AMENDMENT FA5682-16-R-0016-0001

View the file

Other files

File Type Posted
ASJJ_16-1028_SOW_Revision_2_08_Jul_2016.pdf PDF
ADDITIONAL_REQUIREMENTS_29_JUNE_2016.doc DOC document
ASJJ_16-1028_SOW_REVISION__1.pdf PDF
FA5682-16-R-0016.pdf PDF
bldg407_Fancoils FA_autocad.pdf PDF
ASJJ_16-1028_SCHEDULE_OF_MATERIAL_SUBMITTALS.xlsx XLSX spreadsheet
ASJJ_16-1028_BLANK_Construction_Cost_Estimate.xlsx XLSX spreadsheet
ASJJ_16-1028_SOW_20_June_2016.doc DOC document
bldg407_Fancoils FA_autocad.pdf PDF
ASJJ_16-1028_SCHEDULE_OF_MATERIAL_SUBMITTALS.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1F3A26161A001 ASJJ 16-1028

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

- change project performance period;

- replace Technical Specifications Revision #1 with Technical Specifications Revision #2 as indicated in the below Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5682-16-R-0016

X 9B. DATED (SEE ITEM 11)

29-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jul-2016

CODE

31 CONS LGC - FA5682

VIA PORDENONE 89/B, AREA "E" EDIF. 600

BASE AEREA DI AVIANO

AVIANO (PN) 33081

FA5682 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA5682-16-R-0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The contractor period of performance end date has increased by 30 days from 120 days to 150 days.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from THE CONTRACTOR SHALL FURNISH ALL

LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER

NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW

AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT

INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A. TECHNICAL SPECIFICATIONS FOR ASJJ

16-1028 SUSTAIN HVAC & FIRE ALARM SYSTEM, BLDG 407, AREA C, AVIANO AB, ITALY

REVISION#1, DATED JUNE 2016 AND MARKED TECHNICAL SPECIFICATIONS. - 13 WRITTEN PAGES

INCLUDING COVER PAGE, SCHEDULE OF MATERIAL SUBMITTALS AND DRAWINGSB. ADDITIONAL

REQUIREMENTS DATED 29 JUN 2016 - 3 WRITTEN PAGES to THE CONTRACTOR SHALL FURNISH

ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER

NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW

AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT

INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A. TECHNICAL SPECIFICATIONS FOR ASJJ

16-1028 SUSTAIN HVAC & FIRE ALARM SYSTEM, BLDG 407, AREA C, AVIANO AB, ITALY

REVISION#2, DATED JULY 2016 AND MARKED TECHNICAL SPECIFICATIONS. - 13 WRITTEN PAGES

INCLUDING COVER PAGE, SCHEDULE OF MATERIAL SUBMITTALS AND DRAWINGSB. ADDITIONAL

REQUIREMENTS DATED 29 JUN 2016 - 3 WRITTEN PAGES.

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

POP 01-AUG-2016 TO

29-NOV-2016

N/A 31 CES ENGINEER - F1F3A2

PIZZINATO CASSANDRA

UNIT 6110

APO AE 09601-6110

632-7560

FOB: Destination

F1F3A2

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

POP 01-AUG-2016 TO

29-DEC-2016

N/A 31 CES ENGINEER - F1F3A2

PIZZINATO CASSANDRA

UNIT 6110

APO AE 09601-6110

632-7560

FOB: Destination

F1F3A2

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS

The following documents are attachments to this document and are an integral part hereof:

a. Attachment 1:

Technical Specifications for ASJJ 16-1028 Sustain HVAC & Fire Alarm System, Bldg 407, Area C, Aviano

AB, Italy Revision #2 dated July 2016 and marked Technical Specifications.

- 13 pages including cover page, schedule of material submittals and drawings

b. Attachment 2:

Additional Requirements, dated 29 June 2016, 3 pages

SECTION M - EVALUATION FACTORS FOR AWARD

Section M - Evaluation Factors for Award

M001 SELECTION

a. Basis for Contract Award

This Solicitation is subject to the Simplified Acquisition Procedures (SAP) of the Federal Acquisition Regulation

(FAR) 13, Simplified Acquisition Procedures, as supplemented by the Defense Federal Acquisition Regulation

Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FARSite, http://farsite.hill.af.mil.

The Government will select the offer of the responsible vendor whose offer represents the best value after evaluation in accordance with the factors indicated in paragraph M002 below.

b. Number of Contracts to be Awarded

The Government intends to award one contract for the performance of project ASJJ 16-1028 Sustain HVAC & Fire

Alarm System, Bldg 407, Area C, Aviano AB, Italy Revision #2

c. Solicitation Requirements, Terms and Conditions

Offerors are required to meet all solicitation requirements. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.

M002 EVALUATION FACTORS

The following evaluation factors will be used to evaluate each offer.

Factor 1: Price determined to be reasonable and affordable.

The offeror’s price will be evaluated for award purposes based upon the total price offered. Offerors whose price cannot be determined to be reasonable and affordable may not be considered for award.

Factor 2: Technical Acceptability

This factor evaluates offeror’s current SOA certification for category OG11 and classification adequate to cover offeror’s amount for project performance. This requirement is met when the offeror includes a copy of the current

SOA certification for category OG11 and classification adequate to cover offeror’s amount for project performance.

(End of Summary of Changes)