About this file

Project ASHE 13-1020_Addendum 1

View the file

Other files

File Type Posted
ASHE_13-1020_Addendum__2.doc DOC document
Solicitation_FA5682-15-R-0010_Amendment_0001.doc DOC document
SF_1442_ADDITIONAL_REQUIREMENTS_June_2015.doc DOC document
Solicitation_FA5682-15-R-0010_(Repair_Storm_Water_Run-Off_Fac._1010).doc DOC document
ASHE_13-1020_100__dwgs.pdf PDF
Master_Technical_Specifications.zip ZIP file
ASHE_13-1020_100__Specs_Eng.PDF PDF
ASHE_13-1020_Const_Cost_Estimate.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT ASHE 13-1020

UPGRADE STORM WATER RUN-OFF SYSTEM

AT NORTH MAINTENANCE FAC. 1010, AREA F

AVIANO AIR BASE

AVIANO, ITALY

ADDENDUM # 1

SECTION AC1 – SCOPE OF PROJECT AND APPLICABLE CONDITIONS

· Delete any reference to Area D

· Change reference to “installation of two new Oil Water Separators” to read “installation of one new Oil Water Separator”

· AC1-23 ADDITIONAL SPECIFICATIONS, change content of this item to read “Not Applicable”

SCHEDULE OF WORK ITEMS

B – OWS SYSTEM – NEW WORKS

PART IIB – Civil Works

· Change reference to “UNI EN 85” to read “UNI EN 858”

· Add “Type MANZI, Model GN/GNS, or equal approved” Project # ASHE 13-1020

Addendum #1 DATE: May 2015

File details come from the government source that posted it. Updated .