Project ASHE 13-1020_Technical Specifications

View the file

Other files

File Type Posted
ASHE_13-1020_Addendum__2.doc DOC document
Solicitation_FA5682-15-R-0010_Amendment_0001.doc DOC document
SF_1442_ADDITIONAL_REQUIREMENTS_June_2015.doc DOC document
Solicitation_FA5682-15-R-0010_(Repair_Storm_Water_Run-Off_Fac._1010).doc DOC document
ASHE_13-1020_Addendum__1.doc DOC document
ASHE_13-1020_100__dwgs.pdf PDF
Master_Technical_Specifications.zip ZIP file
ASHE_13-1020_Const_Cost_Estimate.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. AIR FORCE

ST

FIGHTER WING

AVIANO AIR BASE, ITALY

Prepared and Submitted by:

Via di Sacco Pastore n. 4 - Rome, Italy Tel. +39.06.97848041 fax +39.06.97848175

E-mail: design@soinci.it

SO.IN.CI. S.r.l.

Architecture, Engineering & Consulting Services

PROJECT ASHE 13-1020

UPGRADE STORM WATER RUN-OFF SYSTEM

AT NORTH MAINTENANCE FAC.1010, AREA F

AVIANO AIR BASE

AVIANO, ITALY

TECHNICAL SPECIFICATIONS

FINAL SUBMITTAL (100%)

Date: FEBRUARY 2015

A/E CONTRACT No.: FA5682-13-D-0004 D.O.: 0006

U.S. AIR FORCE

ST

FIGHTER WING

AVIANO AIR BASE, ITALY

Prepared and Submitted by:

Via di Sacco Pastore n. 4 - Rome, Italy Tel. +39.06.97848041 fax +39.06.97848175

E-mail: design@soinci.it

SO.IN.CI. S.r.l.

Architecture, Engineering & Consulting Services

PROJECT ASHE 13-1020

UPGRADE STORM WATER RUN-OFF SYSTEM

AT NORTH MAINTENANCE FAC.1010, AREA F

TECHNICAL SPECIFICATIONS

HAVING REVIEWED THE DEFINITIVE AND DETAILED PROJECT, I DECLARE THAT I HAVE ASCERTAINED THAT

THE STRUCTURES AND THE TECHNOLOGICAL SYSTEMS INCLUDED THEREIN COMPLY WITH THE APPLICABLE

ITALIAN NORMS.

Date, February 2015

Civil:

Arch. M. Cantagallo

Ordine degli Architetti della Provincia di Frosinone

No.338

ASHE 13-1020

INDEX

SECTION PAGE No.

AC1 - SCOPE OF PROJECT AND APPLICABLE CONDITIONS 1-8

AF FORM 66 - SCHEDULE OF MATERIAL SUBMITTALS 9-10

REVISED MASTER SPECIFICATIONS 11-18

SCHEDULE OF WORK ITEMS 19-33

ASHE 13-1020 AC1 1

SECTION AC1

SCOPE OF PROJECT AND APPLICABLE CONDITIONS

AC1-01 SCOPE OF PROJECT: The scope of this project is to mitigate potential sources of contamination and thereby reduce the risk of potential infiltration of impacted storm water runoff and wastewater to the underground or groundwater.

Located on the east side of the North Maintenance Area, in the north-eastern part of Area F at Aviano Air Base, project area covers a total surface of about 32,400 sq.m, mostly paved (area showed on Drawing C-1).

The land surface is nearly flat, with an elevation of approximately 164 m above sea level. Activities in the North Maintenance Area include vehicle parking, washing, and maintenance operations. A hazardous waste accumulation point is also present. The following main facilities are included in Area D: Facility 1010 - Base’s main vehicle maintenance shop;

Facility 1046 - Power Production/Barrier Maintenance; Facility 1036 -

Heavy Equipment Horizontal and wide thruway/parking area southwest of

Facility; Facility 1032 - HAZMART and Facility 1035 - Hazardous Material

Storage BSE.

The precipitation runoff on this area either flows to the edge of the pavement or is channeled by storm drains to one of the several dry wells

(DWs) in the area. The following SW drainage systems are currently in place:

- SW runoff from the paved areas surrounding Facility 1010 is collected through four drainage systems and discharged into DWs

(ODw1-Dw2-Dw3-Dw4) after pre-treatment through existing Oil Water

Separators (Ows1-Ows2 Ows3 and Ows4. Roof drain are collected and discharged in existing drainage fields Df1 and Df2.

- SW drainage system on the west side of Building 1036 collects SW runoff from the surrounding paved areas and discharges into four large DWs (Dw5-Dw6-Dw7-Dw8) in the main parking area without any pre-treatment. Roof drain are collected and discharged ito existing drainage field Df3.

- SW runoff from the paved areas surrounding Facility 1046 is collected through two drainage systems discharging into a Dw, after pre-treatment through an existing Ows and into a septic tank.

- SW runoff from the paved areas between Buildings 1032 and 1035 is collected by three different SW drainage systems and discharged into four DWs (Dw11-Dw12-Dw13-Dw14)

Project activities shall generally consist in the installation of a new unique storm drainage network, installation of two new Oil Water

Separators, the connection of the new drainage system to the new OWS and the installation of a Drainage Fields (DF)located in the grassy area near

Facility 1023. The existing Dry Wells and OWS systems shall be removed.

Work to be performed includes but is not limited to the following items:

a. Demolition and removal

- Cut of bituminous concrete pavements and soil excavation up to existing oil water separator system foundation level;

- Demolition and removal of existing oil water separator system;

- Removal of existing storm drainage inspection pits;

- Trench excavation for the installation of new drainage system pipelines and pits

- Cut, removal and capping of underground drainage and waste piping not more utilized;

ASHE 13-1020 AC1 2

- Earth excavation for new OWSs and DF installation

- All demolished items shall be removed and disposed to authorized public dump site.

- All other items of work as indicated on drawings and Schedule of Work Items.

b. Civil Work

- Furniture and installation of prefabricated oil water separator systems with double containment wall and leakage detection system, including storm chamber manhole and inspection pits;

- Furniture and installation of heavy PVC drainage pipes and connections to existing drainage lines;

- Backfilling and compaction of excavated trenches

- Furnishing and installation of prefabricated reinforced concrete pit, with D400 class cast-iron cover or grate.

- Subsurface infiltration system (Drainage fields).

- Restoration of bituminous concrete pavements affected by the demolition and excavation works;

- Repair/Reroute of existing utility lines as necessary;

- Restoration of turf and paved areas damaged during the works.

AC1-02 TECHNICAL SPECIFICATION: The following Sections of the Master

Specifications for construction projects of the Air Base in Aviano (PN), Italy, dated November 2005 and applicable modifications, shall be applicable to the present project, together with the List of Work Items to be performed:

02231 CLEARING AND GRUBBING

02722 GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT

02821 CHAIN LINK FENCES AND GATES

02921 TURF

See Paragraphs AC1-23 and AC1-24 for the other applicable specifications.

AC1-03 SUBMITTAL OF MATERIALS: In accordance with Paragraph 2.5 of the technical specification No. 01100/R, entitled “GENERAL CONDITIONS” of the

Master Specifications, the materials listed in AF Form 66 shall be submitted as required by the time schedule indicated, for the approval by the Contracting Officer’s Technical Representative.

The Contractor shall provide, for all the materials that will be furnished and installed, a written certification, completed with catalog data from which shall be clear the total absence of toxic-noxious materials.

The number of copies will be as required on AF Form 66.

AC1-04 CONSTRUCTION AREA SCREENING: All construction sites and material storage areas shall be securely fenced around the entire perimeter within an area defined by the Contracting Officer’s Technical Representative.

Bilingual signs, "VIETATO L'INGRESSO - LAVORI IN CORSO / WORK AREA - NO

ENTRY" shall be placed at the work area entry and along each side of the fencing. Fence type, height, and screening color should also be specified by the Base Civil Engineering (BCE). Fencing shall be completely secured at top and bottom to prevent access. Fences shall be screened with opaque screening material to prevent visibility inside the fenced area. Fences and screens shall be adequately staked and/or anchored to prevent blowing over during high wind conditions. Contractor shall not start installation of area screening until approved, in writing, by BCE. Contractor shall submit photos or samples of the screening material for approval by BCE.

ASHE 13-1020 AC1 3

The Contractor shall replace or repair in a timely manner, as determined by

BCE, all fences and screening sections that have damage or develop unsightly rips or holes. At the end of the work or when exterior work requires it, temporary fencing shall be removed.

Night warning lights shall be installed to illuminate the work area, from sunset to dawn.

AC1-05 PROJECT SIGN: The Contractor shall furnish a project sign on site in accordance with Section 01101/R. The sign shall be made of a durable material and maintained in good condition. Lettering is to be white gloss, exterior-type enamel. The sign and posts shall be given one prime coat and two finish coats of dark brown gloss exterior enamel paint.

The sign shall be erected at the designated location and shall be maintained in good condition by the Contractor until completion of the contract. The sign shall remain the property of the Contractor and shall be removed from the site upon final inspection and acceptance of the facility. Contractor identification and logo shall be allowed only on this sign and nowhere else on the exterior of the job site, with the exception of company vehicles. There should be no signs for the purpose of advertising anywhere on the site. Contractors shall submit sign proposal to BCE for approval.

AC1-06 JOB SITE MOBILIZATION: The Contractor shall submit a proposal to

BCE diagramming their construction site and all material storage areas in locations separate from a construction site. The Contractor shall submit this plan 14 calendar days prior to the start of construction. Material mobilization and construction execution can not begin until the plan has been approved by the base. Jobsite utility connections are the responsibility of the Contractor and shall be coordinated through BCE.

Temporary overhead utility runs are prohibited. Contractor shall include a plan for supplying required utilities to their site in their proposal.

AC1-07 SAFETY: Contractor shall provide barricades, traffic control signs and construction safety signs that meet installation standards and comply with all applicable laws. Actual location, size and final arrangement of these items shall be discussed and approved by the BCE prior to installation. Such approved items shall be of uniform size, design and color. All cones, barricades, warning lights, temporary signs and protective devices shall conform to the current host nation requirements and the U.S. Army Corps of Engineers Safety and Health Requirements Manual

EM 385-1-1.

AC1-08 HAZMAT/HAZWASTE HOUSEKEEPING: Prior to bringing any hazardous material onto the base, the Contractor must contact BCE to coordinate the storage and handling of all hazardous materials. Contractor is responsible for complying with all applicable environmental regulations and laws pertaining to the storage, handling, and transportation of hazardous materials and hazardous waste.

a. Hazardous materials: The Contractor shall identify all hazardous materials required for completion of the project.

b. Material Safety Data Sheets: The Contractor shall furnish English language versions of the Material Safety Data Sheets (MSDS) of hazardous materials, chemical, toxic, and noxious, that will be used in the construction work, to 31st CES/CEV for approval and coordination through SEG and SGPB. The Contracting Officer will provide sample of the MSDS form to the Contractor.

ASHE 13-1020 AC1 4

c. Hazardous Waste Management Plan: The Contractor shall provide an hazardous waste management plan.

d. Chemicals Materials: The Contractor shall ensure that hazardous materials utilized during construction do not contain any chemicals listed as EPA 17 toxins. A list of the EPA 17 toxins con be obtained from the 31st CES/CEV office.

e. Liquid, flammable or toxic substances: Any liquid, flammable, or any other toxic substances that are required for the execution of the works, shall be kept in properly labeled, special containers.

Relative data (quantity, characteristics and location) shall be transmitted to 31st CES/CEF or 31st CES/CEV through the Director of

Works.

f. Asbestos Containing Materials: Asbestos containing materials will be encountered during demolition work. It shall be the responsibility of the Contractor to handle and dispose asbestos containing materials in the appropriate manner, as prescribed by

Italian Law, governing the handling of such materials, and to provide all required documentation and related coordination to obtain the necessary authorizations. Removal, handling and disposal of asbestos containing materials shall be in compliance with Section 13281 of this contract document.

AC1-09 PRESERVATION OF EXISTING CONDITIONS: The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized by BCE to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound. The

Contractor shall return all areas disturbed during construction to their original condition before final acceptance by the base.

AC1-10 WORK SITE CONDITIONS: The work areas shall be made available to the Contractor as follows:

a. Work areas: The areas where the systems will be located are completely paved surface of approximately 59,000 sqmt including facility 12041 (Shed), 1204 (Heavy Drop Rigging Facility), 12052

(Overhang), 12042 (Vehicle Washrack Area)and 12043 (Technical room), Drainage Fields and OWS will be located in grass areas as shown on drawings.

b. System Locations: The systems will be located in areas that requires special access procedures, therefore the Contractor shall strictly comply with the Contracting Officer’s instructions.

Delays may happen when the Contractor will enter the restricted areas due to military operations or exercises. In this case the unproductive time will not be at the expense of the USA

Government.

c. Administrative Containers: Containers required on site for administrative reasons (office space, conference space, break room) must be in like new condition and painted a color which

ASHE 13-1020 AC1 5

coordinates with the base architectural plan and is approved by

BCE, unless it is hidden by the opaque fencing material.

Administrative containers in need of painting and / or repairs or that are in an unsightly condition will not be allowed at the project site. A nameplate, no greater than 0.5 meters X 0.5 meters in size, shall be displayed on the exterior of all trailers which lists the name of the Contractor’s company, 24-hour

Contractor’s point(s) of contact (POC) and telephone number where they can be reached.

d. Material Storage: Storage containers will be in like new condition, and painted a color which coordinates with the base architectural plan and is approved by BCE, if it is not hidden by the opaque fencing material. Contractor shall display a nameplate on the exterior of all storage units with the name of the

Contractor’s company, the Contractor’s point(s) of contact (POC) and telephone number where they can be reached. Storage of materials at the work site is at the Contractor’s risk. The use of private security guards on a job site shall be coordinated with base Security Forces and approved by the installation commander.

The Contractor shall not use any area(s) for material or equipment storage that has not been approved by BCE.

e. Loading and Unloading of Construction Materials and Equipment:

Unloading of materials will be allowed within the fenced work area.

Contractor's personnel, vehicles and equipment must not obstruct access roads to other buildings.

Temporary parking of vehicles, for loading or unloading materials and equipment is permitted in the proximity of the work area;

unless such operations will obstruct traffic flow.

f. Housekeeping and Site Cleanup: At the end of each working day, the Contractor shall be responsible for cleaning the area surrounding the building involved in the work.

Since the adjacent buildings are used every day, the Contractor shall provide that the surrounding areas are kept constantly clean and accessible, completely safe, and that the facilities are not in any way aesthetically damaged, even temporarily.

Such functions include disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times. Grass within the construction sites and material storage areas shall never exceed 10 cm in height. All rubbish and waste materials shall be placed in Contractor furnished containers. Contractors shall ensure all light weight debris at the construction site is properly secured in waste receptacles so that it does not blow to another area or onto the airfield. During the laying of asphalt roads, streets and/or parking surfaces, areas soiled by residual asphalt shall be cleaned the same day.

AC1-11 AIRFIELD SAFETY TRAINING: The Contractor shall contact Airfield

Management to receive flight line driver and airfield safety training prior to start of any work beginning on the flight line.

AC1-12 PARKING: Contractor or Contractor’s employees, including subcontractors, shall obey all traffic laws on installation.

The Contractor shall park all vehicles, including heavy equipment vehicles, only in unobtrusive locations within the fence line of the construction

ASHE 13-1020 AC1 6

site or lay down areas. Every effort must be made to avoid parking vehicles or heavy equipment where it can be easily observed by the public.

The Contractor shall not park outside the construction zone unless approved through BCE.

The Contractor shall clearly identify their vehicles through the use of company logos or signs on their vehicles.

AC1-13 ACCESS ROUTES: The Contractor shall provide a haul route plan for approval by BCE.

For road detour/closures the Contractor shall submit a written request to the Contracting Officer or his authorized representative for approval four weeks prior to his scheduled starting of work.

AC1-14 TRUCKING AND ROADS: Trucks loaded with loose material that can create a dust, debris or falling hazard shall be secured and covered.

Fasten suitable cover, such as tarpaulin, over the load before entering surrounding streets. The Contractor is solely responsible for spillage from their vehicles and such spillage shall be cleaned up immediately. All roads shall be maintained free of debris at all times. The Contractor is responsible for ensuring all haul routes and site access areas are maintained in a clean and orderly fashion, free from mud, debris and clutter at all times. Special consideration must be given to haul routes that cross active taxiways. No amount of debris at these locations shall be tolerated. The Contractor shall sweep these areas continuously as long as material deliveries are being made.

AC1-15 NOISE CONTROL: The Contractor shall comply with all applicable country, local, and installation laws, ordinances, and regulations relative to noise control, to include applicable base quiet hours.

AC1-16 EXCAVATIONS: Every trench/excavation shall be returned to its original condition within ten days of the original excavation; this may be extended to 30 days if approved by the BCE. Contractor shall phase trenching and excavation operations in order to comply. At minimum, Contractor shall restore the site to pre-excavation conditions. All soil stockpiles shall be hidden from view to the maximum extent possible. Prior approval by BCE is required if soil stockpiles are to remain exposed for long periods of time. Dust control measures are the responsibility of the

Contractor and shall be implemented as directed by BCE. All road cuts must be approved by BCE prior to execution.

AC1-17 LAWN MAINTENANCE: Grassy areas disturbed by any type of construction work including storage, equipment staging, and material delivery areas shall be sodded, or hydro-seeded, where required by BCE.

Sodding, or seeding, damaged areas should be accomplished at the earliest planting season possible. Contractor shall be responsible for the successful growth and maintenance of all sodded, or seeded, areas under this contract for a period of thirty (30) days or three mowing after final acceptance of the work. All grass, shrubbery, and ornamental plants fenced by the construction site shall be maintained to base standards by the

Contractor.

AC1-18 LAWN ESTABLISHMENT: Within seven (7) workdays of actual completion of work at contract site, the Contractor shall prepare all disturbed areas inside and outside of the fenced site for sodding, or hydro-seeding, as provided in contract specifications. Contractor shall restore the site to a condition and appearance equal to or better than existing before the work occurred. Such restoration work will not be considered complete, and the facility not accepted, until approved by BCE.

ASHE 13-1020 AC1 7

Additionally, no seeding shall be authorized for lawn establishment, whether new, or for restoration purposes unless specifically authorized by

BCE .

AC1-19 CONSTRUCTION SITE RESTORATION: All Contractor owned items such as, but not limited to, stakes, traffic/safety cones, barriers, warning tape, erosion control fences, that are erected during construction, shall be removed entirely after completion of project and within five (5) days of

Government acceptance of the project site. The Contractor, at his own expense, shall return to the site to remove any items left at or near the project site after this time period. All trailers, equipment/storage units, residual construction materials shall be removed also within five

(5) days of Government acceptance of the project site.

AC1-20 PROCEDURES AND WORK PHASES: Prior to starting any work the

Contractor shall submit a Work Plan for approval by the Contracting

Officer.

AC1-21 SALVAGEABLE MATERIALS: Transportation of discarded materials shall be extended, to an authorized dump site, even if the dump site is located outside the authority limits of the Aviano City Council Territory.

The transportation and delivery in an authorized dump of excavated materials and pollution materials shall be done by suitable trucks and whatever by a qualified firm to such type of transportation and delivery, according to the laws on force, national and local (Regional an Municipal).

AC1-22 CONSTRUCTION DRAWINGS: The following Construction Drawings complement this Technical Specification and are an integral part of the project documents:

DRAWING # SHEET # DESCRIPTION

GENERAL

1 of 24 T-1 PROJECT TITLE SHEET AND MAPS

2 of 24 T-2 LIST OF DRAWINGS & LEGENDS

CIVIL

3 of 24 C-1 GENERAL SITE PLAN

4 of 24 C-2 EXISTING CONDITION

STORM DRAINAGE NETWORK GENERAL PLAN

5 of 24 C-3 EXISTING CONDITION - ENLARGED PLAN, PART A

6 of 24 C-4 EXISTING CONDITION - ENLARGED PLAN, PART B

7 of 24 C-5 EXISTING CONDITION - ENLARGED PLAN, PART C

8 of 24 C-6 EXISTING CONDITION - ENLARGED PLAN, PART D

9 of 24 C-7 EXISTING CONDITION - ENLARGED PLAN, PART E

10 of 24 C-8 NEW CONDITION

STORM DRAINAGE NETWORK GENERAL PLAN

11 of 24 C-9 NEW CONDITION - ENLARGED PLAN, PART A

12 of 24 C-10 NEW CONDITION - ENLARGED PLAN, PART B

13 of 24 C-11 NEW CONDITION - ENLARGED PLAN, PART C

14 of 24 C-12 NEW CONDITION - ENLARGED PLAN, PART D

15 of 24 C-13 NEW CONDITION - ENLARGED PLAN, PART E

16 of 24 C-14 NEW CONDITION – STORM DRAINAGE PROFILES

17 of 24 C-15 NEW CONDITION - STORM DRAINAGE PROFILES

18 of 24 C-16 NEW CONDITION - STORM DRAINAGE PROFILES

19 of 24 C-17 NEW CONDITION - STORM DRAINAGE PROFILES

20 of 24 C-18 NEW CONDITION - STORM DRAINAGE PROFILES

21 of 24 C-19 NEW CONDITION – DRAINAGE FIELD DETAILS

22 of 24 C-20 NEW CONDITION – OWS SEPARATOR SYSTEM DETAILS

ASHE 13-1020 AC1 8

23 of 24 C-21 NEW CONDITION – DISTRIBUITION MANHOLE DETAILS

24 of 24 C-22 NEW CONDITION – DETAILS

AC1-23 ADDITIONAL SPECIFICATIONS: Technical specifications from selected manufacturers shown in Annex G of “Survey & Design Report”:

- Drainage field specification

- Oil water separator specification

AC1-24 REVISED MASTER SPECIFICATIONS: In addition to the Norms and

Specifications contained in the Master Specifications as noted in Section

AC1-02 of these Technical Specifications, the following Revised Master

Specifications shall apply to this project

01100/R GENERAL CONDITIONS

01101/R PROJECT SHEET

02315/R EXCAVATION AND FILL

02630/R STORM DRAINAGE

02741/R BITUMINOUS CONCRETE PAVEMENT

02761/R PAVEMENT MARKING

AC1-25 ADDITIONAL NORMS AND STANDARDS: Furthermore the works included in this project shall be in accordance, when applicable, with the NFPA, ASTM, UL, HANDBOOKS, Norms and Standards, whose manuals and regulations are available for review at the Contracting Officer.

AC1-26 FINAL ACCEPTANCE TEST & CERTIFICATIONS:

a. Once issued NTP, Contractor is required to contact CEAOR (Ms.

Cristina Rossetto 0434-305691) and schedule a meeting to fill Form

DD1354 with appropriate project data for real property capitalization (DD1354 and category codes list CATCODE_LIST_2010 are available in engineering office during normal hour of operations). Contractor is required to provide final Form DD1354 for 31CES/CD signature before contract close out;

b. All installed new mechanical and electrical equipment shall have the required Italian Mark of Quality and shall conform to D.P.R.

No. 459, dated 24 July 1996, with "C.E." Mark; and three copies of relevant certificates shall be furnished to the Contracting

Officer for each item of equipment installed. Furthermore the electric equipment shall be in compliance with the Legislative

Decree No. 81/08 and subsequent modifications which apply the

Directive 93/68/CEE. Electrical tests shall comply with Low 37/08 and CEI 64/8 Norm.

c. At the end of the work, the Contractor shall provide the

Government with three copies of the following documents:

1. Certificate of Test of the drainage structure, signed by an

Engineer or authorized Technician belonging to the Board of

Testing Experts.

AF Form 66, OCT 89

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

ASHE 13-1020

PROJECT TITLE

UPGRADE STORM WATER RUN-OFF FAC. 1010

SOLICITATION CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

D A

T E

R E

C E

IV

E

IN

C

O N

T R

A C

T

G

T E

T O

C

IV

IL

N

G

IN

E E

R

T U

R N

S U

S P

E N

S

U

B M

IT

T

A L

N U

M B

E

N T

R A

C T

O R

R E

S U

B M

IT

T

L

F

A L

A P

P R

O V

LI

E N

U M

B

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C E

R T

IF

IC

A T

IO

N

M P

LI

A

N

H

O P

D R

A W

M P

LE

LO

R

S E

LE

C

T

IO

M

N U

F A

C T

U R

E

’S

C O

M M

E N

D A

T

IO

N U

F A

C T

U R

E

W

R R

A N

Y

T A

LO

G

D A

P

E R

A T

IN

G

IN

S

T R

U C

T

IO

R U

C T

U R

A L

C A

LC

U

LA

T

DATE CONTRACTOR

NOTIFIED REMARKS

APPROVED DIS-

APPROVED

A - STORM DRAINAGE NETWORK

NEW WORKS

PART IIA - CIVIL WORK

1 Material safety data sheet

2 Heavy PVC pipes

Part IIA Item. 1a 1b 1c 1d 1e 1f 1g 1h

1 2 2 4 30

3 Storm Drainage Pit

Part IIA Item. 6a 6b 6c 6d

1 4 30

4 Storm Chamber Manhole

Part IIA Item. 6e

1 2 2 4 4 30

B – OIL WATER SEPARATOR

NEW WORKS

PART IIB - CIVIL WORK

5 Oil WaterSystem

Part IIB Item. 1

1 2 2 4 4 30

AF Form 66, OCT 89

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

ASHE 13-1020

PROJECT TITLE

UPGRADE STORM WATER RUN-OFF FAC. 1010

SOLICITATION CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

T E

R E

C E

IV

E

N

T R

A C

T

T E

T O

C

IV

IL

G

IN

E E

R

T U

R N

S U

S P

E N

U

B M

IT

T

A L

N U

M B

E

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

A P

P R

O V

LI

E N

U M

B

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C E

R T

IF

IC

A T

IO

N

M P

LI

A

N

H

O P

D R

A W

M P

LE

LO

R

S E

LE

C

T

N U

F A

C T

U R

E

C O

M M

E N

D A

T

IO

N U

F A

C T

U R

E

W

R R

A N

Y

T A

LO

G

D A

P

E R

A T

IN

G

IN

S

T R

U C

T

IO

R U

C T

U R

A L

C A

LC

U

LA

T

DATE CONTRACTOR

NOTIFIED REMARKS

APPROVED DIS-

APPROVED

D - DRAINAGE FIELD

REPAIR WORKS

PART IID - CIVIL WORK

1 Material safety data sheet

2 Drainage Field

Part IID Item. 1

1 2 2 4 4 30

3 Distribution Manhole

Part IID Item. 2

1 2 2 4 4 30

4 Reroute existing utilities Part IID Item. 7

1 2

ASHE 13-1020 11

REVISED MASTER SPECIFICATIONS

SECTION 01100/R GENERAL CONDITIONS

SECTION 01101/R PROJECT SIGN

SECTION 02315/R EXCAVATION AND FILL

SECTION 02630/R STORM DRAINAGE

SECTION 02741/R BITUMINOUS CONCRETE PAVEMENT

SECTION 02761/R PAVEMENT MARKING

Section 01100/R 12

SECTION 01100/R

GENERAL CONDITIONS

Revise Paragraph "3.2 UTILITY CUT-OFF" as follows:

Delete "ten (10) days" and insert "three (3) weeks" .

-- End of Section --

Section 01101/R 13

SECTION 01101/R

PROJECT SIGN

PART 1 - PROJECT SIGN

1.1 Scope

Furnish labor and material required for the construction and painting of a sign as shown on the attached sketch.

PART 2 - GENERAL

The Contractor shall identify the project by means of an appropriate sign mounted in a conspicuous area of the work site, as indicated by the

Contracting Officer or his designated representative. The sign shall be erected within 10 days of initiation of work at the job site.

The sign shall contain the following information in English:

a. Project No.

b. Project description

c. Constructed under Supervision of Base Civil Engineering

d. Contracted by 31st Contracting Squadron

e. Contractor

f. Design Engineer

g. Inspector

h. Contract Management: 31 CONS Construction Flight

i. ERP Coordinates

Lettering of the sign will be as shown on the following sketch, and may be painted or stenciled directly on sign. The sign will remain the property of the Contractor, and shall be promptly removed upon completion of the project.

Section 01101/R 14

Section 02315/R 15

SECTION 02315/R

EXCAVATION AND FILL

Paragraph 1.1:

Add:

Legislative Decreec No. 528 (1999) Amendments to the legislative decree of 14 August 1996 no. 494, implementing Directive 92/57/EEC concerning minimum safety and health requirements at temporary or mobile work sites.

Section 02630/R 16

SECTION 02630/R

STORM DRAINAGE

Delete:

UNI 7448 (1975) Rigid (unplasticized) PVC pipes.

Test methods.

UNI 7449 (1975) Rigid (unplasticized) PVC fittings and flanges. Test methods.

UNI 7613 (1976) High Density Polyethylene Pipes for

Buried Sewer Drain. Types, Dimensions, and

Requirements.

UNI EN 12201-2 (2013) Plastics piping systems for water supply, and for drainage and sewerage under pressure - Polyethylene (PE) - Part

2: Pipes

UNI EN 12666-1 (2011) Plastic Pipe Systems for Non-pressure Underground Drainage and Sewerage

– Polyethilene (PE) – Part 1:

Specifications for Pipes, Fittings and the

System.

Add at the end of Paragraph 2.1.1 the following sentence:

“Other manufacturers meeting the requirements of this specification are acceptable.”

Section 02741/R 17

SECTION 02741/R

BITUMINOUS CONCRETE PAVEMENT

Delete:

UNI 2332/1 (1979) Testing sieves and their bases and covers. Dimension and tolerances.

UNI 2334 (1943) Testing sieves and their bases and covers.

Legislative Decreec No. 528 (1999) Amendments to the legislative decree of 14 August 1996 no. 494, implementing Directive 92/57/EEC concerning minimum safety and health requirements at temporary or mobile work sites.

Section 02761/R 18

SECTION 02761/R

PAVEMENT MARKING

Add at the end of Paragraph 2.1.2.2 the following sentence:

“Other manufacturers meeting the requirements of this specification are acceptable.”

ASHE 13-1020 19

SCHEDULE OF WORK ITEMS

1. EACH ITEM OF THE SCHEDULE IS INCLUSIVE OF FURNISHING AND

INSTALLATION OF MATERIALS AND EQUIPMENT, SCAFFOLDING,

TRANSPORTATION TO DUMP OR STORAGE OF DEMOLISHED AND/OR

REMOVED MATERIALS, IN ACCORDANCE WITH CONTRACTING OFFICER'S

INSTRUCTIONS AND ALL FINISHING WORK REQUIRED TO MAKE EACH

ITEM COMPLETE IN A WORKMANLIKE MANNER.

2. ALL THE QUANTITIES THAT ARE INDICATED OR SUCCESSIVELY ADDED,

ARE ESTIMATES. THEREFORE THE GOVERNMENT SHALL BE NOT HELD

RESPONSIBLE FOR THE ACCURACY OF THE ESTIMATED QUANTITIES.

THE CONTRACT REQUIRES A COMPLETED PROJECT ON A LUMP SUM

BASIS.

IT IS THEREFORE THE RESPONSIBILITY OF THE CONTRACTOR TO

CALCULATE, FORESEE AND PERFORM ALL QUANTITIES AND WORK

NECESSARY EVEN IF NOT MENTIONED IN THE SPECIFICATIONS BUT

INCLUDED IN THE DRAWINGS OR MANIFESTLY NECESSARY TO DELIVER

A COMPLETE PROJECT BASED ON ITS OVERALL SCOPE.

ASHE 13-1020 20

TABLE OF CONTENTS

A – STORM WATER DRAINAGE NETWORK – NEW WORKS

PART IA – Excavations and removals

PART IIA – Civil work

B – OWS SYSTEM – NEW WORKS

PART IB – Excavations and removals

PART IIB – Civil work

C – DRAINAGE FIELDS – DEMOLITION WORKS

PART IC – Demolitions

D – DRAINAGE FIELD – REPAIR WORKS

PART ID – Excavations and removals

PART IID – Civil work

ASHE 13-1020 21

SCHEDULE OF WORK ITEMS

A – STORM WATER DRAINAGE NETWORK – NEW WORKS

PART IA – Excavations and removals

1. Job site mobilizationtion and Demobilization

Item includes:

- All operations described in SECTION AC1.

Lump Sum

2. Pavement cutting for asphalt removal of unspecified thickness, performed with asphalt cutting machine.

- All operations necessary for the workmanlike execution of the work

2654,00 Lm

3. Demolition of bituminous concrete pavement consisting of foundation course, base course, binder course and wearing course.

work.

494,00 Cu.m

4. Trench excavation for the installation of new storm drainage pipelines and pits.

- Removal, store and reinstallation of prefabricated reinforced concrete elements, as indicated by contracting officer.

- Restoration of disturbed contiguous areas.

a. Excavation on bituminous concrete pavement 1,686.00 Cu.m

b. Excavation on earth 298.00 Cu.m

5. Demolition and removal of existing storm drainage pipelines.

- Trench excavation

- Filling of cavities with compacted dry material, to restore grade where necessary.

212.00 Lm

ASHE 13-1020 22

6. Demolition and removal of catch basins, including covers.

- Transportation of metal covers to authorized public dump or on-base storage areas as directed by the Contracting Officer’s

Technical Representative.

- Filling of cavities with compacted dry material, to restore grade where necessary.

13 Ea.

7. Loading and transportation of not reused resulting materials to authorized public dump area.

- Disposal fee;

1257,00 Cu.m

8. Furnishing and installation of steel forms “Pilosio” type or equal approved for trench shoring;

ASHE 13-1020 23

PART IIA – Civil work

1. Furnishing and installation of heavy PVC pipe, for storm water drainage, including all necessary fittings, and appurtenances.

a. 200 mm exterior diameter pipe 41,00 Lm

b. 250 mm exterior diameter pipe 85,00 Lm

c. 315 mm exterior diameter pipe 501,00 Lm

d. 400 mm exterior diameter pipe 185,00 Lm

e. 500 mm exterior diameter pipe 297,00 Lm

f. 630 mm exterior diameter pipe 21,00 Lm

g. 710 mm exterior diameter pipe 21,00 Lm

h. 800 mm exterior diameter pipe 180,00 Lm

2. Pipe bedding with gravel and sand material. Bedding material shall be conform to Section 02315 of the Technical Specifications.

- Bedding material supply and transportation;

535,00 Cu.m

3. Backfilling and compaction of excavated trenches. Backfill with selected resulting material shall conform to Section 02315 of the

Technical Specifications.

1221,00 Cu.m

4. Furnishing and installation of 3mm diameter copper tracer wire along polyethylene pipelines.

Item includes

- Wire location as shown on drawings.

1330,00 Lm

5. Furnishing and installation of warning tape with sign indicating the buried utilities (Drainage).

- Tape location as shown on drawings.

1330,00 Lm

ASHE 13-1020 24

6. Furnishing and installation of storm drainage pits, with D400 class cast-iron frame and cover or grate.

- Placing of pit.

- C20/25 concrete setting bed, and outer box.

- Backfilling with dry gravel material and compaction.

a. 80x80x120 cm concrete pit, with D400 cover

52 Ea.

b. 120x120X120 cm concrete pit, with D400 cover

8 Ea.

c. 80x80x20 cm concrete pit extension, item includes joints sealing with cement mortar;

406 Ea.

d. 120x120x20 cm concrete pit extension, item includes joints sealing with cement mortar;

63 Ea.

e. Ø240x150 glass fiber reinforced polymer (GRFP) storm chamber manhole with interior divider plate including Ø800 and Ø500 pipe fittings, inspection pit and C20/25 concrete divider slab.

1 Ea.

f. PVC hydraulic joints for the connection between storm pits and piping network.

162 Ea.

7. Furnishing and installation of prefabricated reinforced concrete perimetral culvert, including inspection pits with D-400 cast iron grate.

- Placing of culverts and pits.

- C20/25 concrete setting bed, and outer box.

- Backfilling with dry gravel material.

- Compaction.

a. 50x50x10cm precast concrete culvert

88,00 Lm.

ASHE 13-1020 25

b. 50x50 cm concrete catch basin, 80cm height, with grate

6,00 Ea.

8. Existing catch-basin upgrading to achieve new invert elevation as shown on sheets C-14, C-15, C-16, C-17 AND C-18.

- Holes construction for new piping housing

- Placing of C16/20 lean concrete;

- Reshaping of catch basin bottom level including groutings and fittings

9. Cleaning of existing continuous grating located on west side of pharmacy storage area.

- Removal of debris and shrubs from continuous pit bottom;

- Cleaning of continuous metal grating

10. Restoration of bituminous concrete pavement areas involved by the works;

- Furnishing and placing of gravel material, 40-50 mm granulometry, average thickness 30 cm, to provide for base road, compacted to a density not below 95% of modified AASHO testing.

- Furnishing and placing of 10 cm minimum thickness bituminous concrete base course.

- Furnishing and placing of 6 cm thick bituminous concrete binder course, including tack coat(1.5 kg/sq.m).

- Furnishing and placing of 3 cm thick bituminous concrete wearing course, including tack coat (1 kg/sq.m).

994,00 sq.m

11. Painting of 12 cm wide marking strips on bituminous concrete pavement with white or yellow paint as directed by the Contracting

Officer’s Technical Representative.

- Cleaning of road pavement.

Lump sum

ASHE 13-1020 26

12. Generation of as-built drawings.

- 1 (ONE) electronic copy and 1 (ONE) polyester copy of the AS-

BUILT drawings, pertaining all Civil performed works. AS-

BUILTS shall be signed and stamped by a professional Engineer and/or Architect enrolled in their respective Boards in accordance with their own competencies and responsibilities in accordance with the current Italian Laws.

ASHE 13-1020 27

B – OWS SYSTEM – NEW WORKS

PART IB – Excavations and removals

1. Job site mobilizationtion and Demobilization

- All operations described in SECTION AC1.

2. Pavement cutting for asphalt removal of unspecified thickness,

70.00 Lm

3. Demolition of bituminous concrete pavement consisting of foundation

145,00 Cu.m

4. Excavation in any kind of soil and compactness to provide new Oil

Water Separators housing.

concrete elements, as indicated by contracting officer.

938,00 Cu.m

5. Loading and transportation of resulting materials to authorized public dump area.

277,00 Cu.m

ASHE 13-1020 28

PART IIB – Civil work

1. Furnishing and installation of glass fiber reinforced polymer (GRFP) oil water separator with double containment system provided with continuous monitoring system of the interstitial space. Rated capacity 300 l/sec, external dimension 10200mm x Ø2400mm, compliant with UNI EN 85 and D.L. 152/06.

- Provisional bulkhead for excavation shoring;

- Foundation soil grading and compaction below the system;

- Class 25/30 concrete foundation reinforced with double welded wire fabric, 20x20cm dia. 12mm, including C16/20 concrete subbase;

- Lamellar pack, coalescent filter and automatic closing valve;

- Monitoring unit and electrical panel with optical and sound alarm including furnishing and installation of electric feeding line from bldg 1032;

- Ows strengthening for backfilling over 2.0m

- Jointing pipes, precast concrete inspection pits with D400 cast iron covers including C20/25 concrete divider slab;

1 Ea.

2. Backfilling and compaction of excavated soil. Backfill with selected resulting material shall conform to Section 02315 of the Technical

Specifications.

- Furnishing and placing of gravel material, 8/20mm granulometry, to provide for 30cm thick OWS base and side filling, as shown on drawings and OWS installation manual;

a. Gravel material, 8/20mm granulometry 86,00 Cu.m

b. Backfilling of previous excavated soil 806.00 Cu.m

3. Restoration of bituminous concrete pavement areas involved by works;

road, compacted to a density not below 95% of modified AASHO testing.

- Furnishing and placing of 10 cm minimum thickness bituminous concrete base course.

- Furnishing and placing of 6 cm thick bituminous concrete binder course, including tack coat(1.5 kg/sq.m).

- Furnishing and placing of 3 cm thick bituminous concrete wearing course, including tack coat (1 kg/sq.m).

290,00 sq.m

ASHE 13-1020 29

C – DRAINAGE FIELDS – DEMOLITION WORKS

PART IC – Demolitions

1. Pavement cutting for asphalt removal of unspecified thickness,

100.00 Lm

2. Demolition of bituminous concrete pavement consisting of foundation

70,00 Cu.m

3. Demolition and removal of existing Dry well systems, composed by reinforced or not reinforced pits and basin, as shown on drawings.

DWs will be inspected to verify the presence/absence of sediments at the bottom. If present, sediments will be removed and disposed of according to applicable regulations prior to remove the DW; the

Contractor will result the producer of the waste. Contractor shall prepare for each DW the DRYWELL DATA SHEET, enclosed to this project.

The following DWs shall be removed:

ASHE01010WATR10(Dw-3) ASHE01010WATR7(Dw-2) ASHE01010WATR8(Dw-1)

ASHE01010WATR9(Dw-4) ASHE01018WATR3(Dw-10) ASHE01030WATR1(Dw-8)

ASHE01030WATR2(Dw-5) ASHE01030WATR3(Dw-7) ASHE01030WATR4(Dw-6)

ASHE01032WATR1(Dw-12) ASHE01035WATR1(Dw-11) ASHE01035WATR2(Dw-14)

ASHE01036WATR19(Dw-9) ASHE01032WATR2(Dw-13)

- Soil and material excavation as necessary to allow system demolition;

- demolition of existing structures down to at least 1.5 m below grade to allow for possible future installation of new utilities

- Capping of no more necessary feeding and discharging pipes;

- Backfiling of DW remaining sections with previous excavated soil material.

- Collection of confirmatory samples from the bottom of the DW;

wherever possible, sediment samples will be collected; if no sediments are present, a shallow soil sample will be taken using direct push or equivalent technology from the bottom of the well. If not feasible, a dry continuos coring will be conducted to a depth of 1 meter below the bottom of the DW.

- Laboratory analyses;

- Contaminated soil remaining, if necessary;

- Loading and transportation of resulting materials to authorized public dump area, including disposal burden.

ASHE 13-1020 30

14 Ea.

4. Demolition and removal of existing oil water separator systems reinforced or not reinforced pits and basin, as shown on drawings.

The following OWs shall be removed:

Ows-1, Ows-2, Ows-3 and Ows-4.

- Soil and material excavation as necessary to allow system demolition;

- Emptying, cleaning and watering of the system parts before demolition;

- Capping of system to be demolished no more necessary feeding and discharging pipes;

- Contaminated soil remaining, if necessary;

- Loading and transportation of resulting materials to authorized public dump area, including disposal burden.

4 Ea.

5. Loading and transportation of resulting materials to authorized

170,00 Cu.m

ASHE 13-1020 31

D – DRAINAGE FIELD – REPAIR WORKS

PART ID – Excavations and removals

1. Excavation in any kind of soil and compactness to provide new

Drainage Field housing.

Contractor shall verify on site the exact location and depth of existing underground utility before starting work.

Contractor shall predispose all proceedings to ensure the correct operation of the utilities during the execution of works concrete elements, as indicated by contracting officer

4651,00 Cu.m

2. Loading and transportation of resulting materials to authorized

798,00 Cu.m

ASHE 13-1020 32

PART IID – Civil work

1. Furnishing and installation of Drainage Field Basin

- Soil grading and compaction below Drainage Field;

- Furnishing and placing of gravel material, 20-40 mm granulometry, average thickness 50 cm;

- Thermoplastic net (maximum mesh size 20 x 20 mm) to be installed over the entire gravel layer surface;

- Modular plastic elements to be installed above the grave/net layer leaving a 75-cm-wide space between the modular units and the excavation side, all along the excavation perimeter.

- Filling with clean gravel, 20-40mm granulometry, of the space between the excavation walls and the perimeter elements, and between adjacent drainage elements.

- Geotextile fabric (120 g/sqm) strip to be placed along excavation walls and below the first three rows of plastic modular elements

- Compacted gravel material, 20-40 mm granulometry, average thickness 15 cm, to be placed above modular plastic elements.

- Geotextile fabric layer (120 g/sqm) to be placed over the top gravel layer, minimum overlapping 30cm

- Connections to the existing drainage line as shown on drawings;

- PVC pipe, for storm water distribuition including all necessary fittings, and appurtenances

- Earth backfilling with the previous excavated material and compaction;

- Metal sign indicating location of “Buried Drainage Field”, contractor shall submit sign proposal to BCE for approval.

2. Furnishing and installation of precast concrete box elements, internal section 120x120 cm for construction of distribuition manhole.

Item includes

- Socket connection system,fittings;

- 80x80cm manhole rising with D400 class cast iron covers

- Foundation soil grading and compaction below manhole;

- New Class 20/25 concrete foundation reinforced with welded wire fabric, 15x15cm dia. 8mm, including concrete lean sub base.

- Backfilling.

25 ea

3. Backfilling and compaction of excavations for OWS and DW removal with resulting material from previous trench excavations. Backfill with selected resulting material shall conform to Section 02315 of the Technical Specifications.

ASHE 13-1020 33

530,00 Cu.m

4. Backfilling and compaction of drainage field excavation with resulting material from previous excavations. Backfill with selected resulting material shall conform to Section 02315 of the Technical

Specifications.

3323,00 Cu.m

5. Restoration of bituminous concrete pavement areas involved in OWS and DW removal works;

road, compacted to a density not below 95% of modified AASHO testing.

- Furnishing and placing of 10 cm minimum thickness bituminous concrete base course.

- Furnishing and placing of 6 cm thick bituminous concrete binder course, including tack coat(1.5 kg/sq.m).

- Furnishing and placing of 3 cm thick bituminous concrete wearing course, including tack coat (1 kg/sq.m).

162,00 sq.m

6. Restoration of turf areas involved by the works;

- 15cm thick top soil;

- 20cm thick granular fill

- Grass seeding and fertilize the topsoiled areas

1368,00 sq.m

7. Repair/reroute works of existing utility lines eventually damaged during demolition/construction works.