASHE16_1030_MATERIAL_SUBMITTAL_SCHEDULE__Rev.1.xlsx XLSX spreadsheet
UFGS_BACnet_2015.docx DOCX document
FA5682-17-R-0036.pdf PDF
ASHE_16_1030_Technical_Specifications_Rev3.pdf PDF
1478_MBF_&_P.O._honeywell.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY Sheet 1 of 1

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

REPAIR HVAC SYSTEM MULTI

PURCHASE REQUEST NUMBER PROJECT NUMBER ASHE 16-1030 WORK LOCATION Area F, Aviano AB.

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 BOILER ROOM, REMOVALS IT. No.

Art. n. 3.1a L.S. 1

2 TEMPORARY BOILER IT. No.

Art. n. 3.1b L.S. 1

3 BOILER ROOM EXPANSION IT. No.

Art. n. 3.1c L.S. 1

4 NEW BOILERS AND BURNERS (2ea) IT. No.

Art. n. 3.1d L.S. 1

5 NEW HOT WATER STORAGE TANKS (2ea) IT. No.

Art. n. 3.1e L.S. 1

6 PIPELINE & VALVES IT. No.

Art. n. 3.1f L.S. 1

7 NEW MAIN ELECTRICAL DISTRIBUTION PANEL IT. No.

Art. n. 3.1g L.S. 1

8 NEW AIR TREATMENT UNIT IT. No.

Art. n. 3.1h L.S. 1

9 NEW DDC SYSTEM IT. No.

Art. n. 3.2a L.S. 1

10 SURGE PROTECTION DEVICES (SPD) IT. No.

Art. n. 3.2b L.S. 1

11 REMOVAL AND CIVIL WORKS IT. No.

Art. n. 3.3.a L.S 1

12 NEW CHILLER IT. No.

Art. n. 3.3.b L.S 1

13 MODIFICATION OF AHU1 IT. No.

Art. n. 3.3c L.S 1

14 NEW PIPING SYSTEM IT. No.

Art. n. 3.3d L.S 1

15 REPLACEMENT OF SPLIT UNIT IN COMM RM IT. No.

Art. n. 3.3e L.S 1

16 REPLACEMENT OF WATER SOFTNER IT. No.

Art. n. 3.3f L.S 1

TOTAL COST

2017 $/Euro Currency Rate = 0.899

3.1 Bldg 14671 Mensa kitchen Boiler

MATERIAL PLUS LABOR COST

3.2 Bldg 1478 UPGRADE DDC IN BASE THEATER & POST OFFICE

3.3 Bldg 1204 HEAVY DROP FACILITY

ASHE 16-1030