01101R_en.docx
DOCX document 149 KB Posted
- Solicitation number
- FA5682-16-R-0010
About this file
Section 01101R Master Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE_15-1046_KCCE_Addendum__2.xlsx | XLSX spreadsheet | |
| ASHE_15-1046_SOW_Addendum_2.doc.pdf | ||
| Amendment_FA5682-16-R-0010-0004.pdf | ||
| FA5682-16-R-0010-0003.pdf | ||
| FA5682-16-R-0010_Amendment_0002.pdf | ||
| FA5682-16-R-0010_ADDENDUM__1.pdf | ||
| FA5682-16-R-0010_Amendment_0001.pdf | ||
| Solicitation_FA5682-16-R-0010.pdf | ||
| ADDITIONAL_REQUIREMENTS_23_Mar_2016.doc | DOC document | |
| ASHE_15-1046_KCCE_Rev_1.xlsx | XLSX spreadsheet | |
| 09900_en.doc | DOC document | |
| ASHE_15-1046_Photo_Album_Rev_1_Feb_2016.pdf | ||
| 07600_en.doc | DOC document | |
| ASHE_15-1046_Map.pdf | ||
| 09212_en.doc | DOC document | |
| ASHE_15-1046_SOW_REV_2.pdf | ||
| 13281_en.doc | DOC document | |
| 01100_en.doc | DOC document | |
| 07112_en.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01101R
PROJECT SIGN
PART 1 - PROJECT SIGN
1.1 Scope
Furnish labor and material required for the construction and painting of a sign as shown on the attached sketch.
PART 2 - GENERAL
The Contractor shall identify the project by means of an appropriate sign mounted in a conspicuous area of the work site, as indicated by the Contracting Officer or his designated representative. The sign shall be erected within 10 days of initiation of work at the job site. The sign shall be 244 cm wide x 122 cm high and shall be constructed of a material suitable to withstand exposure to inclement weather for the duration of the contract, and must not show evidence of warping, cracking, or other defects. The sign shall have a dark brown background with white lettering, and shall contain the following information in English:
a. Project No.
b. Project description
c. Constructed under Supervision of Base Civil Engineering
d. Contracted by 31st Contracting Squadron
e. Contractor
f. Design Engineer: 31CES/CENM
g. Inspector
h. Contract Management: 31 CONS Construction Flight
i. ERP Coord
Lettering of the sign may be painted or stenciled directly on sign. The sign will remain the property of the Contractor, and shall be promptly removed upon completion of the project.
PROJECT TITLE
Design by
31CES/CE
N M Design by
31CES/CEPM
AREA 1, AVIANO AIR BASE ITALY
ASJD
10-1159 RPR ROOF/FLASHING, GUTTERS & DOWNSPOUTS,
CLINIC, FAC. #121
AREA "1", AVIANO AB, ITALY
AREA F
-- End of Section --