ASHE_13-1020_Addendum__1.doc
DOC document 31 KB Posted
- Solicitation number
- FA5682-15-R-0010
About this file
Project ASHE 13-1020_Addendum 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE_13-1020_Addendum__2.doc | DOC document | |
| Solicitation_FA5682-15-R-0010_Amendment_0001.doc | DOC document | |
| SF_1442_ADDITIONAL_REQUIREMENTS_June_2015.doc | DOC document | |
| Solicitation_FA5682-15-R-0010_(Repair_Storm_Water_Run-Off_Fac._1010).doc | DOC document | |
| ASHE_13-1020_100__dwgs.pdf | ||
| Master_Technical_Specifications.zip | ZIP file | |
| ASHE_13-1020_100__Specs_Eng.PDF | ||
| ASHE_13-1020_Const_Cost_Estimate.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT ASHE 13-1020
UPGRADE STORM WATER RUN-OFF SYSTEM
AT NORTH MAINTENANCE FAC. 1010, AREA F
AVIANO AIR BASE
AVIANO, ITALY
ADDENDUM # 1
SECTION AC1 – SCOPE OF PROJECT AND APPLICABLE CONDITIONS
· Delete any reference to Area D
· Change reference to “installation of two new Oil Water Separators” to read “installation of one new Oil Water Separator”
· AC1-23 ADDITIONAL SPECIFICATIONS, change content of this item to read “Not Applicable”
SCHEDULE OF WORK ITEMS
B – OWS SYSTEM – NEW WORKS
PART IIB – Civil Works
· Change reference to “UNI EN 85” to read “UNI EN 858”
· Add “Type MANZI, Model GN/GNS, or equal approved” Project # ASHE 13-1020
Addendum #1 DATE: May 2015
File details come from the government source that posted it. Updated .