AMENDMENT_FA5682-16-R-0016-0001.pdf
PDF 102 KB Posted
- Solicitation number
- FA5682-16-R-0016
About this file
AMENDMENT FA5682-16-R-0016-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASJJ_16-1028_SOW_Revision_2_08_Jul_2016.pdf | ||
| ADDITIONAL_REQUIREMENTS_29_JUNE_2016.doc | DOC document | |
| ASJJ_16-1028_SOW_REVISION__1.pdf | ||
| FA5682-16-R-0016.pdf | ||
| bldg407_Fancoils FA_autocad.pdf | ||
| ASJJ_16-1028_SCHEDULE_OF_MATERIAL_SUBMITTALS.xlsx | XLSX spreadsheet | |
| ASJJ_16-1028_BLANK_Construction_Cost_Estimate.xlsx | XLSX spreadsheet | |
| ASJJ_16-1028_SOW_20_June_2016.doc | DOC document | |
| bldg407_Fancoils FA_autocad.pdf | ||
| ASJJ_16-1028_SCHEDULE_OF_MATERIAL_SUBMITTALS.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1F3A26161A001 ASJJ 16-1028
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
- change project performance period;
- replace Technical Specifications Revision #1 with Technical Specifications Revision #2 as indicated in the below Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Jul-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5682-16-R-0016
X 9B. DATED (SEE ITEM 11)
29-Jun-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Jul-2016
CODE
31 CONS LGC - FA5682
VIA PORDENONE 89/B, AREA "E" EDIF. 600
BASE AEREA DI AVIANO
AVIANO (PN) 33081
FA5682 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5682-16-R-0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The contractor period of performance end date has increased by 30 days from 120 days to 150 days.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from THE CONTRACTOR SHALL FURNISH ALL
LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER
NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW
AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT
INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A. TECHNICAL SPECIFICATIONS FOR ASJJ
16-1028 SUSTAIN HVAC & FIRE ALARM SYSTEM, BLDG 407, AREA C, AVIANO AB, ITALY
REVISION#1, DATED JUNE 2016 AND MARKED TECHNICAL SPECIFICATIONS. - 13 WRITTEN PAGES
INCLUDING COVER PAGE, SCHEDULE OF MATERIAL SUBMITTALS AND DRAWINGSB. ADDITIONAL
REQUIREMENTS DATED 29 JUN 2016 - 3 WRITTEN PAGES to THE CONTRACTOR SHALL FURNISH
ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER
NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW
AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT
INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A. TECHNICAL SPECIFICATIONS FOR ASJJ
16-1028 SUSTAIN HVAC & FIRE ALARM SYSTEM, BLDG 407, AREA C, AVIANO AB, ITALY
REVISION#2, DATED JULY 2016 AND MARKED TECHNICAL SPECIFICATIONS. - 13 WRITTEN PAGES
INCLUDING COVER PAGE, SCHEDULE OF MATERIAL SUBMITTALS AND DRAWINGSB. ADDITIONAL
REQUIREMENTS DATED 29 JUN 2016 - 3 WRITTEN PAGES.
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-AUG-2016 TO
29-NOV-2016
N/A 31 CES ENGINEER - F1F3A2
PIZZINATO CASSANDRA
UNIT 6110
APO AE 09601-6110
632-7560
FOB: Destination
F1F3A2
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-AUG-2016 TO
29-DEC-2016
N/A 31 CES ENGINEER - F1F3A2
PIZZINATO CASSANDRA
UNIT 6110
APO AE 09601-6110
632-7560
FOB: Destination
F1F3A2
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS
The following documents are attachments to this document and are an integral part hereof:
a. Attachment 1:
Technical Specifications for ASJJ 16-1028 Sustain HVAC & Fire Alarm System, Bldg 407, Area C, Aviano
AB, Italy Revision #2 dated July 2016 and marked Technical Specifications.
- 13 pages including cover page, schedule of material submittals and drawings
b. Attachment 2:
Additional Requirements, dated 29 June 2016, 3 pages
SECTION M - EVALUATION FACTORS FOR AWARD
Section M - Evaluation Factors for Award
M001 SELECTION
a. Basis for Contract Award
This Solicitation is subject to the Simplified Acquisition Procedures (SAP) of the Federal Acquisition Regulation
(FAR) 13, Simplified Acquisition Procedures, as supplemented by the Defense Federal Acquisition Regulation
Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FARSite, http://farsite.hill.af.mil.
The Government will select the offer of the responsible vendor whose offer represents the best value after evaluation in accordance with the factors indicated in paragraph M002 below.
b. Number of Contracts to be Awarded
The Government intends to award one contract for the performance of project ASJJ 16-1028 Sustain HVAC & Fire
Alarm System, Bldg 407, Area C, Aviano AB, Italy Revision #2
c. Solicitation Requirements, Terms and Conditions
Offerors are required to meet all solicitation requirements. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.
M002 EVALUATION FACTORS
The following evaluation factors will be used to evaluate each offer.
Factor 1: Price determined to be reasonable and affordable.
The offeror’s price will be evaluated for award purposes based upon the total price offered. Offerors whose price cannot be determined to be reasonable and affordable may not be considered for award.
Factor 2: Technical Acceptability
This factor evaluates offeror’s current SOA certification for category OG11 and classification adequate to cover offeror’s amount for project performance. This requirement is met when the offeror includes a copy of the current
SOA certification for category OG11 and classification adequate to cover offeror’s amount for project performance.
(End of Summary of Changes)