ASJJ_16-1028_BLANK_Construction_Cost_Estimate.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- FA5682-16-R-0016
About this file
CONSTRUCTION COST ESTIMATE BREAKDOWN
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASJJ_16-1028_SOW_Revision_2_08_Jul_2016.pdf | ||
| AMENDMENT_FA5682-16-R-0016-0001.pdf | ||
| ADDITIONAL_REQUIREMENTS_29_JUNE_2016.doc | DOC document | |
| ASJJ_16-1028_SOW_REVISION__1.pdf | ||
| FA5682-16-R-0016.pdf | ||
| bldg407_Fancoils FA_autocad.pdf | ||
| ASJJ_16-1028_SCHEDULE_OF_MATERIAL_SUBMITTALS.xlsx | XLSX spreadsheet | |
| ASJJ_16-1028_SOW_20_June_2016.doc | DOC document | |
| bldg407_Fancoils FA_autocad.pdf | ||
| ASJJ_16-1028_SCHEDULE_OF_MATERIAL_SUBMITTALS.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASJJ 16-1028
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||
| CONTRACTOR | ADDRESS | |||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| SUSTAIN HVAC & FIRE ALARM SYSTEM Bldg 407 | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER ASJJ 16-1028 | Work location Area C, Fac# 407 | ||||||||||
| MATERIAL PLUS LABOR COST | ||||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | |||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| BOILER AND VENTILATION ROOM | ||||||||||||
| 1 | BOILER RM REMOVALS | IT. No. | 3.1 | L.S. | 1 | |||||||
| 2 | CIVIL WORKS IN BOILER & VENT RM | IT. No. | 3.2 | L.S. | 1 | |||||||
| 3 | ELECTRICAL WORKS IN BOILER ROOM | IT. No. | 3.3 | L.S. | 1 | |||||||
| 4 | MECHANICAL WORKS IN BOILER ROOM | IT. No. | 3.4 | L.S. | 1 | |||||||
| 5 | PUMPS REPLACEMENT | IT. No. | 3.5 | L.S. | 1 | |||||||
| 6 | PIPING SYSTEM BOILER RM | IT. No. | 3.6 | L.S. | 1 | |||||||
| 7 | MECHANICAL WORKS IN VENTILATION RM | IT. No. | 3.7 | L.S. | 1 | |||||||
| 8 | ELECTRICAL WORKS IN VENTILATION RM | IT. No. | 3.8 | L.S. | 1 | |||||||
| 9 | FAN COIL REPLACEMENT | IT. No. | 3.9 | L.S. | 1 | |||||||
| FIRE DETECTION SYSTEM | ||||||||||||
| 10 | FIRE ALARM DESIGN PHASE | IT. No. | 4.0 | L.S. | 1 | |||||||
| 11 | FIRE ALARM CONSTRUCTION | IT. No. Art. n. | 5.0 | EA | 1 | |||||||
| 0 | ||||||||||||
| TOTAL COST |