HWQJ_16-1022_Construction_Cost_Estimate_Breakdown_REV._1.xls

XLS spreadsheet 249 KB Posted

Attached to
Project HWQJ 16-1022 Sustain Exterior Multi Facilities, Ghedi Air Base, Italy
Solicitation number
FA5682-15-T-0007
Issued by

About this file

Project HWQJ 16-1022 Construction Cost Estimate Breakdown Rev. 1

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HWQJ 16-1022 REV. 1

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
SUSTAIN EXTERIOR MULTI FACILITIES, GHEDI, AIR BASE, ITALYREV.1
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
HWQJ 16-1022GHEDI AIR BASE
MATERIAL COSTSLABOR COSTS
LINE ITEM NO.ITEM (1)UNIT OF MEASURE (2)QUANTITY (3)UNIT (4)TOTAL (5)MANHOUR MANDAYS (6)AVERAGE RATE (7)TOTAL (8)OTHER DIRECT COSTS (9)LINE TOTAL (10)
SURFACE CLEANING
1HYDRO JETBLAST / CLEANING WALLS TO BE PAINTEDIT. No.4.aSq. Mt.
ALLOWANCE FOR HEIGHT
2SCAFFOLD / AERIAL PLATFORMIT. No.4.bL.S.
SURFACE PREP. PLASTER / REPAIR
3DEMOLITION, PAINT REMOVAL, REPAIR, PLASTER, RASATURAIT. No.4.cSq. Mt.
PAINT EXTERIOR METAL SURFACES
5SURFACE PREPARATION, PRIMER / TWO COATS ENAMEL PAINTIT. No.4.dSq. Mt.
PAINT EXTERIOR WALLS
6PRIMER, TWO COATS PAINTIT. No.4.eSq. Mt.
B. 5294 MARBLE / STONE WINDOW FRAMES
7CLEAN FRAME & PRIVIDE NEW MARBLE/STONE UNITSIT. No.4.fL. S.
PAINT ROOF WOOD BOARDS
8PAVILLION NEXT TO B. 5311IT. No.4.gL.S.
B. 5294 REMOVAL OF ROLLING SHUTTERS
9REMOVAL AND DISPOSALIT. No.4.hEA
B. 5294 INSTALLATION OF ROLLING SHUTTERS
10INSTALLATION OF ALUMINUM SHUTTERS 150 x 120 cmIT. No.4.i1EA
11INSTALLATION OF ALUMINUM SHUTTERS 70 x 150 cmIT. No.4.i2EA
12INSTALLATION OF ALUMINUM SHUTTERS 200 x 120 cmIT. No.4.i3EA
B. 5294 INSTALLATION OF RASANTE
132 COATS, PRIMER AND COLORED PLASTER (RIVESTIMENTO)IT. No.4.jSq. Mt.
TOTAL €