ASJJ_16-1028_SCHEDULE_OF_MATERIAL_SUBMITTALS.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Sustain HVAC & Fire Alarm System, Bldg 407, Area C, Aviano AB, Italy
Solicitation number
FA5682-16-R-0016
Issued by

About this file

SCHEDULE OF MATERIAL SUBMITTALS

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION / CONTRACT NO.
ASJJ 16-1028SUSTAIN HVAC AND FIRE ALARM SYS bldg 407 BLDG 600
(To be completed by Project Architect or Engineer)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCEDESIGNSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

fergusog: Enter any comments pertaining to the submittal

BOILER & VENTILATION RMs
13.3 ELECT. DISTR. PANEL boiler room3330
23.4 BOILER33330
33.5 PUMPS3330
43.6 SCHEMATIC OF CIRCUIT boiler rm3330
53.8 INVERTERS Ventilation rm33330
63.9 FAN COIL33330
FIRE DETECTION SYSTEM
74.1 - 4.6 DESIGN PHASE3333330
85.0 FIRE ALARM PANEL33330
95.0 ADDITIONAL 24v TRANSFORMERS33330
105.0 GALVAN. STEEL PIPE3330
115.0 WIRE 2X1.53330
125.0 SMOKE DETECTOR3330
135.0 OPT.ACOUST. REPEATER3330
145.0 HEAT DETECTOR3330
155.0 MANUAL PULL BOX3330
165.0 SMOKE DETECT. AIR DUCT3330
17OPT.ACOUST. 97dB SIREN3330
1
2
3
4
5
6
7
8
9
10
11
12

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)

File details come from the government source that posted it. Updated .