Solicitation FA5682-15-T-0007 Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HWQJ_16-1022_Construction_Cost_Estimate_Breakdown_REV._1.xls | XLS spreadsheet | |
| Attach___3 _HWQJ_16-1022 __Photos_of_5_Bldgs _REV._1.pptx | PPTX presentation | |
| Attach___2 _HWQJ_16-1022_-_Annex_1 _REV._1.doc | DOC document | |
| Solicitation_FA5682-15-T-0007_(Sustain_Exterior_Multi_Ghedi).pdf | ||
| HWQJ_16-1022_Technical_Specifications_Attachments.zip | ZIP file | |
| HWQJ_16-1022_Construction_Cost_Estimate_Breakdown.xls | XLS spreadsheet | |
| ADDITIONAL_REQUIREMENTS.doc | DOC document | |
| HWQJ_16-1022_Technical_Specifications.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1F3A25190A001 HWQJ 16-1022
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to change the closing date for receipt of offers and the number of days for Government acceptance of offers; replace the Technical Specif ications and the Construction Cost Estimate Breakdow n; change the offer submission instructions as indicated in the follow ing pages.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Sep-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5682-15-T-0007
X 9B. DATED (SEE ITEM 11)
28-Aug-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Sep-2015
CODE
31 CONS LGC - FA5682
VIA PORDENONE 89/B, AREA "E" EDIF. 600
BASE AEREA DI AVIANO
AVIANO (PN) 33081
FA5682 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5682-15-T-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 11-Sep-2015 04:00 PM to 15-Sep-2015 04:00 PM.
The offeror acceptance period has decreased by 4 from 19 to 15.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from THE CONTRACTOR SHALL FURNISH ALL
LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER
NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW
AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS PURCHASE ORDER
INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A. TECHNICAL SPECIFICATIONS FOR HWQJ
16-1022, SUSTAIN EXTERIOR MULTI FACILITIES GHEDI AB, ITALYWORK ITEMS 4.h AND 4.i OF THE
TECHNICAL SPECIFICATIONS- 29 PAGES INCLUDING COVER PAGE AND ATTACHMENTS #S 1, 2 &
3B. ADDITIONAL REQUIREMENTS, DATED 27 AUGUST 2015- 3 PAGES to THE CONTRACTOR SHALL
FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY
OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED
BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS PURCHASE
ORDER INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A. TECHNICAL SPECIFICATIONS
FOR HWQJ 16-1022, SUSTAIN EXTERIOR MULTI FACILITIES GHEDI AB, ITALY REV. 1WORK ITEMS
4.h AND 4.i OF THE TECHNICAL SPECIFICATIONS- 32 PAGES INCLUDING COVER PAGE AND
ATTACHMENTS #S 1, 2 & 3B. ADDITIONAL REQUIREMENTS, DATED 27 AUGUST 2015- 3 PAGES.
CLIN 0002
The CLIN extended description has changed from THE CONTRACTOR SHALL FURNISH ALL
LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER
NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW
AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS PURCHASE ORDER
INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A. TECHNICAL SPECIFICATIONS FOR HWQJ
16-1022, SUSTAIN EXTERIOR MULTI FACILITIES GHEDI AB, ITALYALL WORK ITEMS OF THE
PROJECT TECHNICAL SPECIFICATIONS EXCEPT 4.h AND 4.i- 29 PAGES INCLUDING COVER PAGE
AND ATTACHMENTS #S 1, 2 & 3B. ADDITIONAL REQUIREMENTS, DATED 27 AUGUST 2015- 3 PAGES to THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN
LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND
CONDITIONS OF THIS PURCHASE ORDER INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A.
TECHNICAL SPECIFICATIONS FOR HWQJ 16-1022, SUSTAIN EXTERIOR MULTI FACILITIES GHEDI
AB, ITALY REV. 1ALL WORK ITEMS OF THE PROJECT TECHNICAL SPECIFICATIONS EXCEPT 4.h
AND 4.i- 32 PAGES INCLUDING COVER PAGE AND ATTACHMENTS #S 1, 2 & 3B. ADDITIONAL
REQUIREMENTS, DATED 27 AUGUST 2015- 3 PAGES.
SECTION I - CONTRACT CLAUSES
The following have been modified:
GOVERNMENT FILL-INs
Clause 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
Insert: “30” and “45 calendar days after the date the contractor receives the notice to proceed”
52.236-4 PHYSICAL DATA (APR 1984)
Para (b) Insert: Average record for Aviano Air Base only, records for other work sites are not available.
% of Hr. Temp. is
Average Min. Extreme Min. Below 1C from Average Relative
Month Temp. (C) Temp. (C) 0600 to 1700 hrs. Humidity (%)
JAN -2 -13 19 74
FEB 0 -11 10 71
MAR 3 -12 5 66
APR 7 - 3 * 66
MAY 12 1 0 70
JUN 15 6 0 70
JUL 17 4 0 65
AUG 17 8 0 68
SEP 14 3 0 73
OCT 8 - 2 * 74
NOV 4 -10 3 77
DEC -1 -12 19 71
% of Hr.
Humidity is
Over 70% from Average Number Average Number Average Number
1200 to 1400 of Days With of Days With of Days With
Month Hrs. Precipitation Snow Thunderstorms
JAN 38 9 2 *
FEB 31 10 2 *
MAR 22 13 2 1
APR 17 16 * 5
MAY 16 18 0 11
JUN 15 18 0 13
JUL 6 15 0 12
AUG 10 15 0 10
SEP 21 12 0 6
OCT 19 10 0 3
NOV 39 13 * 2
DEC 27 10 2 *
* = Occurs less than 1 day or 1%.
Para (c) Insert: No Government transportation vehicles or facilities are available for contractor use.
Para (d) Insert: Items identified as Government Furnished Property will be turned over to the Contractor, whenever he requests such items, at a warehouse located within the limits of Ghedi Air Base.
52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
Change all references to 1 year to read 2 years.
252.229-7003 TAX EXEMPTIONS (ITALY) (JAN 2002)
Para (b) (1) (iii) Insert: “91000190933”
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
Para (e) Insert: “SEE SECTION J HEREIN”
OFFEROR FILL-INs
252.229-7001 TAX RELIEF (JUN 1997)
Para (a) Inserts: NAME OF TAX: _______________ RATE : _________
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS
The following documents are an integral part of this contract:
a. Attachment 1:
Technical Specifications for HWQJ 16-1022, Sustain Exterior Multi Facilities Ghedi AB, Italy Rev. 1, dated
September 2015
- 32 pages including cover page and attachments #s 1, 2 and 3
b. Attachment 2:
Additional Requirements, dated 27 August 2015
- 3 pages
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
L-01. OFFER PREPARATION INSTRUCTIONS
To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.
The following documents shall be submitted and shall constitute the offer:
1. PRICE OFFER
(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442.
In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through
K. These sections constitute the model contract.
(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown Rev. 1 form. The extended amount must equal the whole Euro unit price multiplied by the number of units.
(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J, Attachment 2, "Additional Requirements”.
(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate Breakdown Rev. 1 and the “Additional Requirements” shall be returned in their entirety.
2. TECHNICAL ACCEPTABILITY
Submit current SOA certification for category OS07 and classification adequate to cover offeror’s amount for project performance.
3. TECHNICAL DATA
Submit copy of the technical data indicated at paragraph 1 of the Technical Specifications, in sufficient detail to allow the Government evaluation team to ascertain without any reasonable doubt total compliance with the requirements set forth in the project Technical Specifications.
L-02. CURRENCY
All prices in response to this solicitation will be in Euro currency.
L-03. OFFER DOCUMENTATION
All offer documentation in response to this solicitation may be submitted in either the host nation language (Italian) or in the English language.
L-04. OFFER SUBMISSION INSTRUCTIONS
Offers in response to this solicitation shall be submitted to reach the issuing office indicated at page 1 of the solicitation, Standard Form 1442 block 7, by the date and time specified in block 13A of the Standard Form 1442.
Submission of offers by e-mail to all the points of contact indicated in the FedBizOpps will be accepted.
(End of Summary of Changes)