FA5682-14-T-0001_APPENDIX_B_MANDATORY_ITM_SYSTEM.pdf

PDF 76 KB Posted

Attached to
FA5682-14-T-0001 FIRE ALARM SYSTEM MAINTENANCE/TESTING SERVICE FOR AVIANO AND GHEDI AB, ITALY
Solicitation number
FA5682-14-T-0001
Issued by

About this file

APPENDIX B - PERFORMANCE WORK STATEMENT FOR FIRE ALARM SYSTEM MAINTENANCE AVIANO GHEDI AB

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR FIRE SYSTEMS

AT THE AVIANO & GHEDI (BRESCIA) AIR BASES, ITALY

APPENDIX - B: MANDATORY ITM SERVICE

PERFORMANCE WORK STATEMENT FOR THE FIRE SYSTEMS AT THE AVIANO AND GHEDI (BRESCIA) AIR BASES, ITALY

5 Year - Frequency Summary Weekly Monthly Quarterly Semi-Annual Annual 2 Years 3 Years 5 Years 6-12 Years

Base 52 12 4 2 1 1

Option 1 52 12 4 2 1 1

Option 2 52 12 4 2 1 1

Option 3 52 12 4 2 1 1

Option 4 52 12 4 2 1 1

PERFORMANCE WORK STATEMENT FOR FIRE SYSTEMS AT THE AVIANO AND GHEDI (BRESCIA) AIR BASES, ITALY

Tasks Monthly UFC - Table 2-1 Unmonitored control panel & annunciator equipment 1 Inspection - Report

UNI 11224 Fire Detection & Alarm Systems 10 Inspection & Test - Report (Note 1) Additional request Clean conventional smoke detectors (each time other 20% of total) 1 Ordinary Maintenance - Report Additional request Clean addressable smoke detectors (all those over 50% dirt reading) 1 Ordinary Maintenance - Report UFC - Table 2-1 Monitored control panel & annunciator equipment 3 Inspection & Test - Report UFC - Table 2-1 Initiating devices (manual stations, flame optical & gas detectors) 5 Inspection & Test - Report UFC - Table 2-1 Notification appliances & voice communication 1 Inspection & Test - Report UFC - Table 2-1 Digital alarm transmitters & receivers 1 Inspection & Test - Report

2 Years UFC - Table 2-1 Initiating devices (manual stations, heat, smoke/optical detectors, supervisory devices) 6 Inspection & Test - Report 5 Years UFC - Table 2-1 Smoke detectors (remove devices not required by UFC 3-600-01) 1 Inspection & Test - Report

10 Years UNI 11224 System general overhaul 1 Ordinary Maintenance - Report

Building Inspection UFC - Table 2-1 Entire system 2 Inspection - Report

Tasks UNI 12845 - 20.2.2.2 Check & annotate 2 Inspection & Test - Report (Note 1)

Weekly UNI 12845 - 20.2.2.3 Testing Gong 1 Inspection & Test - Report UNI 12845 - 20.2.2.6 Space heating systems & heating cables 2 Inspection & Test - Report UFC - Table 2-2 - Wet UFC - Table 2-3 - Dry

Monthly UFC - Table 2-4 - Deluge Control valves (without seal, lock, or electric supervision) 1 Inspection - Report UFC - Table 2-5 - Pre-Action UFC - Table 2-9 - Foam UNI 12845 - 20.3.2.2 Verify Fire Risk Level (if same or modified) 1 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.2.3 Sprinkler Heads, Heat Operated Valves (multiple control) & Spray Nozzles 3 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.2.4 Piping & Piping Hangers 4 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.2.5 Water Supply & Related Alarms 1 Inspection & Test - Report (Note 2) UNI 12845 - 20.3.2.6 Power Supply 1 Inspection & Test - Report UNI 12845 - 20.3.2.7 Sectioning Valves 1 Inspection & Test - Report UNI 12845 - 20.3.2.8 Flow Switches 1 Inspection & Test - Report UNI 12845 - 20.3.2.9 Spare Parts 1 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.3.2 Dry alarm valves 11+14 Inspection & Test - Report UNI 12845 - 20.3.3.3 Connection to FACP forwarding activation to Fire Department 1 Inspection & Test - Report UFC - Table 2-9 - Foam Foam concentrate 1 Inspection - Report UFC - Table 2-9 - Foam Foam proportioning system 2 Inspection & Test - Report UFC - Table 2-2 - Wet Control valves (without seal, lock, or electric supervision) 1 Inspection - Report UFC - Table 2-2 - Wet Water flow alarm devices 2 Inspection & Test - Report UFC - Table 2-2 - Wet Alarm valves & trim 2 Inspection - Report UFC - Table 2-2 - Wet Main drain 4 Inspection & Test - Report UFC - Table 2-2 - Wet Fire Department truck connection 2 Inspection - Report UFC - Table 2-3 - Dry Control valves (without seal, lock, or electric supervision) 1 Inspection - Report UFC - Table 2-3 - Dry Water flow alarm devices 2 Inspection & Test - Report UFC - Table 2-3 - Dry Dry pipe alarm valve & trim 2 Inspection - Report UFC - Table 2-3 - Dry Main drain 4 Inspection & Test - Report UFC - Table 2-3 - Dry Fire Department truck connection 2 Inspection - Report UFC - Table 2-3 - Dry Dry pipe alarm valve enclosure heating 1 Inspection - Report UFC - Table 2-3 - Dry Low temperature Alarm 1 Inspection & Test - Report UFC - Table 2-3 - Dry Low points drain 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Control valves (without seal, lock, or electric supervision) 1 Inspection - Report UFC - Table 2-4 - Deluge Water flow alarm devices 2 Inspection & Test - Report UFC - Table 2-4 - Deluge Deluge alarm valve & trim 2 Inspection - Report UFC - Table 2-4 - Deluge Main drain 4 Inspection & Test - Report UFC - Table 2-4 - Deluge Fire Department truck connection 2 Inspection - Report UFC - Table 2-4 - Deluge Valve and Riser Heated Enclosure (if provided) 1 Inspection - Report UFC - Table 2-4 - Deluge Low temperature Alarm 1 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Control valves (without seal, lock, or electric supervision) 1 Inspection - Report UFC - Table 2-5 - Pre-Action Water flow alarm devices 2 Inspection & Test - Report

Quarterly

Semi-Annual

Annual

Automatic Fire Detection Systems, Manual Stations, and Monaco Transceivers

Water Based Fire Suppression Systems

Semi-Annual

Annual

Note 1: UNI 11224 Overrides "Annual" and "2 Years" tasks listed on UFC-Table 2-1.

UFC - Table 2-5 - Pre-Action Pre-Action valve & trim 2 Inspection - Report UFC - Table 2-5 - Pre-Action Main drain 4 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Fire Department truck connection 2 Inspection - Report UFC - Table 2-5 - Pre-Action Valve and Riser Heated Enclosure (if provided) 1 Inspection - Report UFC - Table 2-5 - Pre-Action Low temperature Alarm 1 Inspection & Test - Report UFC - Table 2-9 - Foam Control valves (without seal, lock, or electric supervision) 1 Inspection - Report UFC - Table 2-9 - Foam Foam concentrate 1 Inspection & Test - Report UFC - Table 2-9 - Foam Foam Concentrate Strainers 1 Inspection & Test - Report UFC - Table 2-12 - High Expansion Foam concentrate 2 Inspection & Test - Report UFC - Table 2-12 - High Expansion Foam generators 1 Inspection - Report UFC - Table 2-2 - Wet Control valves 2 Inspection & Ordinary Maintenance - Report UFC - Table 2-3 - Dry Control valves 2 Inspection & Ordinary Maintenance - Report UFC - Table 2-3 - Dry Dry pipe alarm valves 3 Inspection & Ordinary Maintenance - Report UFC - Table 2-3 - Dry Quick-opening devices 1 Inspection & Test - Report UFC - Table 2-3 - Dry Low air pressure alarm 1 Inspection & Test - Report UFC - Table 2-3 - Dry Automatic air pressure maintenance devices 1 Inspection - Report UFC - Table 2-4 - Deluge Control valves 2 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Deluge alarm valves 3 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Low points drain 1 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Control valves 2 Inspection & Ordinary Maintenance - Report UFC - Table 2-5 - Pre-Action Pre-Action alarm valves 3 Inspection & Ordinary Maintenance - Report UFC - Table 2-5 - Pre-Action Low points drain 1 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Air Supply (if present) 2 Inspection & Test - Report UFC - Table 2-9 - Foam Control valves 2 Inspection & Ordinary Maintenance - Report UFC - Table 2-9 - Foam Foam proportioning system 2 Inspection & Test - Report UFC - Table 2-9 - Foam Actuators 1 Inspection & Test - Report UFC - Table 2-9 - Foam Distribution system 2 Inspection & Test - Report UFC - Table 2-9 - Foam Foam concentrate strainers 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-12 - High Expansion Foam generator 1 Inspection & Test - Report UFC - Table 2-12 - High Expansion Actuators 1 Inspection & Test - Report UFC - Table 2-12 - High Expansion Foam proportioning system 2 Inspection & Test - Report UFC - Table 2-12 - High Expansion Control valves 2 Inspection & Ordinary Maintenance - Report

3 Years UNI 12845 - 20.3.5.3 Sectioning valves, alarm valves & check valves 1 Inspect. & Ord. Maintenance - Report (Note 3) UFC - Table 2-2 - Wet Alarm Valve 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-2 - Wet Anti-freeze loops 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-3 - Dry Strainers 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Strainers 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-5 - Pre-Action Strainers 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-9 - Foam Balancing valve 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-9 - Foam Strainers 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-2 - Wet Gauges 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-3 - Dry Gauges 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Gauges 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-4 - Deluge Deluge valve 1 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Gauges 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-9 - Foam Foam concentrate tank 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-2 - Wet Fats Response sprinklers& Extra High temperature sprinklers 1 Inspection & Test - Report

20 Years UFC - Table 2-3 - Dry Fats Response sprinklers& Extra High temperature sprinklers 1 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Fats Response sprinklers& Extra High temperature sprinklers 1 Inspection & Test - Report UFC - Table 2-2 - Wet Standard sprinklers 1 Inspection & Test - replace if needed - Report

50 Years UFC - Table 2-3 - Dry Standard sprinklers 1 Inspection & Test - replace if needed - Report UFC - Table 2-5 - Pre-Action Closed-Head sprinklers 1 Inspection & Test - replace if needed - Report

After Activation UFC - Table 2-4 - High Expansion Strainers 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-2 - Wet Main Drain 1 Inspection & Test - Report UFC - Table 2-3 - Dry Main Drain 2 Inspection & Test - Report UFC - Table 2-4 - Deluge Main Drain 2 Inspection & Test - Report UFC - Table 2-5 - Pre-Action Main Drain 2 Inspection & Test - Report UFC - Table 2-9 - Foam Main Drain 1 Inspection & Test - Report UFC - Table 2-12 - High Expansion Main Drain 2 Inspection & Test - Report

2 years

5 years

10 Years

Following System Modification or

Repair

UFC - Table 2-2 - Wet Entire System 1 Inspection - Report UFC - Table 2-3 - Dry Entire System 1 Inspection - Report UFC - Table 2-4 - Deluge Entire System 2 Inspection - Report UFC - Table 2-5 - Pre-Action Entire System 2 Inspection - Report UFC - Table 2-9 - Foam Entire System 3 Inspection - Report UFC - Table 2-12 - High Expansion Entire System 2 Inspection - Report

Tasks Semi-Annual UFC - Table 2-13 - Standpipe Hose connection and pressure reducing valves 1 Inspection - Report

UFC - Table 2-13 - Standpipe Piping 1 Inspection - Report UFC - Table 2-13 - Standpipe Control valves 2 Inspection & Ordinary Maintenance - Report

5 Years UFC - Table 2-13 - Standpipe Backup batteries (where applicable) 1 Inspection & Test - Report

UFC - Table 2-13 - Standpipe Entire System 1 Inspection - Report

Tasks UNI 12845 - 20.2.2.2 Check & annotate 3 Inspection & Test - Report UNI 12845 - 20.2.2.4 Testing fire pump for automatic activation 4 Inspection & Test - Report UNI 12845 - 20.2.2.5 Testing diesel fire pump after automatic activation 2 Inspection & Test - Report UNI 12845 - 20.2.2.6 Anti-freeze System (space heaters & heating cables) 1 Inspection & Test - Report UNI 12845 - 20.2.3 Backup batteries (where applicable) 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-16 Pump House 1 Inspection - Report UFC - Table 2-16 Control valves & isolating valves 1 Inspection - Report UFC - Table 2-16 Pressure gauges 1 Inspection - Report UFC - Table 2-16 Controllers 3 Inspection - Report UFC - Table 2-16 Batteries 1 Inspect. & Ord. Maintenance - Report (Note 1) UFC - Table 2-16 Pumps 5 Inspection & Test - Report

Quarterly UNI 12845 - 20.3.2.6 Power Supply 1 Inspection & Test - Report UNI 12845 - 20.3.4.2 Automatic fire pump flow test 1 Inspection & Test - Report UNI 12845 - 20.3.4.3 Missing fire pump automatic activation test 2 Inspection & Test - Report UNI 12845 - 20.3.4.4 Floating valves in water reservoirs 1 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.4.5 Suction chamber & pump filter 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-16 Control valves 1 Inspection - Report UFC - Table 2-16 Controllers 3 Inspection & Ordinary Maintenance - Report UFC - Table 2-16 Pumps 5 Inspection & Ordinary Maintenance - Report UFC - Table 2-16 Fuel (engine-driven pumps) 1 Inspection - Report UFC - Table 2-16 Relief valves 1 Inspection & Ordinary Maintenance - Report UFC - Table 2-16 Emergency power supply 1 Inspection & Test - Report UNI 12845 - 20.3.5.2 Accumulating tanks & pressurized vessels 2 Inspection & Ordinary Maintenance - Report UNI 12845 - 20.3.5.3 Sectioning valves, alarm valves & check valves 1 Inspection & Ordinary Maintenance - Report

5 Years UFC - Table 2-16 Pump 1 Inspection & Test - Report 10 Years UNI 12845 - 20.3.6 Water reservoirs (only Bldg. 219) 1 Inspection & Ordinary Maintenance - Report

Dry Chemical Systems - Includes Commercial Kitchen Suppression Tasks Semi-Annual UFC - Table 2-18 - Dry Chemical Piping 1 Inspection - Report

UFC - Table 2-18 - Dry Chemical Storage vessels 2 Inspection & Test - Report UFC - Table 2-18 - Dry Chemical Agent 1 Inspection & Test - Report UFC - Table 2-18 - Dry Chemical Actuators 4 Inspection & Test - Report

Annual UFC - Table 2-18 - Dry Chemical Actuators 1 Ordinary Maintenance - Report 5-12 Years UFC - Table 2-18 - Dry Chemical Storage vessels 1 Ordinary Maintenance - Report part of building inspection UFC - Table 2-18 - Dry Chemical Entire System 2 Inspection - Report

As part of building inspection

2 Years

As part of building inspection

Weekly

Monthly

Note 1: UNI 12845 overrides entirely "Monthly" tasks listed on UFC-Table 2-2, 2-3, 2-4, 2-5, 2-9, & 2-12.

Note 2 - Some water supply lines have PIV with tamper switches that are required to be tested.

Standpipe Systems

Fire Pumps & Air Compressors

Annual

2 Years

3 Years

Note 3: UNI 12845 overrides "5 Years" tasks listed on UFC-Table 2-2

Note 1: UFC-Table 2-16 overrides "Monthly" tasks listed on UNI 12845 - 20.2.3.

Tasks UFC - Table 2-19 - Wet Chemical Piping 1 Inspection - Report UFC - Table 2-19 - Wet Chemical Storage vessels 2 Inspection & Test - Report UFC - Table 2-19 - Wet Chemical Agent 1 Inspection & Test - Report UFC - Table 2-19 - Wet Chemical Actuators 4 Inspection & Test - Report

Annual UFC - Table 2-19 - Wet Chemical Actuators 1 Ordinary Maintenance - Report 5-12 Years UFC - Table 2-19 - Wet Chemical Storage vessels 1 Ordinary Maintenance - Report

UFC - Table 2-19 - Wet Chemical Entire System 2 Inspection - Report

Tasks UFC - Table 2-21 Piping 1 Inspection - Report UFC - Table 2-21 Flexible Hoses 1 Inspection - Report UFC - Table 2-21 Storage vessels 1 Inspection - Report UFC - Table 2-21 Agent & Propellant 2 Inspection & Test - Report UFC - Table 2-21 Actuators 2 Inspection & Test - Report UFC - Table 2-21 Auxiliary equipment 1 Inspection & Test - Report UFC - Table 2-21 Valves 1 Inspection - Report

2 Years UFC - Table 2-21 Protected enclosure/room 1 Inspection & Test - Report 5 Years UFC - Table 2-21 Storage vessels 2 Inspection & Test - Report

As Required UFC - Table 2-21 Protected enclosure/room 1 Inspection & Test - Report UFC - Table 2-21 After modification to compartment/protected enclosure 1 Inspection & Ordinary Maintenance - Report

UFC - Table 2-21 Entire System 2 Inspection - Report

As part of building inspection

Wet Chemical Systems - Includes Commercial Kitchen Suppression

Annual

As part of building inspection

Clean Agent (Gas) Extinguishing Systems

Semi-Annual

Cover
5 Year
ITM Standards

File details come from the government source that posted it. Updated .