Attach___3 _HWQJ_16-1022 __Photos_of_5_Bldgs _REV._1.pptx
PPTX presentation 1 MB Posted
- Solicitation number
- FA5682-15-T-0007
About this file
Project HWQJ 16-1022 Technical Specifications - Attachment 3 Rev. 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_FA5682-15-T-0007_-_Amendment_0001.pdf | ||
| HWQJ_16-1022_Construction_Cost_Estimate_Breakdown_REV._1.xls | XLS spreadsheet | |
| Attach___2 _HWQJ_16-1022_-_Annex_1 _REV._1.doc | DOC document | |
| Solicitation_FA5682-15-T-0007_(Sustain_Exterior_Multi_Ghedi).pdf | ||
| HWQJ_16-1022_Technical_Specifications_Attachments.zip | ZIP file | |
| HWQJ_16-1022_Construction_Cost_Estimate_Breakdown.xls | XLS spreadsheet | |
| ADDITIONAL_REQUIREMENTS.doc | DOC document | |
| HWQJ_16-1022_Technical_Specifications.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HWQJ 16-1022, ATTACHEMENT # 03 REV. 1, slide 1
BLDG. # 5101, GHEDI AF BASE
Paint metal structure, sliding doors, gutters and downspouts
HWQJ 16-1022, ATTACHEMENT # 03 REV. 1, slide 2
BLDG. # 5293, GHEDI AF BASE
Gutters, downspouts & flashing are in stainless steel, do not paint Paint metal structure, grills and flashing Remove 100% of existing paint in this metal wall wing of the building because existing paint is not compatible with enamel paint
HWQJ 16-1022, ATTACHEMENT # 03 REV. 1, slide 3
BLDG. # 5293, GHEDI AF BASE
Paint adjacent bbq / recreation area Paint metal structure Gutters, downspouts & flashing are in stainless steel, do not paint
HWQJ 16-1022, ATTACHEMENT # 03 REV. 1, slide 4
BLDG. # 5294, GHEDI AF BASE
Regular acrylic-siloxan painting Install rasante all around the tallest part of bldg 5294 up to here, overhang is not included Regular acrylic-siloxan painting along overhang Install rasante all around the tallest part of bldg 5294, overhang is not included Regular acrylic-siloxan painting
HWQJ 16-1022, ATTACHEMENT # 03 REV. 1, slide 5
Remove broken and install new marble/stone top frames Remove old paint all around the marble frame and sill and clean surface Cover with L shape profile and seal eventual gaps after installation of new U shape guide Patch holes
HWQJ 16-1022, ATTACHEMENT # 03 REV. 1, slide 6 install missing new marble/stone frame Remove all mosquito nets and frame, patch holes on the frames Repair and patch sills with special (mastice) compoud for marble /stone reconstruction of broken parts, color similar to existing Do not remove and replace these two rolling shutters , they will be done under a different contract
HWQJ 16-1022, ATTACHEMENT # 03 REV. 1, slide 7
Remove old paint all around the marble frame and sill and clean surface Paint all metal grills Remove obsolete rolling shutters and install new aluminum rolling shutters Touch up white paint after installation of shutters
HWQJ 16-1022, ATTACHEMENT # 03 REV. 1, slide 8
BLDG. # 5311, GHEDI AF BASE
Paint metal structure, flashing, downspouts and four metal roof above doors
HWQJ 16-1022, ATTACHEMENT # 03 REV. 1, slide 9
BLDG. # 5311, GHEDI AF BASE
Paint columns, metal and wood surfaces Paint adjacent Pavilion to B. 5311
HWQJ 16-1022, ATTACHEMENT # 03 REV. 1, slide 10
BLDG. # 5315, GHEDI AF BASE
Paint metal structure, doors, gutters and downspouts Repair holes and corroded areas image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.jpeg image19.jpeg image20.jpeg image21.jpeg
File details come from the government source that posted it. Updated .