ASHE_13-1020_Const_Cost_Estimate.xls

XLS spreadsheet 1 MB Posted

Attached to
Upgrade Storm Water Run-Off System at North Maintenance Fac. 1010, Area F, Aviano Air Base (Project ASHE 13-1020)
Solicitation number
FA5682-15-R-0010
Issued by

About this file

Project ASHE 13-1020_Construction Cost Estimate

View the file

Other files

File Type Posted
ASHE_13-1020_Addendum__2.doc DOC document
Solicitation_FA5682-15-R-0010_Amendment_0001.doc DOC document
SF_1442_ADDITIONAL_REQUIREMENTS_June_2015.doc DOC document
Solicitation_FA5682-15-R-0010_(Repair_Storm_Water_Run-Off_Fac._1010).doc DOC document
ASHE_13-1020_Addendum__1.doc DOC document
ASHE_13-1020_100__dwgs.pdf PDF
Master_Technical_Specifications.zip ZIP file
ASHE_13-1020_100__Specs_Eng.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW CONST SD

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
UPGRADE STORM WATER RUN-OFF SYSTEM AT NORTH MAINTENANCE FAC. 1010, AREA F, AVIANO AB. ITALY NEW WORKS
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 13-1020AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
A.STORM WATER DRAINAGE/ Rete drenaggio
NEW WORKS / Nuove Opere
PART IA - EXCAVATIONS AND REMOVALS / Parte IA - Scavi e Rimozioni
0.000.00
1JOB SITE MOBILIZATION AND DEMOBILIZATION
Installazione e rimozione di cantiereIT. No. Art. n.1LS/AC
2CUTTING OF EXISTING BITUMINOUS CONCRETE PAVEMENT
Taglio di pavimentazione stradale in conglomerato bituminosoIT. No. Art. n.2LM/ML0.00
3DEMOLITION OF BITUMINOUS CONCRETE PAVEMENT
Demolizione di manto stradale in conglomerato bituminosoIT. No. Art. n.3Cu.M/MC0.00
4TRENCH EXCAVATION FOR NEW STORM DRAINAGE PIPELINE IN BITUMINOUS CONCRETE PAVEMENT
Scavo in trincea per nuova rete drenante su pavimentazione in conglomerato bituminosoIT. No. Art. n.4aCu.M/MC0.00
5TRENCH EXCAVATION FOR NEW STORM DRAINAGE PIPELINE ON EARTH
Scavo in trincea per nuova rete drenante su terrenoIT. No. Art. n.4bCu.M/MC0.00
6REMOVAL OF EXISTING STORM DRAIN LINE
Rimozione di linea di drenaggio esistenteIT. No. Art. n.5LM/ML0.00
7REMOVAL OF EXISTING STORM CATCH BASIN
Rimozione di caditoie esistentiIT. No. Art. n.6EA/N0.00
8LOADING AND TRANSPORTATION OF RESULTING MATERIALS, INCLUDED DUMP FEE
Trasporto a discarica di terreno di risulta, incl. oneri di discaricaIT. No. Art. n.7Cu.M/MC
9FURNISHING AND INSTALLATION OF STEEL FORMS “PILOSIO” TYPE
Fornitura e posa di cassoni mobili tipo "Pilosio" per sostegno delle pareti di scavoIT. No. Art. n.8LS/AC
TOTAL PART IA - Totale Parte IA0.000.000.000.00
PART IIA - CIVIL WORK / Parte IIA - Lavori Civili
1200 MM DIAM. HEAVY PVC FOR STORM WATER DRAINAGE
Tubo PVC PESANTE diam. 200 mm per linee di drenaggio acque piovaneIT. No. Art. n.1aLM/ML
2250 MM DIAM. HEAVY PVC FOR STORM WATER DRAINAGE
Tubo PVC PESANTE diam. 250 mm per linee di drenaggio acque piovaneIT. No. Art. n.1bLM/ML
3315 MM DIAM. HEAVY PVC FOR STORM WATER DRAINAGE
Tubo PVC PESANTE diam. 315 mm per linee di drenaggio acque piovaneIT. No. Art. n.1cLM/ML
4400 MM DIAM. HEAVY PVC FOR STORM WATER DRAINAGE
Tubo PVC PESANTE diam. 400 mm per linee di drenaggio acque piovaneIT. No. Art. n.1dLM/ML
5500 MM DIAM. HEAVY PVC FOR STORM WATER DRAINAGE
Tubo PVC PESANTE diam. 500 mm per linee di drenaggio acque piovaneIT. No. Art. n.1eLM/ML
6630 MM DIAM. HEAVY PVC FOR STORM WATER DRAINAGE
Tubo PVC PESANTE diam. 630 mm per linee di drenaggio acque piovaneIT. No. Art. n.1fLM/ML
7710 MM DIAM. HEAVY PVC FOR STORM WATER DRAINAGE
Tubo PVC PESANTE diam. 710 mm per linee di drenaggio acque piovaneIT. No. Art. n.1gLM/ML
8800 MM DIAM. HEAVY PVC FOR STORM WATER DRAINAGE
Tubo PVC PESANTE diam. 800 mm per linee di drenaggio acque piovaneIT. No. Art. n.1hLM/ML
9PIPE BEDDING WITH GRAVEL AND SAND MATERIAL
Allettamento tubi con sabbia e ghiaiaIT. No. Art. n.2Cu.M/MC
10TRENCH BACKFILLING AND COMPACTION WITH SELECTED RESULTING MATERIAL
Rinterro e costipazione delle trincee con materiali di risulta selezionatoIT. No. Art. n.3Cu.M/MC
113 MM DIAMETER COPPER TRACER WIRE
Cavo di rame di rilevamento diametro 3 mmIT. No. Art. n.4LM/ML
12WARNING TAPE
Nastro indicatoreIT. No. Art. n.5LM/ML
1380x80 CM CONCRETE PIT INCL. D400 CLASS CAST IRON COVER AND METAL LADDER Pozzetto di calcestruzzo 80x80 cm incluso coperchio in ghisa classe D400 e scala metallicaIT. No. Art. n.6aEA/NO
14120x120 CM CONCRETE PIT INCL. D400 CLASS CAST IRON COVER AND METAL LADDER Pozzetto di calcestruzzo 120x120 cm incluso coperchio in ghisa classe D400 e scala metallicaIT. No. Art. n.6bEA/NO
1580x80x20 cm PRECAST CONCRETE PIT EXTENSION Prolunghe per pozzetti prefabb, dimensione 80x80x20 cmIT. No. Art. n.6cEA/NO
16120x120x20 cm PRECAST CONCRETE PIT EXTENSION Prolunghe per pozzetti prefabb, dimensione 120x120x20 cmIT. No. Art. n.6dEA/NO
17Ø240x150cm GFRP STORM CHAMBER MANHOLE Pozzetto scolmatore in PRFV, Ø240x150cmIT. No. Art. n.6eEA/NO
18PVC GASKETS FOR CONNECTION OF STORM PIPES TO CATCH BASIN Giunti di raccordo in PVC fra caditoie e tubazioni drenaggioIT. No. Art. n.6fEA/NO
19PRECAST CONCRETE CULVERT
Cunetta prefabbricata in calcestruzzoIT. No. Art. n.7aLM/ML
20PRECAST CONCRETE CULVERT - 50X50 catch basin
Cunetta prefabbricata in calcestruzzo - caditoia 50X50IT. No. Art. n.7bEA/NO
21EXISTING PRECAST CONCRETE CATCH BASIN UPGRADING Modifiche alle caditoie esistentiIT. No. Art. n.8LS/AC
22CLEANING OF EXISTING CONTINUOUS GRATING, PHARMACY STORAGE AREA
Pulizia di griglia continua, area deposito farmaciaIT. No. Art. n.9LS/AC
23RESTORATION OF BITUMINOUS CONCRETE PAVEMENT SURFACES,
Ripristino superfici in conglomerato bituminoso,IT. No. Art. n.10SM/MQ
24PAINTING OF 12cm WIDE MARKING STRIPS
Pitturazione segnaletica orizzontale, Sp=12cmIT. No. Art. n.11LS/AC
25GENERATION OF AS-BUILT DRAWINGS
Realizzazione disegni "as-built"IT. No. Art. n.12LS/AC
TOTAL PART IIA / Totale Parte IIA
STORM WATER DRAINAGE WORKS SUMMARY Riepilogo Opere Rete Drenaggio
PART IA - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART IIA - CIVIL WORK
TOTAL PRICE / Costo Totale

&C&12 &RSheet &P of 12

NEW CONST OWS

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
UPGRADE STORM WATER RUN-OFF SYSTEM AT NORTH MAINTENANCE FAC. 1010, AREA F, AVIANO AB. ITALY NEW WORKS
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 13-1020AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
B.OWS SYSTEM / SEPARATORI ACQUA OLIO
NEW WORKS / Nuove Opere
PART IB - EXCAVATIONS AND REMOVALS / Parte IB - Scavi e Rimozioni
0.000.00
1JOB SITE MOBILIZATION AND DEMOBILIZATION
Installazione e rimozione di cantiereIT. No. Art. n.1LS/AC
2CUTTING OF EXISTING BITUMINOUS CONCRETE PAVEMENT
Taglio di pavimentazione stradale in conglomerato bituminosoIT. No. Art. n.2LM/ML
3DEMOLITION OF BITUMINOUS CONCRETE PAVEMENT
Demolizione di manto stradale in conglomerato bituminosoIT. No. Art. n.3Cu.M/MC
4SOIL EXCAVATION FOR NEW OIL SEPARATOR
Scavo di terreno per nuovo separatore oliiIT. No. Art. n.4Cu.M/MC
5LOADING AND TRANSPORTATION OF RESULTING MATERIALS, INCLUDED DUMP FEE
Trasporto a discarica di terreno di risulta, incl. oneri di discaricaIT. No. Art. n.5Cu.M/MC
TOTAL PART IB - Totale Parte IB
PART IIB - CIVIL WORK / Parte IIB - Lavori Civili
1FURNISHING AND INSTALLATION OF OIL WATER SEPARATION SYSTEM
Fornitura in opera di impianto separatore acqua oliIT. No. Art. n.1EA/NO
2BACKFILLING AND COMPACTION - GRAVEL MATERIAL
Rinterro e costipazione - Petrisco minutoIT. No. Art. n.2aCu.M/MC
3BACKFILLING AND COMPACTION - SELECTED RESULTING MATERIAL
Rinterro e costipazione - Materiali di risulta selezionatoIT. No. Art. n.2bCu.M/MC
4RESTORATION OF BITUMINOUS CONCRETE PAVEMENT SURFACES,
Ripristino superfici in conglomerato bituminoso,IT. No. Art. n.3SM/MQ
TOTAL PART IIB / Totale Parte IIB
OWS WORKS SUMMARY Riepilogo Opere Impanto separazione acqua-olii
PART IB - EXCAVATIONS AND REMOVALS
PART IIB - CIVIL WORK
TOTAL PRICE / Costo Totale

&C&12 &RSheet &P of 12

DEMOLITION DF

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
UPGRADE STORM WATER RUN-OFF SYSTEM AT NORTH MAINTENANCE FAC. 1010, AREA F, AVIANO AB. ITALY DEMOLITION WORKS
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 13-1020AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
C.DRAINAGE FIELD / Bacino di dispersione
DEMOLITION WORKS / Demolizioni
PART IC- DEMOLITIONS / Parte IC - Demolizioni
1CUTTING OF EXISTING BITUMINOUS CONCRETE PAVEMENT
Taglio di pavimentazione stradale in conglomerato bituminosoIT. No. Art. n.1LM/ML
2DEMOLITION OF BITUMINOUS CONCRETE PAVEMENT
Demolizione di manto stradale in conglomerato bituminosoIT. No. Art. n.2Cu.M/MC
3DEMOLITION AND REMOVAL OF EXISTING DRY WELLS
Demolizione e Rimozione di pozzi perdenti esistentiIT. No. Art. n.3EA/NO
4DEMOLITION AND REMOVAL OF EXISTING OWS SYSTEMS
Demolizione e rimozione impianti separatori acqua-olioIT. No. Art. n.4EA/NO
5LOADING AND TRANSPORTATION OF RESULTING MATERIALS, INCL. DUMP FEE
Trasporto a discarica di terreno di risulta, incl. oneri di discaricaIT. No. Art. n.5Cu.M/MC
TOTAL PART IC - Totale Parte IC
DEMOLITION WORKS SUMMARY Riepilogo Opere Demolizione
PART IC - DEMOLITIONS
TOTAL PRICE / Costo Totale
2
7
8
9
10
11
12
16
17
18
19
20
21
25

&C&12 &RSheet &P of 12

REPAIR DF

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
UPGRADE STORM WATER RUN-OFF SYSTEM AT NORTH MAINTENANCE FAC. 1010, AREA F, AVIANO AB. ITALY REPAIR WORKS
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 13-1020AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
D.DRAINAGE FIELD / Bacino di dispersione
REPAIR WORKS / Lavori di ristrutturazione
PART ID- EXCAVATIONS AND REMOVALS / Parte ID - Scavi e Rimozioni
1SOIL EXCAVATION FOR DRAINAGE FIELD
Scavo di terreno per nuovo bacino di dispersioneIT. No. Art. n.1Cu.m/Mc
2LOADING AND TRANSPORTATION OF RESULTING MATERIALS, INCL. DUMP FEE
Trasporto a discarica di terreno di risulta, incl. oneri di discaricaIT. No. Art. n.2Cu.m/Mc
TOTAL PART ID - Totale Parte ID
PART IID - CIVIL WORK / Parte IID - Lavori Civili
1DRAINAGE FIELD CONSTRUCTION
Costruzione bacino di dispersioneIT. No. Art. n.1LS/AC
2120x120 PRECAST CONCRETE ELEMENT FOR DISTRIBUITION MANHOLE
Elementi scatolari prefabbricati in calcestruzzo sezione rattangolare dim. 120 x 120 cm per cameretta di distribuzioneIT. No. Art. n.2EA/NO
3BACKFILLING AND COMPACTION WITH SELECTED RESULTING MATERIAL OF EXCAVATION FOR OWS AND DW REMOVAL
Rinterro e costipazione delle degli scavi per la rimozione dei disoleatori e dei pozzi perdenti con materiali di risulta selezionatoIT. No. Art. n.3Cu.M/MC
4BACKFILLING AND COMPACTION WITH SELECTED RESULTING MATERIAL OF DF EXCAVATION
Rinterro e costipazione delle degli scavi per la realizzazione del bacino di dispersione con materiali di risulta selezionatoIT. No. Art. n.4Cu.M/MC
5RESTORATION OF BITUMINOUS CONCRETE PAVEMENT SURFACES OVER REMOVED OWS AND DW
Ripristino superfici in conglomerato bituminoso sulle aree di rimozione dei separatori e dei pozzi perdentiIT. No. Art. n.5SM/MQ
6RESTORATION OF TURF AREAS
Ripristino aree a pratoIT. No. Art. n.6SQ/MQ
7REPAIR/REROUTE OF EXISTING UTILITIES
Ripristino/deviazione utenze esistentiIT. No. Art. n.7LS/AC
TOTAL PART IID - Totale Parte IID
REPAIR WORK SUMMARY Riepilogo Lavori di Ristrutturazione
PART ID - EXCAVATIONS AND REMOVALS
PART IID - CIVIL WORK
TOTAL PRICE / Costo Totale
16
17
18
19
20
21
25

&C&12 &RSheet &P of 12

Summary

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
UPGRADE STORM WATER RUN-OFF SYSTEM AT NORTH MAINTENANCE FAC. 1010, AREA F, AVIANO AB. ITALY
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 13-1020AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
A.STORM DRAINAGE NETWORK / Rete drenaggio
NEW WORKS / Nuova Costruzione
PART IA - EXCAVATIONS AND REMOVALS
PART IIA - CIVIL WORK
SUB TOTAL A.
B.OWS SYSTEM / Impianto Separazione Olii
NEW WORKS / Nuova Costruzione
PART IB - EXCAVATIONS AND REMOVALS
PART IIB - CIVIL WORK
SUB TOTAL B.0.00
C.DRAINAGE FIELD / Bacino infiltrazione
REPAIR WORKS / Lavori di ristrutturazione
PART IC - DEMOLITIONS
SUB TOTAL C.
D.DRAINAGE FIELD / Bacino infiltrazione
DEMOLITION WORKS / Lavori di demolizione
PART ID - EXCAVATIONS AND REMOVALS
PART IID - CIVIL WORK
SUB TOTAL D.
TOTAL PRICE / Costo Totale
10
11
12
16
17
18
19
20
21
25

&C&12 &RSheet &P of 12

Summary (2)

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
UPGRADE STORM WATER RUN-OFF SYSTEM AT NORTH MAINTENANCE FAC, 1010, AREA F, AVIANO AB. ITALY
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 13-1020AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1NEW WORKS / Nuova Costruzione
SUB TOTAL A - STORM DRAINAGE NETWORK
SUB TOTAL B - OWS
2DEMOLITION WORKS / Demolizioni
SUB TOTAL C - DRAINAGE FIELD
3REPAIR WORKS / Lavori di ristrutturazione
SUB TOTAL D - DRAINAGE FIELD
TOTAL PRICE / Costo Totale
2
7
8
9
10
11
12
16
17
18
19
20
21
25

&C&12 &RSheet &P of 12

Grand Total

ASHE 13-1020 - UPGRADE STORM WATER RUN-OFF SYSTEM AT NORTH MAINT. FACILITY 1010, AREA F, AVIANO AB. ITALY
INSTRUCTIONS FOR COMPLETING THE FORM
1. NEW WORKS A+B2.DEMOLIT. WORK C3.REPAIR WORKS DTOTAL 1+2+3 (€)
TOTAL MATERIAL COSTS€€€€
TOTAL LABOR COSTS€€€€
TOTAL OTHER DIRECT COSTS€€€€
TOTAL DIRECT COSTS€€€€
OVERHEAD%€€€€
SUBTOTAL€€€€
PROFIT%€€€€
TOTAL PRICE€€€€
DATEFIRM NAME
TITLEBY
INSTRUCTIONS TO OFFERORS
18
19
20
21
25

&C&12 &RSheet &P of 12

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .