APPENDIX B - PERFORMANCE WORK STATEMENT FOR FIRE ALARM SYSTEM MAINTENANCE AVIANO GHEDI AB
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR FIRE SYSTEMS
AT THE AVIANO & GHEDI (BRESCIA) AIR BASES, ITALY
APPENDIX - B: MANDATORY ITM SERVICE
PERFORMANCE WORK STATEMENT FOR THE FIRE SYSTEMS AT THE AVIANO AND GHEDI (BRESCIA) AIR BASES, ITALY
5 Year - Frequency Summary Weekly Monthly Quarterly Semi-Annual Annual 2 Years 3 Years 5 Years 6-12 Years
Base 52 12 4 2 1 1
Option 1 52 12 4 2 1 1
Option 2 52 12 4 2 1 1
Option 3 52 12 4 2 1 1
Option 4 52 12 4 2 1 1
PERFORMANCE WORK STATEMENT FOR FIRE SYSTEMS AT THE AVIANO AND GHEDI (BRESCIA) AIR BASES, ITALY
Tasks Monthly UFC - Table 2-1 Unmonitored control panel & annunciator equipment 1 Inspection - Report
UNI 11224 Fire Detection & Alarm Systems 10 Inspection & Test - Report (Note 1) Additional request Clean conventional smoke detectors (each time other 20% of total) 1 Ordinary Maintenance - Report Additional request Clean addressable smoke detectors (all those over 50% dirt reading) 1 Ordinary Maintenance - Report UFC - Table 2-1 Monitored control panel & annunciator equipment 3 Inspection & Test - Report UFC - Table 2-1 Initiating devices (manual stations, flame optical & gas detectors) 5 Inspection & Test - Report UFC - Table 2-1 Notification appliances & voice communication 1 Inspection & Test - Report UFC - Table 2-1 Digital alarm transmitters & receivers 1 Inspection & Test - Report
2 Years UFC - Table 2-1 Initiating devices (manual stations, heat, smoke/optical detectors, supervisory devices) 6 Inspection & Test - Report 5 Years UFC - Table 2-1 Smoke detectors (remove devices not required by UFC 3-600-01) 1 Inspection & Test - Report
10 Years UNI 11224 System general overhaul 1 Ordinary Maintenance - Report
Building Inspection UFC - Table 2-1 Entire system 2 Inspection - Report
Tasks UNI 12845 - 20.2.2.2 Check & annotate 2 Inspection & Test - Report (Note 1)
Weekly UNI 12845 - 20.2.2.3 Testing Gong 1 Inspection & Test - Report UNI 12845 - 20.2.2.6 Space heating systems & heating cables 2 Inspection & Test - Report UFC - Table 2-2 - Wet UFC - Table 2-3 - Dry
Monthly UFC - Table 2-4 - Deluge Control valves (without seal, lock, or electric supervision) 1 Inspection - Report UFC - Table 2-5 - Pre-Action UFC - Table 2-9 - Foam UNI 12845 - 20.3.2.2 Verify Fire Risk Level (if same or modified) 1 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.2.3 Sprinkler Heads, Heat Operated Valves (multiple control) & Spray Nozzles 3 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.2.4 Piping & Piping Hangers 4 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.2.5 Water Supply & Related Alarms 1 Inspection & Test - Report (Note 2) UNI 12845 - 20.3.2.6 Power Supply 1 Inspection & Test - Report UNI 12845 - 20.3.2.7 Sectioning Valves 1 Inspection & Test - Report UNI 12845 - 20.3.2.8 Flow Switches 1 Inspection & Test - Report UNI 12845 - 20.3.2.9 Spare Parts 1 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.3.2 Dry alarm valves 11+14 Inspection & Test - Report UNI 12845 - 20.3.3.3 Connection to FACP forwarding activation to Fire Department 1 Inspection & Test - Report UFC - Table 2-9 - Foam Foam concentrate 1 Inspection - Report UFC - Table 2-9 - Foam Foam proportioning system 2 Inspection & Test - Report UFC - Table 2-2 - Wet Control valves (without seal, lock, or electric supervision) 1 Inspection - Report UFC - Table 2-2 - Wet Water flow alarm devices 2 Inspection & Test - Report UFC - Table 2-2 - Wet Alarm valves & trim 2 Inspection - Report UFC - Table 2-2 - Wet Main drain 4 Inspection & Test - Report UFC - Table 2-2 - Wet Fire Department truck connection 2 Inspection - Report UFC - Table 2-3 - Dry Control valves (without seal, lock, or electric supervision) 1 Inspection - Report UFC - Table 2-3 - Dry Water flow alarm devices 2 Inspection & Test - Report UFC - Table 2-3 - Dry Dry pipe alarm valve & trim 2 Inspection - Report UFC - Table 2-3 - Dry Main drain 4 Inspection & Test - Report UFC - Table 2-3 - Dry Fire Department truck connection 2 Inspection - Report UFC - Table 2-3 - Dry Dry pipe alarm valve enclosure heating 1 Inspection - Report UFC - Table 2-3 - Dry Low temperature Alarm 1 Inspection & Test - Report UFC - Table 2-3 - Dry Low points drain 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Control valves (without seal, lock, or electric supervision) 1 Inspection - Report UFC - Table 2-4 - Deluge Water flow alarm devices 2 Inspection & Test - Report UFC - Table 2-4 - Deluge Deluge alarm valve & trim 2 Inspection - Report UFC - Table 2-4 - Deluge Main drain 4 Inspection & Test - Report UFC - Table 2-4 - Deluge Fire Department truck connection 2 Inspection - Report UFC - Table 2-4 - Deluge Valve and Riser Heated Enclosure (if provided) 1 Inspection - Report UFC - Table 2-4 - Deluge Low temperature Alarm 1 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Control valves (without seal, lock, or electric supervision) 1 Inspection - Report UFC - Table 2-5 - Pre-Action Water flow alarm devices 2 Inspection & Test - Report
Quarterly
Semi-Annual
Annual
Automatic Fire Detection Systems, Manual Stations, and Monaco Transceivers
Water Based Fire Suppression Systems
Semi-Annual
Annual
Note 1: UNI 11224 Overrides "Annual" and "2 Years" tasks listed on UFC-Table 2-1.
UFC - Table 2-5 - Pre-Action Pre-Action valve & trim 2 Inspection - Report UFC - Table 2-5 - Pre-Action Main drain 4 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Fire Department truck connection 2 Inspection - Report UFC - Table 2-5 - Pre-Action Valve and Riser Heated Enclosure (if provided) 1 Inspection - Report UFC - Table 2-5 - Pre-Action Low temperature Alarm 1 Inspection & Test - Report UFC - Table 2-9 - Foam Control valves (without seal, lock, or electric supervision) 1 Inspection - Report UFC - Table 2-9 - Foam Foam concentrate 1 Inspection & Test - Report UFC - Table 2-9 - Foam Foam Concentrate Strainers 1 Inspection & Test - Report UFC - Table 2-12 - High Expansion Foam concentrate 2 Inspection & Test - Report UFC - Table 2-12 - High Expansion Foam generators 1 Inspection - Report UFC - Table 2-2 - Wet Control valves 2 Inspection & Ordinary Maintenance - Report UFC - Table 2-3 - Dry Control valves 2 Inspection & Ordinary Maintenance - Report UFC - Table 2-3 - Dry Dry pipe alarm valves 3 Inspection & Ordinary Maintenance - Report UFC - Table 2-3 - Dry Quick-opening devices 1 Inspection & Test - Report UFC - Table 2-3 - Dry Low air pressure alarm 1 Inspection & Test - Report UFC - Table 2-3 - Dry Automatic air pressure maintenance devices 1 Inspection - Report UFC - Table 2-4 - Deluge Control valves 2 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Deluge alarm valves 3 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Low points drain 1 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Control valves 2 Inspection & Ordinary Maintenance - Report UFC - Table 2-5 - Pre-Action Pre-Action alarm valves 3 Inspection & Ordinary Maintenance - Report UFC - Table 2-5 - Pre-Action Low points drain 1 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Air Supply (if present) 2 Inspection & Test - Report UFC - Table 2-9 - Foam Control valves 2 Inspection & Ordinary Maintenance - Report UFC - Table 2-9 - Foam Foam proportioning system 2 Inspection & Test - Report UFC - Table 2-9 - Foam Actuators 1 Inspection & Test - Report UFC - Table 2-9 - Foam Distribution system 2 Inspection & Test - Report UFC - Table 2-9 - Foam Foam concentrate strainers 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-12 - High Expansion Foam generator 1 Inspection & Test - Report UFC - Table 2-12 - High Expansion Actuators 1 Inspection & Test - Report UFC - Table 2-12 - High Expansion Foam proportioning system 2 Inspection & Test - Report UFC - Table 2-12 - High Expansion Control valves 2 Inspection & Ordinary Maintenance - Report
3 Years UNI 12845 - 20.3.5.3 Sectioning valves, alarm valves & check valves 1 Inspect. & Ord. Maintenance - Report (Note 3) UFC - Table 2-2 - Wet Alarm Valve 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-2 - Wet Anti-freeze loops 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-3 - Dry Strainers 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Strainers 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-5 - Pre-Action Strainers 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-9 - Foam Balancing valve 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-9 - Foam Strainers 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-2 - Wet Gauges 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-3 - Dry Gauges 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Gauges 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Deluge valve 1 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Gauges 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-9 - Foam Foam concentrate tank 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-2 - Wet Fats Response sprinklers& Extra High temperature sprinklers 1 Inspection & Test - Report
20 Years UFC - Table 2-3 - Dry Fats Response sprinklers& Extra High temperature sprinklers 1 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Fats Response sprinklers& Extra High temperature sprinklers 1 Inspection & Test - Report UFC - Table 2-2 - Wet Standard sprinklers 1 Inspection & Test - replace if needed - Report
50 Years UFC - Table 2-3 - Dry Standard sprinklers 1 Inspection & Test - replace if needed - Report UFC - Table 2-5 - Pre-Action Closed-Head sprinklers 1 Inspection & Test - replace if needed - Report
After Activation UFC - Table 2-4 - High Expansion Strainers 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-2 - Wet Main Drain 1 Inspection & Test - Report UFC - Table 2-3 - Dry Main Drain 2 Inspection & Test - Report UFC - Table 2-4 - Deluge Main Drain 2 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Main Drain 2 Inspection & Test - Report UFC - Table 2-9 - Foam Main Drain 1 Inspection & Test - Report UFC - Table 2-12 - High Expansion Main Drain 2 Inspection & Test - Report
2 years
5 years
10 Years
Following System Modification or
Repair
UFC - Table 2-2 - Wet Entire System 1 Inspection - Report UFC - Table 2-3 - Dry Entire System 1 Inspection - Report UFC - Table 2-4 - Deluge Entire System 2 Inspection - Report UFC - Table 2-5 - Pre-Action Entire System 2 Inspection - Report UFC - Table 2-9 - Foam Entire System 3 Inspection - Report UFC - Table 2-12 - High Expansion Entire System 2 Inspection - Report
Tasks Semi-Annual UFC - Table 2-13 - Standpipe Hose connection and pressure reducing valves 1 Inspection - Report
UFC - Table 2-13 - Standpipe Piping 1 Inspection - Report UFC - Table 2-13 - Standpipe Control valves 2 Inspection & Ordinary Maintenance - Report
5 Years UFC - Table 2-13 - Standpipe Backup batteries (where applicable) 1 Inspection & Test - Report
UFC - Table 2-13 - Standpipe Entire System 1 Inspection - Report
Tasks UNI 12845 - 20.2.2.2 Check & annotate 3 Inspection & Test - Report UNI 12845 - 20.2.2.4 Testing fire pump for automatic activation 4 Inspection & Test - Report UNI 12845 - 20.2.2.5 Testing diesel fire pump after automatic activation 2 Inspection & Test - Report UNI 12845 - 20.2.2.6 Anti-freeze System (space heaters & heating cables) 1 Inspection & Test - Report UNI 12845 - 20.2.3 Backup batteries (where applicable) 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-16 Pump House 1 Inspection - Report UFC - Table 2-16 Control valves & isolating valves 1 Inspection - Report UFC - Table 2-16 Pressure gauges 1 Inspection - Report UFC - Table 2-16 Controllers 3 Inspection - Report UFC - Table 2-16 Batteries 1 Inspect. & Ord. Maintenance - Report (Note 1) UFC - Table 2-16 Pumps 5 Inspection & Test - Report
Quarterly UNI 12845 - 20.3.2.6 Power Supply 1 Inspection & Test - Report UNI 12845 - 20.3.4.2 Automatic fire pump flow test 1 Inspection & Test - Report UNI 12845 - 20.3.4.3 Missing fire pump automatic activation test 2 Inspection & Test - Report UNI 12845 - 20.3.4.4 Floating valves in water reservoirs 1 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.4.5 Suction chamber & pump filter 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-16 Control valves 1 Inspection - Report UFC - Table 2-16 Controllers 3 Inspection & Ordinary Maintenance - Report UFC - Table 2-16 Pumps 5 Inspection & Ordinary Maintenance - Report UFC - Table 2-16 Fuel (engine-driven pumps) 1 Inspection - Report UFC - Table 2-16 Relief valves 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-16 Emergency power supply 1 Inspection & Test - Report UNI 12845 - 20.3.5.2 Accumulating tanks & pressurized vessels 2 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.5.3 Sectioning valves, alarm valves & check valves 1 Inspection & Ordinary Maintenance - Report
5 Years UFC - Table 2-16 Pump 1 Inspection & Test - Report 10 Years UNI 12845 - 20.3.6 Water reservoirs (only Bldg. 219) 1 Inspection & Ordinary Maintenance - Report
Dry Chemical Systems - Includes Commercial Kitchen Suppression Tasks Semi-Annual UFC - Table 2-18 - Dry Chemical Piping 1 Inspection - Report
UFC - Table 2-18 - Dry Chemical Storage vessels 2 Inspection & Test - Report UFC - Table 2-18 - Dry Chemical Agent 1 Inspection & Test - Report UFC - Table 2-18 - Dry Chemical Actuators 4 Inspection & Test - Report
Annual UFC - Table 2-18 - Dry Chemical Actuators 1 Ordinary Maintenance - Report 5-12 Years UFC - Table 2-18 - Dry Chemical Storage vessels 1 Ordinary Maintenance - Report part of building inspection UFC - Table 2-18 - Dry Chemical Entire System 2 Inspection - Report
As part of building inspection
2 Years
As part of building inspection
Weekly
Monthly
Note 1: UNI 12845 overrides entirely "Monthly" tasks listed on UFC-Table 2-2, 2-3, 2-4, 2-5, 2-9, & 2-12.
Note 2 - Some water supply lines have PIV with tamper switches that are required to be tested.
Standpipe Systems
Fire Pumps & Air Compressors
Annual
2 Years
3 Years
Note 3: UNI 12845 overrides "5 Years" tasks listed on UFC-Table 2-2
Note 1: UFC-Table 2-16 overrides "Monthly" tasks listed on UNI 12845 - 20.2.3.
Tasks UFC - Table 2-19 - Wet Chemical Piping 1 Inspection - Report UFC - Table 2-19 - Wet Chemical Storage vessels 2 Inspection & Test - Report UFC - Table 2-19 - Wet Chemical Agent 1 Inspection & Test - Report UFC - Table 2-19 - Wet Chemical Actuators 4 Inspection & Test - Report
Annual UFC - Table 2-19 - Wet Chemical Actuators 1 Ordinary Maintenance - Report 5-12 Years UFC - Table 2-19 - Wet Chemical Storage vessels 1 Ordinary Maintenance - Report
UFC - Table 2-19 - Wet Chemical Entire System 2 Inspection - Report
Tasks UFC - Table 2-21 Piping 1 Inspection - Report UFC - Table 2-21 Flexible Hoses 1 Inspection - Report UFC - Table 2-21 Storage vessels 1 Inspection - Report UFC - Table 2-21 Agent & Propellant 2 Inspection & Test - Report UFC - Table 2-21 Actuators 2 Inspection & Test - Report UFC - Table 2-21 Auxiliary equipment 1 Inspection & Test - Report UFC - Table 2-21 Valves 1 Inspection - Report
2 Years UFC - Table 2-21 Protected enclosure/room 1 Inspection & Test - Report 5 Years UFC - Table 2-21 Storage vessels 2 Inspection & Test - Report
As Required UFC - Table 2-21 Protected enclosure/room 1 Inspection & Test - Report UFC - Table 2-21 After modification to compartment/protected enclosure 1 Inspection & Ordinary Maintenance - Report
UFC - Table 2-21 Entire System 2 Inspection - Report
As part of building inspection
Wet Chemical Systems - Includes Commercial Kitchen Suppression
Annual
As part of building inspection
Clean Agent (Gas) Extinguishing Systems
Semi-Annual
| Cover |
| 5 Year |
| ITM Standards |